Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML14107A187 | 17 April 2014 | Vallecitos Nuclear Center | GE Hitachi Nuclear Energy - Annual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu for Ntr |
ML14093A189 | 31 March 2014 | Vallecitos Nuclear Center | GE Hitachi Nuclear Energy, Submittal of Annual Report for Nuclear Test Reactor (Ntr), 2013 |
ML13162A568 | 7 June 2013 | Vallecitos Nuclear Center | Annual Statement of non-availability of Federal Government Funding for Conversion from HEU to Leu for Ntr |
ML13144A752 | 24 May 2013 | Vallecitos Nuclear Center Vallecitos | GEH Vallecitos Nuclear Center Emergency Planning (EP) Requirements |
ML12121A556 | 26 April 2012 | Vallecitos Nuclear Center | Annual Statement of non-availability of Federal Government Funding for Conversion from HEU to Leu |
ML12093A345 | 30 March 2012 | Vallecitos Nuclear Center | GE Hitachi Nuclear Energy, Submittal of 2011 Annual Report for the Test Reactor (Ntr) at Vallecitos Nuclear Center in Sunol, California |
ML11133A290 | 10 May 2011 | Vallecitos Nuclear Center | Annual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu for Ntr |
ML110940371 | 31 March 2011 | Vallecitos Nuclear Center | Annual Report for Ntr, 2010, Annual Report, No. 51 |
ML101190100 | 27 April 2010 | Vallecitos Nuclear Center | Annual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu |
ML100920554 | 30 March 2010 | Vallecitos Nuclear Center | 2009 Annual Report No. 50 for GE-Hitachi Nuclear Test Reactor |
ML090930302 | 31 March 2009 | Vallecitos Nuclear Center | GE-Hitachi's Submittal of Annual Report No. 44 for Vbwr, 2008 |
ML090930301 | 31 March 2009 | Vallecitos | Annual Report No. 50 for Getr, 2008 |
ML090930300 | 31 March 2009 | Vallecitos | Annual Report No. 41 for EVESR, 2008 |
ML090930288 | 30 March 2009 | Vallecitos Nuclear Center | Annual Report No. 49 for Ntr, 2008 |
ML082840704 | 9 October 2008 | Vallecitos | GE Hitachi Nuclear Energy - Modification to 10 CFR 50.91(a) for EVESR Technical Specifications, Amendment Seven |
ML082960907 | 26 September 2008 | Vallecitos | GE Hitachi - Notification of Potential Technical Specification Violation for EVESR |
ML20096E941 | 8 January 1996 | Summer | RB Tendon Hoop & Dome Loss Calculations for 5th Period Surveillance |
ML20096E946 | 8 January 1996 | Summer | RB Vertical Tendon Force Loss & 5th Period Surveillance Acceptance Criteria Calculation |
ML20095F268 | 11 October 1995 | University of Virginia | Forwards Univ of VA Nuclear Reactor Facility 1995 Annual Emergency Preparedness Drill Scenario.Requests That Encl of Ltr Be Held from NRC Public Document Room Until After Drill Event |
ML20081L975 | 27 March 1995 | University of Virginia | Forwards Rev 18 to EPIPs & Rev 3 to Emergency Plan |
ML20077C384 | 18 October 1994 | University of Virginia | Forwards Univ of VA Nuclear Reactor Facility 1994 Emergency Preparedness Drill Scenario for 941122 |
ML20072E391 | 20 June 1994 | Crystal River | Tendon Surveillance Program Engineering Evaluation Rept for Fifth Tendon Surveillance Insp Period |
ML20063F910 | 14 January 1994 | University of Virginia | Forwards Rev 16 to Epips.Requests Ack Receipt & Filing of Rev by Returning Completed Cover Sheet.W/O Encl |
ML20044D700 | 12 May 1993 | University of Virginia | Forwards Rev 15 to Epips,Including EPIP-6,EPIP-7,EPIP-9, EPIP-10 & EPIP-12 & Rev 15 to Pages A-3,A4-1 & A4-2 to Emergency Plan |
