Forwards 1992 Annual Emergency Preparedness Drill Scenario for 921117
ML20127D842
Person / Time
Site: University of Virginia
Issue date: 10/20/1992
From: Don Krause
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
To: Sartor W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9301190062
Download: ML20127D842 (4)


Text

.

SCHOOL OF ENGINEERING @

& APPUED SCIENCE NUCLIG1R Hl:1CTOR FACll.1(Y October 20,1992 Ixpartment or Meenanicai, Aerospace & Nuclear I:nginevnng Mr. William Sartor unhersity or virpnaa Charlottewinc. VA :No-2442 Radiological Protection and sumes4 m rAxmaw-sm Emergency Preparedness Branch Division of Radiation Safety and Safeguards Nuclear Regulatory Commission Region 11 101 N1arietta Street N. W.

Atlanta, Georgia 30323 Re:

Docket Nos. 50-62, 50-396, License Nos. R-66, R-123, for the University of Virginia Nuclear Reactor Facility

Dear Nir. Sartor:

As requeste.1 by your office, I am sending you a copy of the 1992 Annual Emergency Preparedness Drill Scenario for the University of Virginia Nuclear Reactor Facility.

We ask that the enclosure of this letter be held from tae NRC Public Document Room until after the drill event.

Should you have any comments or questions concerning this drill, please contact me.

Sincerely, D_L( k

%,q,

Donald R. Krause, SRO U. Va. Nuclear Reactor Facility

Enclosure:

Drill Scenario ec w/ enclosure:

htr. A. Adams, NRC Project hianager for U. Va.

htr. C. Bassett, NRC Compliance Inspector for 'U. Va.

hir. W. Cline, Chief, NRC Radiological Protection and Emergency Preparedness Branch hlr. G. Urquhart, Chief. Radiological Planning, Commonwealth of Virginia Dr. R. Niulder, Director U. Va. Nuclear Reactor Facility e

9301190062 92.1020

\\

PDR ADOCK 05000062

\\\\

F PDR IE S

SCHOOI. 0F ENGINEERING IB i

& APPUED SCIENCE NUCLEAR REACTOR FACIL)lY

\\

Department of Mechenical.

j Aerospace & Nuclear Engineering University of Virginia Charlottewille. VA 22903-2442 N4982 5440 i A>: 804%2 5473 Un.iversity of Virgima Nuclear Reactor Facility Emergency Preparedness Drill Scenario for 17 November 1992 SCliNAltlO IIXPliCrliD AC110NS EOC 1.OCA1.

T = 0 min None Normal Operations A Tuesday Morning Normal reactor operations (reactor at 2 Mw)

Experiments /research taking place in all occupied lab rooms 1.

Grad student concentrating (boiling down solution) 10 microcuries of Cs.

.137 in TGW fume hood for l'hillip Morris llesearch T + 05 min 1.cosened hose clamp on inlet to the secondary chemistry valve controller develops leak - spray hitting load center UVa Emergency Drill - Page 1

s

.c

-t SCIINil!(10 IIOC LOCAL.

T + 10 min Itcactor trips on momentary Muffled explosion sound loss of power -

keys in personnel to

- 11reaker " shorts out (major Arc investigate.

explosion)

Personnel investigate explosion sound Upon finding injured man 1 orce of explosion rauses front cover upon hearingof need for help of breaker to rupture

1. call for help over PA re-announce.

1.

Pieces of breaker cover are 'orced

2. begin treatingvictim through side of fume hood determine condition -

determine condition and

-whether a.

Iloiling apparatus is disrupted call 911 contaminated pilling on hands of student.

2nd degree burns w/

enter emergency plan when inform EOC of damage to contamination determination of fume hood and load center contamination is made:

b.

Glass broken by projectiles (liPIP's 6,7,8, 1,2,13,12,10,9) inform !!OC of.

lacerate student's face and chest w.' contaminated glass seek cause of reactor trip and contamination control explosion sound measures 2.

Pieces of breaker cover are thrown across boiler room putting a hole in call physical plant to de-progress of first aid one of the boiler fuellines energize load center measures a.

leaking fuel oil slowly turn off secondary pump stabilize victim spreading on boiler room decontaminate as possible floor investigate fuel oil leak inform EOC of arcing in b.

Strong fuel oil smell in boiler load center, fuel oil on floor room area after 5 minutes (hemy oil smell), and water spraying on load center Water continues to spray until Sec(mdary Pump is turned off or hose find and secure fuel oilleak clamp is tightened Arcing of breakers continue until power is de energized to load center T + 30 min coordinate with rescue squad aid rescue squad to move to transport victim victim to vehicle -

If electric power has not been shut off to load center, arcing of breakers Decontaminate area ignites fuel oil on floor 4

i -

UVa Emergency Drill.- Page 2 l

_ g y

.3 ~; -

SCliNiiltlO liOC '

1,0CA1.

T + 30 min Call fire dept.

Inform EOC of ignition in boiler room Fire in loiler room, lleavy black evacuate facility smoke attempt to_ put out firewH'1 cxtinguisher All paper products catch fire (10 minutes only) immediately 1.

Caustic soda released on floor near load center 2.

112S04 tottles fall out of boxes T + 35 min determine fire spread,

_ establish decon area for fire-radiologicalcontrols necessary fighters Plastic containers of caustics are and what hazardous chemical aking after 5 minutes are present 1.

112S04 bottles break from heat, acid '

released on floor behind load center i

(T + 40) coordinate with fire dept aid fireman if necessary scene leader to fight fire 4

Walls end wood framing material catch fire -

1.

visibility 0 2.

Hiocide caustics pooled on Ikmr near air compressor 3.

Plastic materials are melted T + 60 Unless contained, fire spread to TGW lab and through Mezzanine wall lleentry/ Paper work Decnntamination/ assessment-I find Drill When Fire OUT or contamination

/ cleanup _

is cleaned up after victim is transported to hospital 9

UVa Eniergency Drill -_ Page 3

,y

.4 y

4 y

n e

c-m

-