Semantic search
Jump to navigation
Jump to search
Start date | Site | Title | Description | |
---|---|---|---|---|
ML23310A149 | 8 December 2023 | Fermi | Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | |
ML23297A051 | 30 October 2023 | Fermi | Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) | |
ML23243A885 | 18 September 2023 | Fermi | Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) | |
ML23248A224 | 7 September 2023 | Fermi | Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance | |
ML23223A224 | 29 August 2023 | Fermi | Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) | |
ML23241B016 | 24 August 2023 | Fermi | Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) | |
ML23199A247 | 14 July 2023 | Fermi | Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation | |
ML23122A233 | 26 June 2023 | Fermi | Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | |
ML23146A062 | 25 May 2023 | Fermi | Acceptance of Requested Licensing Action Regarding Amendment to Correct Non-Conservative TS 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | |
ML23130A103 | 17 May 2023 | Fermi | Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency | |
ML22307A125 | 9 November 2022 | Fermi | Summary of October 19, 2022, Teleconference Meeting with DTE Electric Company Regarding Proposed License Amendment Pertaining to the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 | |
ML22216A006 | 31 August 2022 | Fermi | ECCS Strainer LAR Pre-Submittal Presentation Material | |
ML22200A096 | 22 July 2022 | Dresden | Request for Withholding Information from Public Disclosure | |
ML22188A089 | 21 July 2022 | Fermi | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | |
ML21335A280 | 7 April 2022 | Fermi | Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes | |
ML21340A245 | 9 December 2021 | Fermi | Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0053 (COVID-19)) | |
ML21253A010 | 15 October 2021 | Fermi | Revised Relief Request RR-A39 for the Fourth 10-Year Inservice Inspection Interval | |
ML21214A149 | 2 August 2021 | Fermi | License Amendment Request: Request for Additional Information | |
ML21159A054 | 17 June 2021 | Fermi | Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2021-LLE-0029 (COVID-19) | |
ML21029A254 | 24 May 2021 | Fermi | Issuance of Amendment No. 220 - Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Spent Fuel Pool Storage Racks (Non-Proprietary) | |
ML21120A161 | 30 April 2021 | Fermi | Transmittal of Draft Safety Evaluation for Proposed Amendment Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks (Non-Proprietary) | |
ML21098A045 | 26 April 2021 | Fermi | Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt TSTF-529 | |
ML21109A374 | 22 April 2021 | Fermi | Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0025 (COVID-19)) | |
ML21036A082 | 12 March 2021 | Fermi | Relief Request RR-A42 for Inservice Inspection Impracticality During the Third 10-Year Inservice Inspection Interval | |
ML21005A421 | 13 January 2021 | Fermi | Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0002 (COVID-19)) | |
ML20294A035 | 22 December 2020 | Fermi | Issuance of Amendment No. 217 - Revision to Technical Specifications for Secondary Containment Surveillance Requirements | |
ML20332A179 | 8 December 2020 | Fermi | Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0188 (COVID-19)) | |
ML20317A272 | 18 November 2020 | Fermi | Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0187 (COVID-19)) | |
ML20282A230 | 13 October 2020 | Fermi | Correction to Amendment No. 216 - Revision to Technical Specifications in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 | |
ML20233A838 | 5 October 2020 | Fermi | Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 | |
ML20226A116 | 11 September 2020 | Fermi | Temporary Exemption from the Annual Force-on-Force Training Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0128) (COVID-19) | |
ML20237F441 | 31 August 2020 | Fermi | Audit Summary in Support of the Review of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | |
ML20192A180 | 14 July 2020 | Fermi | Extension of Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0109 (COVID-19)) | |
ML20133K055 | 14 May 2020 | Fermi | Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0056 (COVID-19)) | |
ML20094G814 | 8 April 2020 | Fermi | Audit Plan in Support of the Review of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | |
ML20015A433 | 15 January 2020 | Quad Cities | Revision 24 to Fire Protection Report, Volume 1 - Redacted | |
ML20015A436 | 15 January 2020 | Quad Cities | Revision 24 to Fire Protection Report, Volume 2 - Redacted | |
ML20015A413 | 15 January 2020 | Quad Cities | UFSAR Revision 15 Chapter 13 Conduct of Operations - Redacted | |
ML20015A429 | 15 January 2020 | Quad Cities | UFSAR Revision 15 Chapter 6 Engineered Safety Features - Redacted | |
ML20015A426 | 15 January 2020 | Quad Cities | UFSAR Revision 15 Chapter 3 Design of Structures, Components, Equipment and Systems - Redacted | |
ML20015A423 | 15 January 2020 | Quad Cities | UFSAR Revision 15 Chapter 2 Site Characteristics - Redacted | |
ML19119A208 | 29 April 2019 | Vogtle | Uncompleted ITAAC Notification Checklist (UINC) 2.3.09.04b for ITAAC (Index No. 428) for Vogtle Unit 4 Combined License (VOG4) | |
ML19119A207 | 29 April 2019 | Vogtle | Uncompleted ITAAC Notification Checklist (UINC) 2.3.09.04b for ITAAC (Index No. 428) for Vogtle Unit 3 Combined License (VOG3) | |
ML19113A146 | 23 April 2019 | Vogtle | Uncompleted ITAAC Notification Checklist (UINC) 2.3.09.03.ii for ITAAC (Index No. 424) for Vogtle Unit 3 Combined License (VOG3) | |
ML19113A149 | 23 April 2019 | Vogtle | Uncompleted ITAAC Notification Checklist (UINC) 2.3.09.03.ii for ITAAC (Index No. 424) for Vogtle Unit 4 Combined License (VOG4) | |
ML19107A390 | 17 April 2019 | Vogtle | Uncompleted ITAAC Notification Checklist (UINC) 2.2.02.07f.i for ITAAC (Index No. 145) for Vogtle Unit 3 Combined License (VOG3) | |
ML19107A389 | 17 April 2019 | Vogtle | Uncompleted ITAAC Notification Checklist (UINC) 2.2.02.07f.i for ITAAC (Index No. 145) for Vogtle Unit 4 Combined License (VOG4) | |
ML19106A139 | 16 April 2019 | Vogtle | ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.02.08a.ii (Index No. 302) for Vogtle Unit 3 Combined License (VOG3) | |
ML19106A140 | 16 April 2019 | Vogtle | ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.02.08a.ii (Index No. 302) for Vogtle Unit 4 Combined License (VOG4) | |
ML19094B327 | 4 April 2019 | Vogtle | ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.3.05.03b.i (Index No. 346) for Vogtle Unit 4 Combined License (VOG4) |