ML23291A42424 October 20231 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for SafetySafe Shutdown
Half scram
Anticipated operational occurrence
Earthquake
ML23292A21212 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 222.1 Through 222.2
PLA-8081, 1 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.2112 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.21Safe Shutdown
Turbine Missile
Liquid penetrant
Dissimilar Metal Weld
ML23292A22512 October 20231 to Updated Final Safety Analysis Report, Chapter 17, Section 17.1, This Section N/A to FSAR
ML23292A22412 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 032.1 Through 032.103Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Post Accident Monitoring
Scram Discharge Volume
Earthquake
Maintenance Rule Program
ML23292A22312 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 331.1 Through 331.19High Radiation Area
Anticipated operational occurrence
Coatings
ML23292A22212 October 20231 to Updated Final Safety Analysis Report, Questions 321.1 Through 321.7Boric Acid
Anticipated operational occurrence
Process Control Program
ML23292A22112 October 20231 to Updated Final Safety Analysis Report, Questions and Response 260.1Safe Shutdown
Boric Acid
Post Accident Monitoring
ML23292A22012 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 441.1 Through 441.15
ML23292A21812 October 20231 to Updated Final Safety Analysis Report, Chapter 1, Questions 010.1 Through 010.26Safe Shutdown
Ultimate heat sink
Internal Flooding
Power Uprate
ML23292A21512 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 423.1 Through 423.58Shutdown Margin
Stroke time
Hydrostatic
Feedwater Controller Failure
Battery sizing
ML23292A21412 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 005.1 Through 005.6
ML23292A19812 October 20231 to Updated Final Safety Analysis Report, Chapter 17, Section 17.2, Quality Assurance During the Operations PhaseFire Barrier
Coatings
Nondestructive Examination
Emergency Lighting
Condition Adverse to Quality
Fire Protection Program
Early Warning Fire Detection
ML23292A21012 October 20231 to Updated Final Safety Analysis Report, Questions 313.1 Through 313.9
ML23291A11312 October 2023Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report
ML23292A20812 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 422.1 Through 422.4
ML23292A20512 October 20231 to Updated Final Safety Analysis Report, Questions 021.01 Through 021.88Hydrostatic
Excess Flow Check Valve
ML23292A20412 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 130.1 Through 130.28Safe Shutdown Earthquake
Earthquake
ML23292A20312 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 211.1 Through 211.296Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Operator Manual Action
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Excess Flow Check Valve
Earthquake
Power-Operated Valves
Power change
Coast down
Unidentified leakage
Power Uprate
Failure to Scram
ML23292A20112 October 20231 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Proposed Final Technical Specifications
ML23292A20012 October 20231 to Updated Final Safety Analysis Report, Chapter 18, Responses to TMI Related Requirements
ML23292A19912 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 371.1 Through 371.30Ultimate heat sink
ML23292A19512 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 281.1 Through 281.29Grab sample
ML23292A21312 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 362.1 Through 362.25Hydrostatic
ML23292A20912 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 421.1 Through 421.42Emergency Lighting
Fire Protection Program
ML23292A21612 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99Safe Shutdown
Fire Barrier
Tornado Missile
Temporary Modification
Emergency Lighting
Design basis earthquake
Power change
Siren
ML23292A19412 October 20231 to Updated Final Safety Analysis Report, Questions and Response 361.1 Through 361.5-1Earthquake
ML23292A19612 October 20231 to Updated Final Safety Analysis Report, Questions 123.1 Through 123.9Excess Flow Check Valve
Earthquake
ML23292A22812 October 20231 to Updated Final Safety Analysis Report, Question and Response 440.1Fire Protection Program
ML23292A21112 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 400.1
ML23292A20712 October 20231 to Updated Final Safety Analysis Report, Questions 230.1 Through 230.8
ML23292A20212 October 20231 to Updated Final Safety Analysis Report, Questions and Response 112.1 Through 112.10Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML23292A21912 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 231.1 Through 231.5
ML23292A22712 October 20231 to Updated Final Safety Analysis Report, Figures Referenced in the FSAR Are Withheld Under 10 CFR 2.390
ML23292A22612 October 20231 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Preliminary Technical Specifications
ML23292A20612 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 372.1 Through 372.28
ML23292A21712 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 410.1 Through 410.13