Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18039A24015 January 1998Bfnp Unit 2 Cycle 10 Power Ascension Test Program Start-Up Rept, for Period 970929-1105Shutdown Margin
ML20210V11729 July 1997Qualification Plan & Rept MIL-STD-462D,CS114,Conducted Susceptibility,Bulk Cable Injection Numac Reactor Bldg Vents Radiation Monitor TVA Bfn,Units 1,2 & 3
ML18038B72625 June 1996Unit 2 Cycle 9 Final Refueling Test Rept.Shutdown Margin
Stroke time
ML20116C3703 June 1996Rev 1 to Test Rept for Fourier Transform
ML20100L41722 December 1995Final Refueling Test ReptShutdown Margin
Half scram
Hydrostatic
Test box
Scram Discharge Volume
ML18038B57513 December 1995Simulator Four Yr Test Rept.Fuel cladding
ML18038B12025 January 1995Reactor Containment ILRT Browns Ferry Nuclear Plant Unit 2 Conducted 941105-07, Test ReptReactor Vessel Water Level
ML18037A64010 December 1993Test Rept for Analysis of Main Control Mapping Data & Ge/ C&C Numac Lab EMI Test Data for Brown Ferry Nuclear Plant.
ML20062L92025 June 1993Test Rept for Analysis of EMI Main Control Room Mapping Data & GE Rbvprm EMI Testing Data for Brown Ferry Nuclear Plant
ML20062L92925 June 1993Test Rept for Point of Installation Electromagnetic Interference (EMI) Mapping of Control Rooms & Refuel Floor, Brown Ferry Station Units 1,2 & 3
ML18037A66217 February 1993Bend Radius Corona & Load Cycle Testing 4/0 AWG,Cu.,XLPE,5 Kv Cable.
ML20086C61430 October 1991Cycle 6 Final Power Ascension Test Rept,910220-0806Stroke time
Overtravel
ML20155B68322 September 1988Cable Issues Supplemental Rept Cable TestingCondition Adverse to Quality
FLEX
ML18032A71925 January 1988Secondary Containment Leak Rate Test Performed 871026.
ML20215K71811 September 1986Secondary Containment Leak Rate Test,Browns Ferry Nuclear Plant, 90 Day Rept
ML20147E32414 May 1986Vol I of Seismic Qualification/Verification of Various Aluminum Electrical Conduit ConfigurationsSafe Shutdown Earthquake
Earthquake
ML20147E58631 March 1986Preliminary Study of Vibration Damping in Electrical ConduitFire Barrier
ML20147E65331 March 1986Experimental Investigation of Vibration Damping in Aluminum Electrical Conduit, Interim Rept
ML20140F6257 June 1985Secondary Containment Leak Rate Test,Browns Ferry Nuclear Plant Unit 1
ML18025B99622 July 1983Recirculation Sys Testing.
ML18025B85218 March 1982Revision a to Qualification Test Rept for Model 1801104-05 PSA 1/4 Shock.
ML18025B47924 April 1981Proposed Tech Spec Sections 1.O & 1.P,clarifying Definition of Secondary Containment Integrity
ML18025A87720 May 1980Reactor Bldg Containment Integrated Leak Rate Test, Conducted 800220-23Reactor Vessel Water Level
ML18025B86712 May 1980Qualification Test Rept for Model 1801119-11 PSA-100 Shock Arrestor.
ML18025B85618 March 1980Revision a to Qualification Test Rept for Model 1801102-05 PSA 1 Shock Arrestor.
ML18024B35221 February 1980Reactor Bldg Containment Integrated Leak Rate Test for Facility,Conducted 791121-25.
ML18025B8627 February 1980Revision a to Qualification Test Rept for Model 1801112-11 PSA-35 Shock Arrestor.
ML18025B86025 January 1980Qualification Test Rept for Model 1801103-07 PSA 10 Shock Arrestor.
ML18025B85822 January 1980Qualification Test Rept for Model 1801106-05 PSA-3 Shock Arrestor.
ML18025B85512 December 1979Qualification Test Rept for Model 1801104-07 PSA 1/2 Shock Arrestor.
ML19207C3944 September 1979Summary Rept of Refueling Test Program,Cycle 3,conducted During Spring 1979 OutageShutdown Margin
ML18024B01322 August 1979Secondary Containment Leak Rate Test.
ML19270G93211 May 1979Secondary Containment Leak Rate Test,90-Day Rept.
ML19274D5529 February 1979Results & Analysis of 781127 Secondary Containment Leak Rate Test.Shows Secondary Containment Capability to Main 1/4 Inch Water Vacuum Under Calm Wind W/Sys in Leakage Rate of Not More That 12,000 Scfm Before Refueling
ML20064E2387 November 1978Reactor Bldg Containment Integrated Leak Rate Test on 780613-15.Outlines Objectives,Principal Events & Special Equip Used in the Cilrt.Concludes That Accurate Results Can Be Obtained While Significantly Reducing Test Time
ML19261C1989 September 1978Secondary Containment Leak Rate Test Conducted 780909 for 90-day Period.Concludes Secondary Containment Sys Is Capable of Maintaining Greater than 0.25 Inch of Water Vacuum
ML20050C97112 April 1978Qualification Test Rept on Eight Cable Splice Assemblies to Be Used at Browns Ferry Unit 3, Vol 1 of 1
ML20104A47420 March 1978Secondary Containment Leak Rate Test Conducted 780320 for 90-day Period.Concludes Secondary Containment Sys Is Capable of Maintaining Greater than 0.25 Inch of Water Vacuum