Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DCL-90-202, Forwards Public Version of Corporate Emergency Response Plan Implementing Procedures (Ip),Including Rev 7 to IP 2.2,Rev 4 to IP 3.6,Rev 10 to IP 4.3 & Rev 8 to IP 4.97 August 1990Forwards Public Version of Corporate Emergency Response Plan Implementing Procedures (Ip),Including Rev 7 to IP 2.2,Rev 4 to IP 3.6,Rev 10 to IP 4.3 & Rev 8 to IP 4.9
HBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.7524 July 1990Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75
HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)17 July 1990Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)
ML20043A41317 May 1990Forwards Response to Violations Noted in Insp Repts 50-275/90-02 & 50-323/90-02 Re Unauthorized Individuals Gaining Access to Vital Areas & Failure to Protect Safeguards Matl.Response Withheld
ML20042G64910 May 1990Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML16341F69026 April 1990Forwards Public Version of Rev 9 to Corporate Emergency Response Plan 4.3, Radiological Analyses & Protection.
ML17083C2492 April 1990Forwards Response to Questions on Geology/Seismology/ Geophysics/Tectonics in long-term Seismic Program Final Rept.Proprietary Data Withheld (Ref 10CFR2.790).W/one Oversize DrawingEarthquake
ML20012E22626 March 1990Forwards Rev 17 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21)
ML20042H04220 March 1990Forwards Public Version of Rev 8 to Corporate Response Plan Implementing Procedure 4.3, Radiological Analysis & Protection.
ML16341F64320 March 1990Forwards Public Version of Rev 8 to Corporate Emergency Response Plan Implementing Procedure 4.3, Radiological Analysis & Protection.
ML16341F59414 February 1990Forwards Public Version of Rev 11 to EPIP EP G-4, Personnel Accountability & Assembly. W/900305 Release Memo
ML16341F5586 February 1990Forwards Proprietary WCAP-12495 & Nonproprietary WCAP-12496, Review of Flow Peaking & Tube Fatigue in Diablo Canyon Units 1 & 2 Steam Generators Per El Murphy Aug 1989 Request
ML16341F54030 January 1990Forwards Public Version of Revised Epips,Including Rev 17 to EP M-1 & EP M-6 & Rev 13 to EP G-2S1.W/900215 Release Memo
ML16341F54229 January 1990Forwards Public Version of Rev 7 to Corporate Erpip Update
ML20005G0529 January 1990Forwards Rev 3 to Safeguards Contingency Plan,Per Generic Ltr 89-07.Rev Withheld (Ref 10CFR73.21)
ML16341F43513 November 1989Forwards Public Version of Epips,Consisting of Pages 15,29 & Test Data Sheets to Rev 10 to EP M-4, Earthquake, & Pages 32-1 & 32-3 to Rev 16 to EP M-6, Nonradiological Fire. W/891205 Release MemoEarthquake
HBL-89-041, Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area11 September 1989Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation AreaHigh Radiation Area
ML20246E60616 August 1989Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively
DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form28 July 1989Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form
DCL-89-183, Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)6 July 1989Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20246J7059 June 1989Forwards Application for Exemption from Requirements of 10CFR50.54(W) Filed Per 10CFR50.12(a).Application Relates to Utils Request for Reduction in on-site Property Damage Insurance from Current $100,000 to $63,160,000
DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages30 May 1989Requests Renewal of Approval of QA Programs for Radioactive Matl Packages
ML20244B4887 April 1989Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively
DCL-89-051, Forwards Public Version of Rev 5 to EPIP EP R-3 & Rev 10 to EP G-4.W/undtd Release Memo2 March 1989Forwards Public Version of Rev 5 to EPIP EP R-3 & Rev 10 to EP G-4.W/undtd Release Memo
DCL-89-042, Forwards Rev 16 to Physical Security Plan,Per NRC .Rev Withheld (Ref 10CFR73.21)23 February 1989Forwards Rev 16 to Physical Security Plan,Per NRC .Rev Withheld (Ref 10CFR73.21)
ML20235J21917 February 1989Forwards Endorsements,Including Endorsement 3 to Nelia Certificate NW-132,Endorsement 3 to Maelu Certificate MW-73, Endorsement 4 to Nelia Certificate NW-51 & Endorsement 4 to Maelu Certificate MW-135
ML16341E88230 November 1988Forwards Proprietary WCAP-12064, Diablo Canyon 1 & 2 Evaluation for Tube Vibration Induced Fatigue. All Five Tubes Requiring Corrective Action Removed from Svc During Unit 2 Refueling Outage.Rept Withheld (Ref 10CFR2.790)
DCL-88-277, Endorses NUMARC Comments on Proposed Rule 10CFR26 Re Fitness for Duty.Receipt of Matl Should Be Ack on Ltr & Returned in Encl Envelope18 November 1988Endorses NUMARC Comments on Proposed Rule 10CFR26 Re Fitness for Duty.Receipt of Matl Should Be Ack on Ltr & Returned in Encl EnvelopeFitness for Duty
