ML0934410666 September 1990Forwards Rev 20 to Vol I Emergency Plan Index,Rev 35 to Vol II, Emergency Response Activation, Rev 60 to Vol III EPIP Index & Rev 12 to IP-1011, Offsite Monitoring/Site Perimeter Surveys.
B13622, Forwards Crdr Human Engineering Discrepancy Info for Plant30 August 1990Forwards Crdr Human Engineering Discrepancy Info for Plant
B13617, Requests NRC Revise Confirmatory Order for Plant to Specify New Completion Date of Cycle 16 Refueling Outage for Item II.E.1.2.Util Intends to Implement Design Change During Next Refueling Outage to Resolve Listed Issues22 August 1990Requests NRC Revise Confirmatory Order for Plant to Specify New Completion Date of Cycle 16 Refueling Outage for Item II.E.1.2.Util Intends to Implement Design Change During Next Refueling Outage to Resolve Listed Issues
B13615, Requests That 900705 Request for Amend to License DPR-61 Be Approved on Emergency Basis & That Temporary Waiver of Compliance from Tech Spec 4.4.6.2.1.g Be Given Until NRC Acts on Emergency Amend20 August 1990Requests That 900705 Request for Amend to License DPR-61 Be Approved on Emergency Basis & That Temporary Waiver of Compliance from Tech Spec 4.4.6.2.1.g Be Given Until NRC Acts on Emergency Amend
B13611, Forwards, Semiannual Radioactive Effluents Release Rept for Jan-June 199016 August 1990Forwards, Semiannual Radioactive Effluents Release Rept for Jan-June 1990
B13595, Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-139414 August 1990Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-1394
B13602, Submits Addendum to Plant Control Room Design Review Summary Rept,Per .Lists 10CFR50 App R-related Mods Outside Control Room That Could Not Be Reviewed Until After Final Implementation of Changes14 August 1990Submits Addendum to Plant Control Room Design Review Summary Rept,Per .Lists 10CFR50 App R-related Mods Outside Control Room That Could Not Be Reviewed Until After Final Implementation of Changes
B13580, Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement10 August 1990Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement
ML1003314857 August 1990Forwards Proprietary WCAP-12687 & Nonproprietary WCAP-12688, Indian Point Unit 2 Tube Fatigue Reevaluation, Rev 2,per NRC Request.Proprietary Rept Withheld (Ref 10CFR2.790)
B13603, Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps2 August 1990Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps
ML1003314901 August 1990Forwards Proprietary WCAP-12670 & Nonproprietary WCAP-12671, Indian Point Unit 2 - Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp. Proprietary Rept Withheld (Ref 10CFR2.790(b)(4))
B13601, Requests Temporary Waiver of Compliance from Tech Spec 3.7.1.2,allowing Plant to Remain in Mode 3 for Addl 14 Days Beyond Current Action Statement Limits W/One or of Two Auxiliary Feedwater Pumps Inoperable31 July 1990Requests Temporary Waiver of Compliance from Tech Spec 3.7.1.2,allowing Plant to Remain in Mode 3 for Addl 14 Days Beyond Current Action Statement Limits W/One or of Two Auxiliary Feedwater Pumps Inoperable
ML20058L47431 July 1990Forwards 900713 Projection for Aug 1990 - Jul 1991 Guaranteeing Payment of Deferred Premiums
ML20056A71827 July 1990Forwards Corrected Page 3.10-9 Inadvertently Omitted from 900621 Application for Amend to License DPR-64 Re Removal of cycle-specific Parameter Limits Per Generic Ltr 88-16
B13585, Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys26 July 1990Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys
B13571, Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation19 July 1990Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation
B13569, Forwards, Haddam Neck Plant Decommissioning Financial Assurance Certification Rept18 July 1990Forwards, Haddam Neck Plant Decommissioning Financial Assurance Certification Rept
ML20055G99717 July 1990Forwards Decommissioning Financial Assurance Certification Rept for Facilities,Per 10CFR50.33(K)(2)
ML09344105916 July 1990Forwards Rev 34 to Vol II, Emergency Response Activation, & Revised Epips,Including Rev 11 to IP-1038,Rev 16 to IP-1050,Rev 6 to IP-1054 & Rev 12 to IP-1076
ML20055E6796 July 1990Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. All Socket Welded Joints from Header Isolation motor-operated Valves to RCS for All 4 Loops Examined.No Recordable Indications Found
ML20055D3463 July 1990Responds to NRC Bulletin 90-001 Re Loss of Fill Oil Transmitters Mfg by Rosemount.Operability Determinations Performed & Documented for All Rosemount 1153 & 1154 Transmitters at FacilityOperability Determination
ML20055D71929 June 1990Amends 900604 Rev 13 to QA Program
B13564, Provides NRC W/Info Re Plant Pressurizer as follow-up to 900607 Meeting.Info Particularly Concerns Disposition of Three Indications on Pressurizer Inner Surface & Discussion of Resolution of Previous Indication29 June 1990Provides NRC W/Info Re Plant Pressurizer as follow-up to 900607 Meeting.Info Particularly Concerns Disposition of Three Indications on Pressurizer Inner Surface & Discussion of Resolution of Previous Indication
B13550, Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl27 June 1990Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl
ML10033144627 June 1990Forwards Proprietary & Nonproprietary WCAP-12625 & WCAP-12626, Status Rept Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to NRC & WCAP-12627 & WCAP-12628, Indian Point Unit 2 Steam Generator Insp....