ML20045C530 | 7 May 1993 | University of Virginia | Responds to NRC 930205 Ltr Re Violations Noted in Insp Rept 50-062/92-03.C/As:initial Training,Procedures & Inventories Have Been Completed & Refinements & Improvements Will Continue in All Areas as Well as in EP Program |
ML20116P009 | 18 November 1992 | University of Virginia | Informs That B Hosticka,Not Cpr/First Aid Qualified & Is Not to Be Called as Primary Responder in Event of Medical Emergency & That Vs Thomas Not to Be Called as Primary Responder for Any Emergency.Note Should Be Made on EPIP 6 |
ML20127D850 | 22 October 1992 | University of Virginia | Forwards Description of Scope & Objectives for 1992 Annual Emergency Preparedness Drill Scenario for Drill to Be Conducted on 921117 |
ML20127D842 | 20 October 1992 | University of Virginia | Forwards 1992 Annual Emergency Preparedness Drill Scenario for 921117 |
ML20091E269 | 23 May 1984 | 05000124 | Application to Amend License R-62,reflecting Major Equipment & Sys Upgrade.Summary of Facility Changes,Eia,Financial Statement & List of Campus Licenses Encl |
ML20248B538 | 5 April 1984 | Ginna | Design Criteria for Masonry Wall Evaluation. W/Two Oversize Drawings |
ML20024D486 | 28 July 1983 | Cook | Updated LER 83-053/01X-1:from 830612-16,action Not Performed While Train B of Boron Injection Tank Inlet Piping Heat Trace Circuitry Taken Out of Svc.Caused by Loose Splice. Splice Repaired & Procedure changed.W/830728 Ltr |
ML20023B819 | 29 April 1983 | Cook | LER 83-030/03L-0:on 830402,while on Tour,Security Guard Discovered Diesel Room AB Cardox Sys Isolated W/No One in Room.Caused by Personnel Error.Operator Instructed on Proper Procedures for Exiting Carbon Dioxide Protected Areas |
ML20028F419 | 24 January 1983 | Cook | LER 83-002/03L-0:on 821223,while Performing Ice Condenser Tour,Intermediate Deck Door Discovered Frozen Shut.Caused by Plugged Drain in Air Handling Unit Resulting in Ice Buildup & Overflow.Air Handling Unit Repaired |
ML20050D481 | 2 April 1982 | Cook | LER 82-015/03L-0:on 820305,during Power Increase,Turbine Would Not Accept Addl Load at 46%.Turbine Runback Occurred. Caused by Problems in Initial Pressure Limiter Circuits. Circuitry Removed from Control Sys B |
ML20050B012 | 24 March 1982 | Cook | LER 82-013/03L-0:on 820302,control Switch for Containment Pressure Equalization Fan in Stop & Backdraft Damper for Opposite Fan Was Open.Cause Could Not Be Determined.Startup Procedures Revised |
ML20042B208 | 19 March 1982 | Cook | LER 82-016/03L-0:on 810719,during Normal Operation Pinhole Leak Discovered on Suction Strainer for West Containment Spray Pump.Caused by Crack Which Was Removed by Grinding & Welding |
ML20041F554 | 10 March 1982 | Cook | LER 82-012/03L-0:on 820224,boron Injection Tank Inlet Valve Breaker Found in Off Position.Probably Caused by Accidental Bump by Personnel Using Area as Shortcut.Area Will Be Blocked Off to Prevent Passage |
ML20040C346 | 19 January 1982 | Cook | Updated LER 81-001/03X-1:on 810112,routine Sampling Bit & North Bast Revealed Boron Concentration in Both Tanks Below Tech Spec Limit.Caused by Leaking of Bit Inlet Valves, IMP-255 & IMO-256,causing Dilution of Bit |
ML20039D285 | 21 December 1981 | Cook | LER 81-067/03L-0:on 811120,81-psi Control Air Header Was Out Inadvertently During Installation of NUREG-0737 Design Change,Causing Normal Letdown Isolation Valve QCR-300 to Close.Shift Supervisor Reinstructed |