Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20202B38915 September 1997Rev 1 to, Technical Evaluation of Duane Arnold Energy Ctr Analysis of Ampacity Loads for Fire Barriers Clad Power CablesFire Barrier
ML20149L64931 August 1995Plant TER on IPE Front End AnalysisMission time
Internal Flooding
Probabilistic Risk Assessment
Squib
Hardened vent
Backfit
Failure to Scram
Overspeed trip
Loss of condenser vacuum
ML20149L65431 August 1995Plant TER on IPE Back-End SubmittalMission time
Hardened vent
ML20094P18831 May 1995TER, Duane Arnold Energy Ctr Pump & Valve Inservice Testing Program,Rev 13,Third 10-Yr IntervalReactor Vessel Water Level
Stroke time
Excess Flow Check Valve
Water hammer
ML20063E90630 December 1993Parametric Study of Potential for BWR ECCS Blockage Due to LOCA Generated Debris, Vol 2,Parts 1 & 2
ML11238051612 November 1993TER to Request for TS Change,Ielp,Cipc & Cbpc,Daec.
ML20118C0951 August 1992Technical Evaluation of Duane Arnold Energy Ctr Emergency Svc Water
ML20101Q34330 June 1992Metallurgical Evaluation of Weld Overlaid Pipe Sections from Brunswick Unit 2 Nuclear Power Station
ML20058A11327 September 1990Notification of Contract Execution,Awarding Task Order 3, NDE Support at Brunswick 1 Nuclear Power Plant. Contractor:Tet,Inc
ML20065C96124 August 1990Rev 2 to Technical Evaluation Rept Brunswick Steam Electric Plant Units 1 & 2 Station Blackout Evaluation, Final ReptSafe Shutdown
Reactor Vessel Water Level
ML20071P71530 November 1989Rev 1 to Brunswick Steam Electric Plant Unit 2 Risk-Based Insp Guide, Final VersionReactor Vessel Water Level
Mission time
Probabilistic Risk Assessment
Squib
High Energy Line Break
Fuel cladding
Water hammer
ML20011D91530 November 1989Review of the Brunswick Steam Electric Plant Probabilistic Risk AssessmentHigh winds
Ultimate heat sink
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Feedwater Heater
Earthquake
Scaffolding
Loss of condenser vacuum
ML20005E99730 November 1989Technical Evaluation Rept Pump & Valve Inservice Testing Program,Brunswick Steam Electric Plant,Units 1 & 2.Safe Shutdown
Stroke time
Squib
Scram Discharge Volume
Excess Flow Check Valve
Integrated leak rate test
Cold shutdown justification
Power Operated Valves
ML19325C14510 July 1989Technical Evaluation Rept for Dcrdr at CP&L Brunswick Steam Electric Plant,Units 1 & 2.
ML19325C1477 July 1989Post-Implementation Audit Rept for CP&L Brunswick Steam Electric Plant Units 1 & 2 SPDS 890515-18.
