MONTHYEARML23291A4242023-10-24024 October 2023 1 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety ML23292A2122023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 222.1 Through 222.2 PLA-8081, 1 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.212023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.21 ML23292A2252023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 17, Section 17.1, This Section N/A to FSAR ML23292A2242023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 032.1 Through 032.103 ML23292A2232023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 331.1 Through 331.19 ML23292A2222023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 321.1 Through 321.7 ML23292A2212023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Response 260.1 ML23292A2202023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 441.1 Through 441.15 ML23292A2182023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 1, Questions 010.1 Through 010.26 ML23292A2152023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 423.1 Through 423.58 ML23292A2142023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 005.1 Through 005.6 ML23292A1982023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 17, Section 17.2, Quality Assurance During the Operations Phase ML23292A2102023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 313.1 Through 313.9 ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23292A2082023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 422.1 Through 422.4 ML23292A2052023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 021.01 Through 021.88 ML23292A2042023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 130.1 Through 130.28 ML23292A2032023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 211.1 Through 211.296 ML23292A2012023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Proposed Final Technical Specifications ML23292A2002023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 18, Responses to TMI Related Requirements ML23292A1992023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 371.1 Through 371.30 ML23292A1952023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 281.1 Through 281.29 ML23292A2132023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 362.1 Through 362.25 ML23292A2092023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 421.1 Through 421.42 ML23292A2162023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99 ML23292A1942023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Response 361.1 Through 361.5-1 ML23292A1962023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 123.1 Through 123.9 ML23292A2282023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Question and Response 440.1 ML23292A2112023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 400.1 ML23292A2072023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions 230.1 Through 230.8 ML23292A2022023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Response 112.1 Through 112.10 ML23292A2192023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 231.1 Through 231.5 ML23292A2272023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Figures Referenced in the FSAR Are Withheld Under 10 CFR 2.390 ML23292A2262023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Preliminary Technical Specifications ML23292A2062023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 372.1 Through 372.28 ML23292A2172023-10-12012 October 2023 1 to Updated Final Safety Analysis Report, Questions and Responses 410.1 Through 410.13 2023-10-24
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
SSES-FSAR QUESTION 222.1 Describe in detail how the feedwater line and recirculation line short-term mass and energy release rates, used in the annulus pressurization and loading calculations, were determined.
Provide, separately, as a function of time, the mass flux (lbm/sec/ft 2 ) and areas used for each side of the break (the reactor vessel side and the inventory or long pipe side). List all assumptions and conservatisms used. If a hand calculation was used for this analysis, document the work done.
RESPONSE
Refer to Appendix 6A for response.
Rev. 46, 06/93 222.1-1
SSES-FSAR QUESTION 222.2 One second after a postulated steam line break, a quality less than 1.0 was assumed to exit the rupture.
This may provide the limiting containment pressurization, but may not provide the limiting containment temperature. Assuming 100\
efficiency for the steam separators and dryers, provide the mass and energy release rates which would occur with a 1. 0 break quality. Show that this would not provide the limiting condition for the drywell and suppression pool temperature.
RESPONSE
FSAR Subsection 6. 2 .1.1. 3. 3. 2 has been revised to provide this information.
Rev. 46, 06/93 222.2-1