Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23319A245 | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | 10 January 2024 | Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | |
CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability | 9 January 2024 | Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability | Time of Discovery Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Incorporated by reference Turbine Missile |
CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | 8 January 2024 | Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Offsite Circuit |
CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) | 13 December 2023 | Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) | Boric Acid Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Process Control Program Fuel cladding |
ML22348A005 | 25 January 2023 | Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements | Cyber Security Pressure Boundary Leakage Fire Protection Program |
ML22349A647 | 20 January 2023 | Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules | Time of Discovery Cyber Security Fire Protection Program |
ML22348A066 | 13 January 2023 | Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary | Shutdown Margin Stroke time Anticipated operational occurrence Incorporated by reference Finite Element Analysis Abnormal operational transient Feedwater Controller Failure MELLLA Time Critical Operator Action Fuel cladding Power change |
ML22276A161 | 24 October 2022 | Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Cyber Security Fire Protection Program |
ML22259A204 | 29 September 2022 | Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | High Radiation Area Surveillance Frequency Control Program Offsite Circuit |
ML22187A019 | 20 September 2022 | Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps | |
ML22187A181 | 20 September 2022 | Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train | Ultimate heat sink Cyber Security Surveillance Frequency Control Program Fire Protection Program |
CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) | 27 July 2022 | Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) | Anticipated operational occurrence Pressure and Temperature Limits Report Fuel cladding |
CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) | 13 July 2022 | Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) | Surveillance Frequency Control Program Pressure Boundary Leakage |
WBL-22-017, Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report | 22 March 2022 | Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report | Post Accident Monitoring |
ML21260A210 | 22 November 2021 | Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level | Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML21285A068 | 28 October 2021 | Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML21158A284 | 17 September 2021 | Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation | Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML21214A139 | 30 August 2021 | Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters | Safe Shutdown Anticipated operational occurrence |
ML21099A246 | 14 May 2021 | Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec | Cyber Security Surveillance Frequency Control Program Pressure Boundary Leakage Fire Protection Program Power change |
ML21078A484 | 5 May 2021 | Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Temporary Modification Cyber Security Tornado Generated Missile Surveillance Frequency Control Program Earthquake Fire Protection Program |
ML21084A190 | 4 May 2021 | Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation | Safe Shutdown Anticipated operational occurrence Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment |
ML21075A076 | 30 April 2021 | Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis | Safe Shutdown High winds Tornado Missile Probabilistic Risk Assessment FLEX Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Large early release frequency TORMIS Tornado Missile Risk Evaluator Fuel cladding |
ML21041A489 | 8 April 2021 | Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 | |
ML21015A034 | 9 March 2021 | Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation | Anticipated operational occurrence Post Accident Monitoring |
ML21021A349 | 3 March 2021 | Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies | Boric Acid Shutdown Margin Anticipated operational occurrence Earthquake Power change |
ML21034A169 | 26 February 2021 | Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology | Coatings Cyber Security Fuel cladding Fire Protection Program |
ML20232C622 | 11 February 2021 | Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 | Safe Shutdown Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Fire Protection Program Power change |
ML20282A345 | 19 November 2020 | Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements | |
ML20226A444 | 21 October 2020 | Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Internal Flooding Coatings Operator Manual Action Cyber Security Emergency Lighting Incorporated by reference Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Time Critical Operator Action Safeguards Contingency Plan Subsequent License Renewal Earthquake Fire Protection Program Flow Induced Vibration Power Uprate Measurement Uncertainty Recapture |
ML20273A043 | 29 September 2020 | Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | |
ML20190A105 | 11 August 2020 | Correction to Amendment No. 319 Regarding Revisions to Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation | Water Inventory Control |
ML20156A018 | 10 August 2020 | Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve | Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Probabilistic Risk Assessment Nondestructive Examination Cyber Security Fire Protection Program |
ML20085G896 | 26 June 2020 | Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times | |
CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) | 27 March 2020 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) | |
CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific | 2 March 2020 | Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Fire Protection Program Power change |
ML20028F733 | 28 February 2020 | Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 | High winds Shutdown Margin High Radiation Area Ultimate heat sink Internal Flooding Hydrostatic Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Tritium Producing Burnable Absorber Rods Offsite Circuit Fire Protection Program Backfit Power change |
ML19276E557 | 9 December 2019 | Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 | Safe Shutdown Anticipated operational occurrence Cyber Security Emergency Lighting Battery sizing Fire Protection Program |
ML19238A005 | 26 November 2019 | Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 | Safe Shutdown Anticipated operational occurrence Cyber Security FLEX Offsite Circuit Fire Protection Program |
ML19319C831 | 21 November 2019 | Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed | Boric Acid Shutdown Margin Anticipated operational occurrence Earthquake Power change |
CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) | 30 September 2019 | Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) | Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Nondestructive Examination Power change |
CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) | 29 August 2019 | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) | Safe Shutdown Surveillance Frequency Control Program |
ML18277A110 | 27 August 2019 | Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection | Safe Shutdown Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Open Phase Condition Fire Protection Program |
ML19112A004 | 25 July 2019 | Issuance of Amendment Nos. 127 and 30 Regarding the Use of Optimized Zirlo Fuel Rod Cladding | Anticipated operational occurrence Cyber Security Tritium Producing Burnable Absorber Rods Exemption Request Fuel cladding Fire Protection Program |
ML19098A774 | 7 June 2019 | Issuance of Amendments Regarding Technical Specifications Changes Pertaining to 120-Volt Alternating Current Vital Buses | Safe Shutdown Anticipated operational occurrence Cyber Security Fire Protection Program |
ML18255A156 | 30 October 2018 | Issuance of Amendment to Modify Technical Specification 3.3.1 Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure | Anticipated operational occurrence Cyber Security Fire Protection Program |
ML18283A897 | 10 October 2018 | Enclosure 1: Proposed Changes to Browns Ferry Nuclear Plant Unit 1 Technical Specifications, Attachments 1, 2, & 3 | Shutdown Margin Half scram Hydrostatic Abnormal operational transient Fast acting solenoid valve Overtravel Earthquake Fuel cladding Fire Watch |
ML18251A003 | 27 September 2018 | Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) | Safe Shutdown High winds Mission time Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier Fire Protection Program Very Early Warning Fire Detection Grace period |
ML18079A029 | 26 June 2018 | Issuance of Amendments Regarding Adoption of TSTF-547, Clarification of Rod Position Requirements (CAC Nos. MF8912and MF8913; EPID L-2016-LLA-0034) | Shutdown Margin Cyber Security Fire Protection Program |
ML17311A786 | 7 December 2017 | Issuance of Amendment Regarding Ventilation Filter Testing Program (CAC No. MF9584; EPID L-2017-LLA-0207) |