ML20246B81530 April 1989Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept
ML20070Q52531 January 1989Nuclear Power Plant Sys Sourcebook,Brunswick 1 & 2Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Scram Discharge Volume
Failure to Scram
Overspeed trip
ML20196D87818 February 1988Technical Evaluation Rept of Dcrdr for Iowa Electric Light & Power Co Duane Arnold Energy Ctr
ML20246B72231 January 1988Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Relief Requests:Cp&L,Brunswick Steam Electric Plant, Units 1 & 2
ML20246P96731 January 1988Technical Evaluation Rept on Second 10-yr Interval Inservice Insp Program Plan,Brunswick Steam Electric Plant Unit 1Hydrostatic
VT-2
Incorporated by reference
Intergranular Stress Corrosion Cracking
ML20236P64031 July 1987Review of Recirculation Pump Trip Design for Brunswick Steam Electric Plants, Informal Rept
ML20215M08831 May 1987Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, Duane Arnold, Informal Rept
ML20215L88231 May 1987Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Brunswick 1 & 2, Informal Rept
ML20215L86330 April 1987Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Brunswick 1 & 2, Informal Rept
ML20214R06830 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Arnold,Brunswick-1 & 2, Informal Rept
ML20211P06817 July 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Duane Arnond Energy Ctr, Supplementary Technical Evaluation Rept
ML20211P07816 July 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Brunswick Steam Electric Plant Units 1 & 2, Supplementary Technical Evaluation Rept
ML20203P9997 March 1986Site Survey of Brunswick Steam Electric Plant Units 1 & 2 Maint Program & Practices, Technical Ltr ReptSystematic Assessment of Licensee Performance
Backfit
ML20127P36330 June 1985IN-PLANT Source Term Measurements at Brunswick Steam Electric Station
ML20132D62828 June 1985Masonry Wall Design,Duane Arnold Energy Ctr, Technical Evaluation ReptSafe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML20128N64831 May 1985Adequacy of Station Electric Distribution Sys Voltages, Brunswick Steam Electric Station,Units 1 & 2, Informal Rept
ML20128A57425 March 1985Conformance to Reg Guide 1.97,Brunswick Steam Electric Plant Units 1 & 2, Informal ReptBoric Acid
Squib
ML20127D62515 March 1985Evaluation of Detailed Control Room Design Review Program Plan for Brunswick Steam Electric Plant,Units 1 & 2
ML20115A38216 November 1984Masonry Wall Design,Brunswick Steam Electric Plant Units 1 & 2, Interim Technical Evaluation ReptTornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
ML20106G00916 November 1984Masonry Wall Design,Brunswick Steam Electric Plant Units 1 & 2, Technical Evaluation ReptTornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
ML20100R71430 October 1984Conformance to Reg Guide 1.97,Brunswick Steam Electric Plant Units 1 & 2, Interim Rept Covering Emergency Response CapabilityBoric Acid
Squib
Unidentified leakage
ML20091G10130 May 1984Control of Heavy Loads (C-10),Iowa Electric Light & Power Co,Duane Arnold Energy Ctr, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20090H71223 April 1984Control of Heavy Loads,Brunswick Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20085J3187 October 1983Audit for Mark 1 Containment Long-Term Program - Structural Analysis for Operating Reactors,Brunswick Units 1 & 2, Technical Evaluation ReptFinite Element Analysis
ML20085J05430 September 1983Technical Evaluation of Brunswick Units 1 & 2,Plant-Unique Analysis ReptSubsequent actuation
ML20091D65431 July 1983Integrity of Brunswick Steam Electric Plant,Units 1 & 2 Reactor Coolant Boundary Piping Sys, Technical EvaluationWeld Overlay
Nondestructive Examination
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
Pressure boundary leak
Dissimilar Metal Weld
Unidentified leakage
Unidentified leak
ML20079Q72613 June 1983ECCS Repts (F-47) TMI Action Plan Requirements,Brunswick Steam Electric Plant,Units 1 & 2, Technical Evaluation ReptOverspeed trip
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20065R24515 July 1982Operating Reactors - TMI Lessons Learned,NUREG-0737 Response Evaluations (Program Ii);Project 1,RCS Vents for Brunswick 1 & 2, Final Technical Evaluation Rept
ML20078Q6009 July 1982Control of Heavy Loads,Brunswick Units 1 & 2, Draft Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML20069E17830 June 1982Investigation of Raychem Cable Installed in Brunswick Plant,Phase 2-Evaluation & Test RecommendationBoric Acid
ML20069E43826 April 1982Technical Evaluation Rept on Monitoring of Electric Power to Reactor Protection Sys for Brunswick Steam Electric Plant,Units 1 & 2
ML20039A11510 December 1981Masonry Wall Design:Ia Electric Light & Power Co,Duane Arnold Energy Ctr, Interim Technical Evaluation ReptTornado Missile
Safe Shutdown Earthquake