Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N438 | 25 October 1999 | Safety Evaluation Supporting Amend 17 to License DPR-9 | |
ML20217P355 | 22 October 1999 | LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided | Contraband Stolen |
ML20217N928 | 20 October 1999 | Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised | |
ML20217H363 | 14 October 1999 | Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su | |
ML18152A281 | 12 October 1999 | Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. | Liquid penetrant |
ML20212J925 | 1 October 1999 | Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant | VT-2 |
ML20217D685 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20217D121 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with | |
NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Fermi 2.With | |
ML20217G697 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A886 | 13 September 1999 | Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure boundary leak |
ML20216J873 | 10 September 1999 | Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant | Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Process Control Program Fire Protection Program |
ML20211N261 | 8 September 1999 | Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable | |
ML20211J242 | 31 August 1999 | Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 | Earthquake |
ML20211J256 | 31 August 1999 | Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 | |
ML20216E501 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with | |
ML20212A448 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With | |
ML20212A444 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with | |
NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Fermi 2.With | |
ML17326A201 | 23 August 1999 | LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr | Safe Shutdown High winds |
ML20211E989 | 20 August 1999 | LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5 | Hydrostatic VT-2 EVT-1 |
ML20210T079 | 13 August 1999 | Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable | |
ML20210Q993 | 31 July 1999 | Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud | |
ML20210S141 | 31 July 1999 | Monthly Operating Repts for July 1999 for North Anna Power Station.With | |
ML20210L705 | 31 July 1999 | Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With | |
NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Fermi 2.With | |
ML20210S609 | 31 July 1999 | Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with | |
ML20210N600 | 27 July 1999 | ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included | Hydrostatic Coatings Moisture barrier |
ML20210B794 | 15 July 1999 | SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs | Incorporated by reference |
LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified | 30 June 1999 | Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified | |
ML20209D774 | 30 June 1999 | Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 | |
ML20209G021 | 30 June 1999 | GE-NE-B13-02010-33NP, Evaluation of Limerick Unit 2 Shroud Cracking for at Least One Fuel Cycle of Operation | |
NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Fermi 2.With | |
NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with | 30 June 1999 | Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with | |
ML20209F172 | 30 June 1999 | Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With | |
ML20209E564 | 30 June 1999 | Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With | |
LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed | 25 June 1999 | Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed | |
ML20196C698 | 21 June 1999 | Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable | Incorporated by reference |
ML20195G465 | 31 May 1999 | Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2 | |
NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Fermi 2.With | |
ML20209D779 | 31 May 1999 | Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2 | |
ML20195K281 | 31 May 1999 | Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with | |
ML20207H833 | 31 May 1999 | Non-proprietary Rev 0 to 1H61R, LGS - Unit 2 Core Shroud Ultrasonic Exam | Nondestructive Examination |
ML20195G190 | 31 May 1999 | Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with | |
ML20206L483 | 10 May 1999 | SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping | Probabilistic Risk Assessment Incorporated by reference |
ML20206J930 | 10 May 1999 | SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves | Power-Operated Valves Backfit |
ML20195B302 | 6 May 1999 | Rev 0 to PECO-COLR-L2R5, COLR for Lgs,Unit 2 Reload 5 Cycle 6 | Minimum Critical Power Ratio |
ML20206G508 | 5 May 1999 | Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety | Incorporated by reference |
ML20195G476 | 30 April 1999 | Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2 | Coast down |