Safeguards Information OENGP,,
a joint venture of Constellation nrg
-,eDF Energy-d March 20, 2014 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 and 72-67 Changes to the R. E. Ginna Nuclear Power Plant Security Plan, Training and Oualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Pursuant to the requirements of 10 CFR 50. 54 (p), attached is Revision 7 to the R. E. Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program. A summary of changes is provided in Attachment 1 and the revised Plan is provided in Attachment 2. The attached documents are classified as Safeguards Information.
This Security Plan change submittal is in regards to revising Table 1: Critical Task Matrix of the aforementioned R.E. Ginna Nuclear Power Plant Security Plan with revision 7 of NEI 03-12.
NEI 03-12 is the NRC endorsed industry template utilized for developing a licensee Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program. This template contains a mandatory minimum list of must perform critical tasks necessary for the implementation of the site's Security Training and Qualification Plan. Within NEI 03-12 revision 7 section 3.1 affords the licensee the opportunity to describe within their facility procedures any additional critical tasks deemed appropriate and necessary for individuals to be trained and qualified prior to assignment of responsibilities for critical tasks.
Pursuant to 50.54(p) requirements a review was conducted to ensure there will be no reduction in the training and qualification for members of the Security Force. The training and qualification currently committed to in revision 6 of the R.E. Ginna Nuclear Power Plant Security Plan, Table 1 that are not mandatory will be maintained, however will be listed in facility procedures and have been analyzed utilizing a systematic approach to training.
Safeguards Information
Safeguards Information Document Control Desk March 20, 2014 Page 2 After a review of R.E. Ginma Station's protective strategy and R.E Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 6, Section 3 states "Only the critical tasks necessary for implementation of the Ginna Station Security Plan and protective strategy are identified, described and categorized by duty position in the plan." In addition section 3.1 states that "Ginma Station describes, within facility procedures, any additional critical tasks deemed appropriate and necessary for individuals to be trained and qualified prior to assignment of responsibilities for critical task(s)."
There are no regulatory commitments identified in this correspondence.
Should you have any questions regarding the information in this submittal, please contact Mr.
Thomas Harding, Director Licensing at (585) 771-5219.
Very truly yours, Eugene F. Palmer Director, Security Safeguards Information
Safeguards Information Document Control Desk March 20, 2014 Page 3 Attachments: (1)
Summary of the Changes for Revision 7 of the "R. E. Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program."
(2)
"R. E. Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program," Revision 7.
(3) 10 CFR 50.54(p) Review of the proposed change to the "R. E. Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program" NOTE: ATTACHMENTS I AND 2 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF ATTACHMENTS I AND 2, THIS LETTER MAY BE DECONTROLLED.
cc:
W. M. Dean, NRC (with Attachments)
M. C. Thadani, NRC (without Attachments)
Resident Inspector, NRC (Ginna) (without Attachments)
Safeguards Information
Safeguards Information Document Control Desk March 20, 2014 Page 4 bcc: E. F. Palmer (w/o attachments)
M. Ives (w/o attaclmuents)
T. L. Harding (w/o attachments)
J. A. Jackson (w/o attachments)
J. P. Ortiz (w/o attaclunents)
G. Sen (w/o attachments)
REGULATORY COMMITMENTS IDENTIFIED IN THIS CORRESPONDENCE:
None Safeguards Information