Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML14107A18717 April 2014Vallecitos Nuclear CenterGE Hitachi Nuclear Energy - Annual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu for Ntr
ML14093A18931 March 2014Vallecitos Nuclear CenterGE Hitachi Nuclear Energy, Submittal of Annual Report for Nuclear Test Reactor (Ntr), 2013
ML13162A5687 June 2013Vallecitos Nuclear CenterAnnual Statement of non-availability of Federal Government Funding for Conversion from HEU to Leu for Ntr
ML13144A75224 May 2013Vallecitos Nuclear Center
Vallecitos
GEH Vallecitos Nuclear Center Emergency Planning (EP) Requirements
ML12121A55626 April 2012Vallecitos Nuclear CenterAnnual Statement of non-availability of Federal Government Funding for Conversion from HEU to Leu
ML12093A34530 March 2012Vallecitos Nuclear CenterGE Hitachi Nuclear Energy, Submittal of 2011 Annual Report for the Test Reactor (Ntr) at Vallecitos Nuclear Center in Sunol, California
ML11133A29010 May 2011Vallecitos Nuclear CenterAnnual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu for Ntr
ML11094037131 March 2011Vallecitos Nuclear CenterAnnual Report for Ntr, 2010, Annual Report, No. 51
ML10119010027 April 2010Vallecitos Nuclear CenterAnnual Statement of Non-Availability of Federal Government Funding for Conversion from HEU to Leu
ML10092055430 March 2010Vallecitos Nuclear Center2009 Annual Report No. 50 for GE-Hitachi Nuclear Test Reactor
ML09093030231 March 2009Vallecitos Nuclear CenterGE-Hitachi's Submittal of Annual Report No. 44 for Vbwr, 2008
ML09093030131 March 2009VallecitosAnnual Report No. 50 for Getr, 2008
ML09093030031 March 2009VallecitosAnnual Report No. 41 for EVESR, 2008
ML09093028830 March 2009Vallecitos Nuclear CenterAnnual Report No. 49 for Ntr, 2008
ML0828407049 October 2008VallecitosGE Hitachi Nuclear Energy - Modification to 10 CFR 50.91(a) for EVESR Technical Specifications, Amendment Seven
ML08296090726 September 2008VallecitosGE Hitachi - Notification of Potential Technical Specification Violation for EVESR
ML20096E9418 January 1996SummerRB Tendon Hoop & Dome Loss Calculations for 5th Period Surveillance
ML20096E9468 January 1996SummerRB Vertical Tendon Force Loss & 5th Period Surveillance Acceptance Criteria Calculation
ML20095F26811 October 1995University of VirginiaForwards Univ of VA Nuclear Reactor Facility 1995 Annual Emergency Preparedness Drill Scenario.Requests That Encl of Ltr Be Held from NRC Public Document Room Until After Drill Event
ML20081L97527 March 1995University of VirginiaForwards Rev 18 to EPIPs & Rev 3 to Emergency Plan
ML20077C38418 October 1994University of VirginiaForwards Univ of VA Nuclear Reactor Facility 1994 Emergency Preparedness Drill Scenario for 941122
ML20072E39120 June 1994Crystal RiverTendon Surveillance Program Engineering Evaluation Rept for Fifth Tendon Surveillance Insp Period
ML20063F91014 January 1994University of VirginiaForwards Rev 16 to Epips.Requests Ack Receipt & Filing of Rev by Returning Completed Cover Sheet.W/O Encl
ML20044D70012 May 1993University of VirginiaForwards Rev 15 to Epips,Including EPIP-6,EPIP-7,EPIP-9, EPIP-10 & EPIP-12 & Rev 15 to Pages A-3,A4-1 & A4-2 to Emergency Plan
ML20045C5307 May 1993University of VirginiaResponds to NRC 930205 Ltr Re Violations Noted in Insp Rept 50-062/92-03.C/As:initial Training,Procedures & Inventories Have Been Completed & Refinements & Improvements Will Continue in All Areas as Well as in EP Program
ML20116P00918 November 1992University of VirginiaInforms That B Hosticka,Not Cpr/First Aid Qualified & Is Not to Be Called as Primary Responder in Event of Medical Emergency & That Vs Thomas Not to Be Called as Primary Responder for Any Emergency.Note Should Be Made on EPIP 6
ML20127D85022 October 1992University of VirginiaForwards Description of Scope & Objectives for 1992 Annual Emergency Preparedness Drill Scenario for Drill to Be Conducted on 921117
ML20127D84220 October 1992University of VirginiaForwards 1992 Annual Emergency Preparedness Drill Scenario for 921117
ML20091E26923 May 198405000124Application to Amend License R-62,reflecting Major Equipment & Sys Upgrade.Summary of Facility Changes,Eia,Financial Statement & List of Campus Licenses Encl
ML20248B5385 April 1984GinnaDesign Criteria for Masonry Wall Evaluation. W/Two Oversize Drawings
ML20024D48628 July 1983CookUpdated LER 83-053/01X-1:from 830612-16,action Not Performed While Train B of Boron Injection Tank Inlet Piping Heat Trace Circuitry Taken Out of Svc.Caused by Loose Splice. Splice Repaired & Procedure changed.W/830728 Ltr
ML20023B81929 April 1983CookLER 83-030/03L-0:on 830402,while on Tour,Security Guard Discovered Diesel Room AB Cardox Sys Isolated W/No One in Room.Caused by Personnel Error.Operator Instructed on Proper Procedures for Exiting Carbon Dioxide Protected Areas
ML20028F41924 January 1983CookLER 83-002/03L-0:on 821223,while Performing Ice Condenser Tour,Intermediate Deck Door Discovered Frozen Shut.Caused by Plugged Drain in Air Handling Unit Resulting in Ice Buildup & Overflow.Air Handling Unit Repaired
ML20050D4812 April 1982CookLER 82-015/03L-0:on 820305,during Power Increase,Turbine Would Not Accept Addl Load at 46%.Turbine Runback Occurred. Caused by Problems in Initial Pressure Limiter Circuits. Circuitry Removed from Control Sys B
ML20050B01224 March 1982CookLER 82-013/03L-0:on 820302,control Switch for Containment Pressure Equalization Fan in Stop & Backdraft Damper for Opposite Fan Was Open.Cause Could Not Be Determined.Startup Procedures Revised
ML20042B20819 March 1982CookLER 82-016/03L-0:on 810719,during Normal Operation Pinhole Leak Discovered on Suction Strainer for West Containment Spray Pump.Caused by Crack Which Was Removed by Grinding & Welding
ML20041F55410 March 1982CookLER 82-012/03L-0:on 820224,boron Injection Tank Inlet Valve Breaker Found in Off Position.Probably Caused by Accidental Bump by Personnel Using Area as Shortcut.Area Will Be Blocked Off to Prevent Passage
ML20040C34619 January 1982CookUpdated LER 81-001/03X-1:on 810112,routine Sampling Bit & North Bast Revealed Boron Concentration in Both Tanks Below Tech Spec Limit.Caused by Leaking of Bit Inlet Valves, IMP-255 & IMO-256,causing Dilution of Bit
ML20039D28521 December 1981CookLER 81-067/03L-0:on 811120,81-psi Control Air Header Was Out Inadvertently During Installation of NUREG-0737 Design Change,Causing Normal Letdown Isolation Valve QCR-300 to Close.Shift Supervisor Reinstructed