 Issue dateTitleTopic
ML20138E61917 January 1995ASTM E136-94 Behavior of Matls in Vertical Tube Furnace. W/Rept Summarizing Results of Preliminary Tests Under Project 82NK21937,dtd 830926 & Ltr Forwarding Test Results Re Caulking Matl
ML20209B51122 April 1987Summary Rept for Davis-Besse Motor-Operated Valve Reliability ProgramStroke time
Hydrostatic
ML20212M81726 August 1986Test of Integrated Control Sys at Davis-Besse Nuclear Power Station to Determine Integrated Control Sys Response When Power Lost & Subsequently Restored, on 860317
ML20107B30631 January 1985Rev 1 to Calculation M-8, Pressurizer Surge Line - Class 1 Piping AnalysisEarthquake
ML20099H11831 December 1984Reactor Containment Bldg Integrated Leak Rate Test
ML20128N83630 September 1982Performance Test Program for Increased Blowdown on Crosby 4M16 HB-BP-86 Pressurizer Safety ValveHydrostatic
ML20063E29122 March 1982Environ Qualification Rept 3394-2,Anticipatory Reactor Trip Sys
ML20063E2351 March 1982Seismic Qualification Rept 3394-1 Anticipatory Reactor Trip SysSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
ML20063E27311 February 1982Seismic Simulation Test Program on Anticipatory Reactor Trip Sys (Arts)
ML20039E68018 December 1981Rept on 811209 Ottawa County/Toledo Edison Siren Test.
ML20010G8629 June 1981B&W Post-Test Analysis for Semiscale Test S-07-10D.Loop seal
ML20004C08720 May 1981Suppl to Post-Refueling Physics Testing,Davis-Besse Unit 1, Cycle 2 Power Escalation Testing.Power change
ML19350A4295 March 1981Cycle 2 Startup Rept for Facility
ML20062J93514 October 1980Analog & Digital Isolation Device Qualification, & Addendum a
ML19337B63129 August 1980Primary Reactor Containment Integrated Leakage Rate Test Rept.Scaffolding
ML19260A2035 October 1979Revised Pages to Initial Startup Rept, Suppl 6,covering 790706-1005
ML19259C7068 August 1979Revised Pages to Chapter 1 of Initial Startup Rept,As Revised by Suppl 5 for Period 79046-0705
ML19319B82626 May 1978Fire Confirmation Testing of Cable Tray Penetration Seals in Concrete Walls Utilizing Silicone Elastomers. Prepared for Util
ML19329A9288 May 1978Initial Startup Rept.
ML19317F63430 September 1977Confirmatory Testing of Fire Retardant Seals for Electrical Penetrations Through Fire Barriers Installed at Facility.Fire Barrier
ML19329A90525 May 1977Fire Equivalency Test for Silicone Foam.Fire Barrier
ML19329A81030 March 1977Conduit Separation Test Program, Final Program
ML19329A98022 December 1976Containment Vessel Integrated Leak Rate Test.
ML19319B82416 December 1976Isolation Circuit Test Rept.
ML19329B18616 December 1976Reactor Protection Sys Noise Testing Summary.
ML19319B82516 December 1976Cleveland Illuminating Co East Lake Tests.
ML19319B82716 December 1976Lynchburg Research Ctr Tests.
ML19329C21415 December 1976ECCS Emergency Sump & Pump Suction Line Testing, Final Rept
ML19329C29914 December 1976Hose Stream Testing of Bisco SF-20 Silicone Foam,Bisco SF-150L High Density Silicone & Bisco Flexible Boot Penetration Seals.Fire Barrier
ML19329C20515 October 1976ECCS Emergency Sump Model Testing to Investigate Vortexing Potential, Interim Rept
ML19319B83021 January 1971Bailey Meter Co 880 Sys Count Rate Channel Noise Testing, 710104-21.