Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212J26031 March 1998Technical Evaluation Rept on 'Submittal Only' Review of IPEEE at Pilgrim Nuclear Power Station, Final ReptHot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Seismically rugged
Earthquake
Fire Protection Program
L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station30 June 1996TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power StationHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Through-Wall Leak
Backfit
ML20128K20631 May 1996Technical Evaluation Rept of Pilgrim IPE Back-End Submittal Final ReptProbabilistic Risk Assessment
Hardened vent
ML20128K21311 April 1996Plant Technical Evaluation Rept on IPE Submittal Human Reliability Analysis,Final ReptInternal Flooding
Probabilistic Risk Assessment
ML20128K1879 April 1996Pilgrim,Technical Evaluation Rept on IPE Front End AnalysisInternal Flooding
Probabilistic Risk Assessment
Hardened vent
L-94-013, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant30 November 1994Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for PlantReactor Vessel Water Level
Scram Discharge Volume
ML20044E73923 June 1993Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station.High Radiation Area
Ultimate heat sink
Stroke time
Squib
Scram Discharge Volume
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
Grace period
ML20116J68531 October 1992High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide.Pilgrim Nuclear Power StationReactor Vessel Water Level
Probabilistic Risk Assessment
Overtravel
ML20094F05531 January 1992Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power StationHigh Radiation Area
Ultimate heat sink
Stroke time
Scram Discharge Volume
Fast acting solenoid valve
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
ML20073E56431 March 1991Technical Evaluation Rept Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power StationHigh Radiation Area
Ultimate heat sink
Stroke time
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
ML20072P77530 June 1990Conformance to Reg Guide 1.97:PilgrimPost Accident Monitoring
Squib
Fuel cladding
ML19327B6733 October 1989Technical Evaluation Rept for Dcrdr at Boston Edison Co, Pilgrim Nuclear Power Station.
ML19327B6763 October 1989Technical Evaluation Rept for Boston Edison Co,Pilgrim Station Dcrdr Suppl Summary Rept.
ML20245G77912 April 1989In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Power Station Spds
ML20245G76012 April 1989In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station
ML20235H59730 January 1989Evaluation of Pilgrim Offsite Dose Calculation Manual Through Rev 2Grab sample
Offsite Dose Calculation Manual
ML20155B7391 June 1988Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co
ML20155B7531 June 1988Corrected Mod 1,restoring Funds That Was Deobligated & Providing Final Increment of Funding to Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee, Pilgrim & Seabrook Resident Sites
ML20154P68031 May 1988Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Pilgrim Nuclear Power Station, Unit 1Hydrostatic
VT-2
Incorporated by reference
ML20150D90017 March 1988Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co
ML20150D90917 March 1988Mod 1,deobligating Funds from Total Obligated Amount of Contract & to Correct FIN Number,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites
ML20149F13111 January 1988Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee & Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co
ML20149F16911 January 1988Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co
ML20235V15231 August 1987Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2
ML20236P21810 August 1987Mod 1,increasing Total Amount of Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee, Pilgrim & Seabrook Resident Sites
ML20236P20510 August 1987Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co
ML20206S7138 April 1987Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co
ML20206S7878 April 1987Mod 1,changing Billing Address as Result of NRC Reorganization,To Local Telephone Svc for Yankee Rowe, Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites
ML20214S52031 March 1987Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station, Informal ReptStroke time
Hydrostatic
Scram Discharge Volume
Excess Flow Check Valve
Power Operated Valves
ML20211N42623 February 1987Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co
ML20211N39823 February 1987Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co
ML20245A44830 September 1986Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1
ML20206Q05328 August 1986Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & 10CFR50,App R,Pilgrim Nuclear Power Station, Technical Evaluation ReptSafe Shutdown
Fire Barrier
Coatings
Emergency Lighting
Exemption Request
Chernobyl
Fuel cladding
Fire Protection Program
Backfit
ML20212A70724 July 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Pilgrim Plant, Supplementary Technical Evaluation Rept
ML20206N27930 June 1986Estimated Safety Significance of Generic Safety Issue 61Probabilistic Risk Assessment
Earthquake
ML20205N85714 May 1986Masonry Wall Design, Technical Evaluation Rept for Pilgrim Nuclear Generating Station 1Tornado Missile
Finite Element Analysis
Earthquake
ML20153H08520 February 1986Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Company
ML20153H04720 February 1986Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co
ML20244D63017 January 1986Draft Technical Evaluation Rept, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2, 'Post-Trip Review:Data & Info Capabilities....'
ML20138B59331 October 1985Conformance to Reg Guide 1.97,Pilgrim Nuclear Power StationFuel cladding
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D39810 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station..
ML20134P98530 June 1985Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20132D0461 May 1985Technical Evaluation Rept,Second Interval Inservice Insp Program for Pilgrim Nuclear Power Station,Unit 1Hydrostatic
Dissimilar Metal Weld
ML20127D63110 April 1985Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear StationScram Discharge Volume
Failure to Scram
ML20106C16631 January 1985Control of Heavy Loads,Pilgrim Nuclear Power Station, Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML20106A57930 September 1984Technical Evaluation of Pilgrim I Plant-Unique Analysis Rept
ML20106A55726 September 1984Audit for Mark I Containment Long-Term Program Structural Analysis for Operating Reactors,Pilgrim Station Unit 1, Technical Evaluation ReptFinite Element Analysis
ML20091J5709 April 1984Franklin Research Ctr Comments on Pilgrim Radiological Effluent Tech Specs Submittal (Dtd 830415)