ML20043H99821 June 1990Forwards Application for Amend to License DPR-64,proposing Removal of cycle-specific Parameters from Tech Specs,Per Generic Ltr 88-16
ML20043G29711 June 1990Submits Supplemental Info Re New Temp Sensors Installed in Primary Auxiliary Bldg & Revised Safety Evaluation,To Support 900412 Request for Tech Spec Changes.New Temp Sensors in Piping Penetration Have Setpoints of 140 FFire Protection Program
ML09344105018 May 1990Forwards Rev 20 to Emergency Plan,Rev 33 to Emergency Response Activation & Revised Epips,Including IP-1011
ML10033122616 May 1990Forwards Proprietary WCAP 12573 & Nonproprietary WCAP 12574, Indian Point Unit 2 Steam Generator Insp,Repair & Restoration Program Per NRC 900314 Request.Proprietary Rept Withheld
ML20012F4793 April 1990Informs That Current Revs to Emergency Plan Sent to NRC Document Control Desk
ML1003312135 March 1990Forwards Rev 5 to Fire Protection Program Plan.Fire Protection Program
ML10033118919 January 1990Forwards Nonproprietary WCAP-11812 & Proprietary WCAP-11811, Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue, Per Request for Addl Info Re Implementation of NRC Bulletin 88-002.Proprietary Rept Withheld (Ref 10CFR2.790)
ML10033117120 November 1989Forwards Public Version of Revised Emergency Procedures Document,Including Rev 4 to IAP-7,Revs 2 to IP-1008 to IP-1014,Rev 6 to IP-1016,Rev 4 to IP-1019,Rev 5 to IP-1029 & Revs 3 to IP-1033 & IP-1039
ML10033115820 November 1989Forwards Rev 2 to WCAP-12294 & Proprietary Rev 2 to WCAP-12293, Indian Point Unit 2 Steam Generator Girth Weld/ Feedwater Nozzles Rept,Spring,1989 Outage. Proprietary Rept Withheld (Ref 10CFR2.790)
ML10033115414 November 1989Forwards Nonproprietary WCAP-12443 & Proprietary WCAP-12442, Info Presented to NRC Re Indian Point Unit 2 Steam Generator Loose Objects, Per 891102 Meeting Concerning 1989 Inservice Insp.Proprietary Rept Withheld (Ref 10CFR2.790)
ML10033117313 November 1989Forwards Public Version of Revised EPIPs Including Rev 9 to IP-1002 & Rev 5 to IP-1007.W/DH Grimsley 891211 Release Memo
ML10033114924 October 1989Forwards Public Version of Books 1 & 2 of Emergency Procedures Document,Including Rev 4 to IP-1029, Emergency Closeout/Class Reduction Written Summary to Authorities.
B13364, Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a))5 October 1989Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a))
A08598, Provides Clarification of Util Position Re Emergency Notification Sys (ENS) & Health Physics Network (Hpn).Util Intends to Provide Two Separate Qualified Individuals for ENS & HPN Communications During Exercise Drills2 October 1989Provides Clarification of Util Position Re Emergency Notification Sys (ENS) & Health Physics Network (Hpn).Util Intends to Provide Two Separate Qualified Individuals for ENS & HPN Communications During Exercise DrillsHealth Physics Network
B13376, Forwards Util Response to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Test Programs2 October 1989Forwards Util Response to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Test ProgramsStroke time
Power-Operated Valves
ML20248E45229 September 1989Forwards Proposed Tech Spec Pages Omitted from 890728 Application for Amend to License DPR-61 Re Cycle 16 Reload
B13375, Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk29 September 1989Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk
B13374, Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const27 September 1989Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const
ML20248B26725 September 1989Forwards Cycle 7 Startup Physics Test Rept,Indian Point Unit 3
B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl8 September 1989Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification EnclExemption Request
B13346, Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A30 August 1989Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.ASafe Shutdown
Tornado Generated Missile
TORMIS
A08170, Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-0330 August 1989Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-03
A08237, Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps28 August 1989Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps
B13351, Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced28 August 1989Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced
B13340, Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis24 August 1989Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis