Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19137A09515 May 2019Annual Radiological Environmental Operating Report, January 1, 2018 - December 31, 2018.High winds
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML19137A09215 May 2019Annual Radioactive Effluent Release Report, January 1, 2018 - December 31, 2018.Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML19137A09415 May 2019CY-GI-170-300, Revision 36, Offsite Dose Calculation Manual (ODCM) R. E. Ginna Nuclear Power Plant.Boric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML17276A34826 September 2017Generator Tube Inspection ReportNondestructive Examination
ML17142A3069 May 2017Submittal of Core Operating Limits Report Cycle 40, Revision 1Shutdown Margin
ML16097A13829 March 2016Email, G. Wrobel (R.E. Ginna Nuclear Power Plant) to J. Boska (Nrc/Nrr/Jld), Ginna Spent Fuel Pool Comparison to Section 3.3 of EPRI 3002007148
ML16097A15022 January 2016Email, G. Wrobel (R.E. Ginna Nuclear Power Plant) to J. Boska (Nrc/Nrr/Jld), Request for Alternative to NEI 12-06 for Spent Fuel Pool SpraySafe Shutdown Earthquake
Earthquake
ML15189A04930 June 2015Steam Generator Tube Inspection Report Response to Request for Additional InformationNondestructive Examination
Pressure Boundary Leakage
ML15146A17314 May 2015Annual Radiological Environmental Operating Report, January 1, 2014 - December 31, 2014Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML15146A17014 May 2015Annual Radioactive Effluent Release Report, January 1, 2014 - December 31, 2014Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML15146A16914 May 2015Submittal of Annual Radioactive Effluent Release Report, Offsite Dose Calculation Manual, and Annual Radiological Environmental Operating Report for 2014Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML15146A1715 February 2015Offsite Dose Calculation Manual (Odcm), Revision 28Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML15146A17227 June 2014Offsite Dose Calculation Manual (Odcm), Revision 29Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML14176A12916 May 2014Clarification to April 7, 2014 Supplement to Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
Tornado Generated Missile
ML14092A36828 March 2014Independent Spent Fuel Storage Installation, Nine Mile Point, Units I & 2, Independent Spent Fuel Storage Installation, R.E. Ginna, ISFSI, Notification of Expected Date of Transfer of Nuclear Units
ML14093A03126 March 2014Response to Request for Additional Information Regarding License Amendment Request on Revising Section 3.6.5 of the Technical Specifications, Containment Air Temperature
ML14083A40120 March 2014R. E. Ginna, Changes to the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program
ML14051A10712 February 2014Update to Response to NRC Request for Information Pursuant to 10CFR50.54(f) Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SitesFukushima Dai-Ichi
ML14055A04522 January 2014Response to Request for Additional Information Re License Amendment Request on Revising Section 3.6.5 of the Technical Specifications, Containment Air Temperature.
ML14015A36613 January 2014Independent Spent Fuel Storage Installation, Submittal of Two Unsatisfactory Blind Performance Sample Testing Events Report in Accordance with 10 CFR 26.719(c)(1)
ML13323A08311 November 2013Attachment (1) Responses to Questions 1 and 2 of Request for Additional Information, Attachment (2) Responses to Questions 3 and 4, Request for Additional Information and Attachment (3) 10 CFR 2.390 Affidavit of Westinghouse-CAW-13-3847
ML13323A08211 November 2013R.E Ginna, Response to Request for Additional Information Regarding License Amendment Request on Revising Section 3.6.5 of the Technical Specifications, Containment Air Temperature
ML13228A26514 August 2013Independent Spent Fuel Storage Installations Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act & License Amendment RequestSafe Shutdown
Cyber Security
Preemption Authority
Fuel cladding
Fire Protection Program
ML13210A03425 July 2013Supplemental Response to 10 CFR 50.54(f) Request for Recommendation 2.3, Seismic InformationSafe Shutdown
Unanalyzed Condition
Fukushima Dai-Ichi
Earthquake
ML13192A0315 July 2013Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML13190A01319 June 2013Response to Request for Additional Information Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analysis with Astrum
ML13175A35719 June 2013Thermal Conductivity Degradation Impact on R.E. Ginna Large Break Loss of Coolant Accident Analysis with Astrum - Response to Request for Additional Information
ML13141A47814 May 2013Annual Radiological Environmental Operating Report: January 1, 2012 - December 31, 2012Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML13141A47714 May 20132012 Annual Radioactive Effluent Release Report Including Revision 27 of the Offsite Dose Calculation ManualGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML13141A47614 May 2013Annual Radioactive Effluent Release and Radiological Environmental Operating ReportsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML13094A0751 April 2013CFR 50.46 Annual ECCS Report
ML13093A06529 March 2013Transition Report to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition - Transition Report, Redacted Version. Enclosure 2Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Mission time
Fire Barrier
Time to boil
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Large early release frequency
Hemyc
Exemption Request
Earthquake
Maintenance Rule Program
Fire Protection Program
Fire Watch
ML13093A06428 March 2013License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)Probabilistic Risk Assessment
Fire Protection Program
ML13074A0568 March 2013Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External EventsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Pressure Boundary Leakage
Fire Protection Program
ML13070A0516 March 2013R. E. Ginna - Report of Facility Changes, Test, and Experiments Conducted Without Prior Commission ApprovalLicense Renewal
Flow Induced Vibration
ML13051A01222 February 2013CFR Part 26, Subpart I - Managing Fatigue, for the Period of 2012
ML13053A29620 February 2013NRC Pre-Meeting Presentation 2-20-13Ultimate heat sink
Probabilistic Risk Assessment
NFPA 805
Hemyc
Maintenance Rule Program
Fire Protection Program
ML13051A01119 February 2013Annual Reporting Form for Drug and Alcohol Tests, for the Period of 2012
ML13051A00919 February 2013Single Positive Test Form, for Pre-Access, Collected on 01/16/2012
ML13051A01019 February 2013Single Positive Test Form, for Pre-Access, Collected on 01/16/2012
ML13051A01419 February 2013Single Positive Test Form, for Random, Collected on 07/02/2012
ML13051A01519 February 2013Single Positive Test Form, for Pre-Access, Collected on 06/28/2012
ML13051A01619 February 2013Single Positive Test Form, for Pre-Access, Collected on 09/17/2012
ML13051A01719 February 2013Single Positive Test Form, for Followup, Collected on 10/23/2012
ML13051A01819 February 2013Single Positive Test Form, for Pre-Access, Collected on 10/08/2012
ML13051A01919 February 2013Single Positive Test Form, for Pre-Access, Collected on 10/08/2012
ML13051A02019 February 2013Single Positive Test Form, for Cause, Collected on 10/17/2012
ML13051A02119 February 2013Single Positive Test Form, for Followup, Collected on 11/01/2012
ML13051A02319 February 2013Single Positive Test Form, for Pre-Access, Collected on 10/24/2012
ML13051A02219 February 2013Single Positive Test Form, for Pre-Access, Collected on 10/24/2012