ML20205L04331 January 1999Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2Boric Acid
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 130 November 1998Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1Boric Acid
Hydrostatic
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML20128F44131 August 1995TER on IPE Back-End SubmittalMission time
Probabilistic Risk Assessment
ML20129H30031 August 1995App a, TER on IPE Front End AnalysisShutdown Margin
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML20128F46923 August 1995TER on IPE Submittal Human Reliability Analysis,Final ReptInternal Flooding
ML20077A02831 August 1994Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2
ML20105B92030 June 1992Technical Rept MT-L1529-6, Evaluation of Failed Riverwater Pump Shaft Coupling from Beaver Valley Power Plant
ML20087B03431 October 1991TER Pump & Valve Inservice Testing Program,Beaver Valley Power Station,Unit 2
ML20077B09331 March 1991TER Pump & Valve Inservice Testing Program Bvps,Unit 1Boric Acid
Shutdown Margin
Stroke time
Cold shutdown justification
Flow Induced Vibration
ML20079A83431 March 1991Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan,Beaver Valley Power Station Unit 1VT-2
Incorporated by reference
Through-Wall Leak
Scaffolding
ML20072P75827 August 1990Station Blackout Evaluation,Beaver Valley Power Station, Units 1 & 2 Final Technical Evaluation ReptSafe Shutdown
ML20245H15230 April 1989Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Beaver Valley Unit 2Loop seal
Anticipated operational occurrence
Earthquake
ML20246B81530 April 1989Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept
ML20151F84219 July 1988Review of Beaver Valley,Unit 2 FSAR Amends 17 & 18Fire Protection Program
ML20235M88430 June 1987Final Evaluation of Beaver Valley Power Station Unit 2 Tech Specs, Informal Rept
ML20235L90630 June 1987Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept
ML20214R23330 April 1987Audit of Environ Qualification of Safety-Related Electrical Equipment for Beaver Valley Power Station Unit 2, Informal ReptBoric Acid
Anticipated operational occurrence
Flow Induced Vibration
ML20209F67122 January 1987Evaluation of Dcrdr for Beaver Valley Unit 1, Technical Evaluation Rept
ML20215J05631 December 19862 Sqrt, Informal ReptSafe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Earthquake
Coast down
ML20207B66030 November 1986Conformance to Reg Guide 1.97,Beaver Valley Power Station, Unit 1, Technical Evaluation ReptBoric Acid
Shutdown Margin
Anticipated operational occurrence
ML17334B03330 November 1986Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28.
ML20203G50722 July 1986Marked-up Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...Post-Trip Review:Data & Info Capabilities,Beaver Valley Power Station,Unit 2, Draft Technical Evaluation Rept
ML20199F51528 March 1986Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2Safe Shutdown
ML20138K87217 October 1985Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 `Post-Trip Review:Data...,' Technical Evaluation Rept
ML20138H21830 September 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20100R63427 November 1984Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20086H66530 November 1983Control of Heavy Loads at Nuclear Power Plants,Beaver Valley Nuclear Power Plant Unit 2 (Phase I), Draft Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML20076C3215 October 1982ECCS Repts (F-47),TMI Action Plan Requirements,Beaver Valley Power Station Unit 1, Technical Evaluation Rept
ML20027A90231 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation ReptFuel cladding
Power change
ML20062A49731 May 1982Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept
ML20052F65930 April 1982Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1.
ML20052H48431 March 1982Technical Evaluation Rept of Overpressure Protection Sys for Beaver Valley Power Station,Unit 1, Preliminary ReptOperating Basis Earthquake
ML19240B99831 March 1981Inservice Testing Program for Pumps & Valves at Beaver Valley Power Station Unit 1 (Docket 50-334) for Period 800130-810929 Revision 1 to Safety EvaluationBoric Acid
High Radiation Area
Stroke time
Power Operated Valves
ML19341C98928 February 1981Evaluation of Operation of Beaver Valley Power Station, Unit 1 W/One Loop Isolated, Technical Evaluation ReptShutdown Margin
Fuel cladding
ML20003C09231 January 1981Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept
ML19341B37431 December 1980Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept
ML20002A54931 October 1980Inservice Testing Program for Pumps & Valves,Beaver Valley Power Station Unit 1, Safety Evaluation for 800130-810929Boric Acid
High Radiation Area
Stroke time
Power Operated Valves
Scaffolding
ML20002A54631 October 1980Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept
ML19338C68914 August 1980Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Tech Spec Change for Main Steamline Break Protection Sys of Beaver Valley Nuclear Power Plant,Unit 1.Shutdown Margin
ML19338C72431 July 1980Technical Evaluation Rept on Mod of P-8 Reactor Trip Circuitry,Beaver Valley Nuclear Station,Unit 1.
ML19321A31528 May 1980Electrical,Instrumentation & Control Features of Quench Spray Sys Mods - Beaver Valley Nuclear Station,Unit 1.