Issue date | Title | Topic | |
---|---|---|---|
ML20217J479 | 18 October 1999 | SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 | Exemption Request |
ML20217G996 | 14 October 1999 | SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & | VT-2 Incorporated by reference |
A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | |
ML20217H522 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With | |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A744 | 10 September 1999 | Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety | Hydrostatic VT-2 Incorporated by reference Finite Element Analysis Liquid penetrant |
ML20211K040 | 31 August 1999 | SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 | Nuclear Accident Reporting System Exemption Request |
A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | |
ML20212B926 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With | |
ML20210R642 | 13 August 1999 | ISI Outage Rept for A2R07 | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML20210U811 | 4 August 1999 | SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a | |
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210R343 | 31 July 1999 | Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With | |
A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
ML20210K986 | 30 July 1999 | Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
ML20210E225 | 21 July 1999 | B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Pressure Boundary Leakage |
M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
ML20216D384 | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
ML20209G175 | 8 July 1999 | SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) | |
BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | |
ML20209H371 | 30 June 1999 | Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With | |
ML20207H807 | 30 June 1999 | Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations | Anticipated operational occurrence Hydrostatic |
ML20207H794 | 30 June 1999 | Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation | |
ML20207H785 | 30 June 1999 | Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation | |
ML20207H777 | 30 June 1999 | Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 | |
A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
ML20207H762 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20207H756 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
ML20209H748 | 31 May 1999 | Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 | |
ML20195J800 | 31 May 1999 | Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With | |
BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | |
ML20207B648 | 25 May 1999 | SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station | |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |
ML20195H952 | 30 April 1999 | Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 | |
A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With | |
ML20206R699 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With | |
M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) | 28 April 1999 | Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) | Shutdown Margin |
ML20195C796 | 28 April 1999 | Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) | Shutdown Margin |
A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With | |
BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With | |
ML20205P700 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With | |
ML20205B509 | 26 March 1999 | SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 | Boric Acid VT-2 Incorporated by reference Scaffolding |
ML20205C510 | 21 March 1999 | Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections | Ultimate heat sink Offsite Circuit |
ML20204G383 | 19 March 1999 | Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 | Boric Acid VT-2 Incorporated by reference Scaffolding |
ML20206A883 | 17 March 1999 | Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function | Shutdown Margin |