HBL-88-077, Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement13 September 1988Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies RequirementExemption Request
DCL-88-216, Forwards Public Version of Emergency Response Plan Implementing Procedures for Plants,Including IP 4.5, Engineering & Technical Support2 September 1988Forwards Public Version of Emergency Response Plan Implementing Procedures for Plants,Including IP 4.5, Engineering & Technical Support
HBL-88-074, Forwards Changes to Rev 2 to Physical Security Plan.Info Withheld (Ref 10CFR73.21)26 August 1988Forwards Changes to Rev 2 to Physical Security Plan.Info Withheld (Ref 10CFR73.21)
ML16342B4691 August 1988Forwards Proprietary WCAP-11312, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/ Surveillance Optimization Program. Rept Withheld (Ref 10CFR2.790)
HBL-88-066, Forwards Addl Info Re Use of Security Seals on Spent Fuel Storage Pool,Per19 July 1988Forwards Addl Info Re Use of Security Seals on Spent Fuel Storage Pool,Per
HBL-88-055, Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination6 June 1988Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination
ML20154L34123 May 1988Forwards Replacement Pages for Proposed Safstor Tech Specs, Rev 0,per 880505 Discussions W/Nrc
DCL-88-128, Forwards Response to NRC Re Violations Noted in Insp Rept 50-275/88-05.Response Withheld (Ref 10CFR73.21)12 May 1988Forwards Response to NRC Re Violations Noted in Insp Rept 50-275/88-05.Response Withheld (Ref 10CFR73.21)
DCL-88-100, Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed21 April 1988Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed
DCL-88-095, Forwards Changes to Rev 16 of Physical Security Plan & Rev 2 to Training & Qualification Plan.Changes Withheld (Ref 10CFR73.21)19 April 1988Forwards Changes to Rev 16 of Physical Security Plan & Rev 2 to Training & Qualification Plan.Changes Withheld (Ref 10CFR73.21)
HBL-88-026, Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested16 March 1988Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested
DCL-88-051, Forwards Rev 16 to Physical Security Plan.Rev Withheld4 March 1988Forwards Rev 16 to Physical Security Plan.Rev Withheld
ML20151G11822 February 1988FOIA Request for Documents Re ACRS Subcommittee Meetings on 750218-19 Re PlantUltimate heat sink
Safe Shutdown Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
ML20147E36510 February 1988FOIA Request for Documents Re NRC 750318 Summary of ACRS Subcommittee Meeting on 750218-19Finite Element Analysis
Earthquake
HBL-87-066, Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info16 November 1987Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info
DCL-87-269, Forwards Description of Implementation Schedule for Miscellaneous Amends & Revised Pages for Rev 16 to Physical Security Plan & for Rev 2 to Contingency Plan,Per NRC 870924 Request.Schedule & Revised Pages Withheld (Ref 10CFR73.21)9 November 1987Forwards Description of Implementation Schedule for Miscellaneous Amends & Revised Pages for Rev 16 to Physical Security Plan & for Rev 2 to Contingency Plan,Per NRC 870924 Request.Schedule & Revised Pages Withheld (Ref 10CFR73.21)
ML20236N5369 November 1987Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments 860323-870322. Rept Same as Reporting Interval of Annual FSAR Update Rev
ML20236H96926 October 1987Forwards Endorsement 25 to Maelu Policy MF-103 & Endorsement 55 to Nelia Policy NF-228
DCL-87-249, Forwards Page Changes for Rev 16 to Physical Security Plan, Per Util 870826 Commitment in Response to NRC Reaffirming Validity of Violation Opposed in Util13 October 1987Forwards Page Changes for Rev 16 to Physical Security Plan, Per Util 870826 Commitment in Response to NRC Reaffirming Validity of Violation Opposed in Util
DCL-87-216, Responds to NRC Re Violations Noted in Insp Rept 50-323/87-18.Corrective Actions:Procedure OP A-2:II Revised & Reissued to Clarify RCS Level to Be Maintained During mid-loop Operation8 September 1987Responds to NRC Re Violations Noted in Insp Rept 50-323/87-18.Corrective Actions:Procedure OP A-2:II Revised & Reissued to Clarify RCS Level to Be Maintained During mid-loop OperationReactor Vessel Water Level
HBL-87-054, Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 198628 August 1987Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 1986
HBL-87-052, Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of Responses21 August 1987Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of ResponsesOffsite Dose Calculation Manual
Fuel cladding