Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20138E619 | 17 January 1995 | ASTM E136-94 Behavior of Matls in Vertical Tube Furnace. W/Rept Summarizing Results of Preliminary Tests Under Project 82NK21937,dtd 830926 & Ltr Forwarding Test Results Re Caulking Matl | |
ML20209B511 | 22 April 1987 | Summary Rept for Davis-Besse Motor-Operated Valve Reliability Program | Stroke time Hydrostatic |
ML20212M817 | 26 August 1986 | Test of Integrated Control Sys at Davis-Besse Nuclear Power Station to Determine Integrated Control Sys Response When Power Lost & Subsequently Restored, on 860317 | |
ML20107B306 | 31 January 1985 | Rev 1 to Calculation M-8, Pressurizer Surge Line - Class 1 Piping Analysis | Earthquake |
ML20099H118 | 31 December 1984 | Reactor Containment Bldg Integrated Leak Rate Test | |
ML20128N836 | 30 September 1982 | Performance Test Program for Increased Blowdown on Crosby 4M16 HB-BP-86 Pressurizer Safety Valve | Hydrostatic |
ML20063E291 | 22 March 1982 | Environ Qualification Rept 3394-2,Anticipatory Reactor Trip Sys | |
ML20063E235 | 1 March 1982 | Seismic Qualification Rept 3394-1 Anticipatory Reactor Trip Sys | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake |
ML20063E273 | 11 February 1982 | Seismic Simulation Test Program on Anticipatory Reactor Trip Sys (Arts) | |
ML20039E680 | 18 December 1981 | Rept on 811209 Ottawa County/Toledo Edison Siren Test. | |
ML20010G862 | 9 June 1981 | B&W Post-Test Analysis for Semiscale Test S-07-10D. | Loop seal |
ML20004C087 | 20 May 1981 | Suppl to Post-Refueling Physics Testing,Davis-Besse Unit 1, Cycle 2 Power Escalation Testing. | Power change |
ML19350A429 | 5 March 1981 | Cycle 2 Startup Rept for Facility | |
ML20062J935 | 14 October 1980 | Analog & Digital Isolation Device Qualification, & Addendum a | |
ML19337B631 | 29 August 1980 | Primary Reactor Containment Integrated Leakage Rate Test Rept. | Scaffolding |
ML19260A203 | 5 October 1979 | Revised Pages to Initial Startup Rept, Suppl 6,covering 790706-1005 | |
ML19259C706 | 8 August 1979 | Revised Pages to Chapter 1 of Initial Startup Rept,As Revised by Suppl 5 for Period 79046-0705 | |
ML19319B826 | 26 May 1978 | Fire Confirmation Testing of Cable Tray Penetration Seals in Concrete Walls Utilizing Silicone Elastomers. Prepared for Util | |
ML19329A928 | 8 May 1978 | Initial Startup Rept. | |
ML19317F634 | 30 September 1977 | Confirmatory Testing of Fire Retardant Seals for Electrical Penetrations Through Fire Barriers Installed at Facility. | Fire Barrier |
ML19329A905 | 25 May 1977 | Fire Equivalency Test for Silicone Foam. | Fire Barrier |
ML19329A810 | 30 March 1977 | Conduit Separation Test Program, Final Program | |
ML19329A980 | 22 December 1976 | Containment Vessel Integrated Leak Rate Test. | |
ML19319B824 | 16 December 1976 | Isolation Circuit Test Rept. | |
ML19329B186 | 16 December 1976 | Reactor Protection Sys Noise Testing Summary. | |
ML19319B825 | 16 December 1976 | Cleveland Illuminating Co East Lake Tests. | |
ML19319B827 | 16 December 1976 | Lynchburg Research Ctr Tests. | |
ML19329C214 | 15 December 1976 | ECCS Emergency Sump & Pump Suction Line Testing, Final Rept | |
ML19329C299 | 14 December 1976 | Hose Stream Testing of Bisco SF-20 Silicone Foam,Bisco SF-150L High Density Silicone & Bisco Flexible Boot Penetration Seals. | Fire Barrier |
ML19329C205 | 15 October 1976 | ECCS Emergency Sump Model Testing to Investigate Vortexing Potential, Interim Rept | |
ML19319B830 | 21 January 1971 | Bailey Meter Co 880 Sys Count Rate Channel Noise Testing, 710104-21. |