Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23263A97722 December 2023Exemption from Certain Emergency Planning Requirements and Related Safety EvaluationUltimate heat sink
Probabilistic Risk Assessment
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Exemption Request
Earthquake
Control of Heavy Loads
Fuel cladding
Accidental discharge
Grace period
Fatality
Seismic Walkdown Report
ML23117A2171 May 2023Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment
ML22039A19813 May 2022Issuance of Amendment No. 272 Permanently Defueled Technical SpecificationsTime of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Cyber Security
Abnormal operational transient
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Accidental discharge
Fire Protection Program
ML21292A14813 December 2021Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00Exemption Request
Coronavirus
COVID-19
Fire Protection Program
ML21292A14713 December 2021Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2)Cyber Security
Fire Protection Program
ML20365A00119 January 2021Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration NozzlesDissimilar Metal Weld
ML20226A27218 August 2020Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XIIncorporated by reference
ML19317D85530 December 2019Issuance of Amendment No. 271 Regarding Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5BShutdown Margin
High Radiation Area
Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
Backfit
Power change
ML19318E3942 December 2019Reactor Vessel Material Surveillance Capsule Withdrawal Schedule
ML19254A60319 September 2019Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1
ML19175A04211 September 2019Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application RulesTime of Discovery
Fire Protection Program
ML19198A08020 August 2019Issuance of Amendments No. 269 Regarding Changes to NFPA 805 Modifications and Change to Full Compliance Implementation Date for the Fire Protection Program (Epids L-2018-LLA-0296 and L-2019-LLA-0049)Mission time
Fire Barrier
Probabilistic Risk Assessment
Fire Protection Program
ML19135A05021 May 2019Correction to Safety Evaluation for Amendment No.268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement
ML19107A05313 May 2019Issuance of Amendment No. 268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance RequirementSafe Shutdown
Anticipated operational occurrence
Fire Protection Program
ML19112A31726 April 2019Approval of Alternative for Repair of Reactor Pressure Vessel Head PenetrationsNondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML18170A21924 September 2018Issuance of Amendment Changes to the Emergency Plan for Permanently Defueled Condition (CAC No. MG0198; EPID L-2017-LLA-0305)Abnormal operational transient
Severe Accident Management Guideline
Minimum staff
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
ML18114A4104 June 2018Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition (CAC No. MG0021; EPID L-2017-LLA-0266)Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Process Control Program
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
ML18135A26321 May 2018Relief Request No. RR 5-6 Alternate to the Reexamination Frequency for a Relevant ConditionBoric Acid
Incorporated by reference
Foreign Material Exclusion
Fuel cladding
ML18039A24427 February 2018Issuance of Amendment License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required ModificationsSafe Shutdown
Probabilistic Risk Assessment
Fire Protection Program
ML17328B03315 December 2017Issuance of Amendment Cyber Security Plan Implementation Schedule (CAC No. MF9523; EPID L-2017-LLA-0199)Enforcement Discretion
Cyber Security
ML21067A4987 September 2017Relief Request No. RR 5-4 Proposed Alternative, Weld Reference SystemIncorporated by reference
Scaffolding
ML17151A35021 August 2017Approval of Certified Fuel Handler Training and Retraining ProgramHigh Radiation Area
Job Performance Measure
Backfit
ML17194A80714 August 2017Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML17137A02829 June 2017Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage ExaminationNondestructive Examination
VT-2
ML17121A5108 June 2017Issuance of Amendment License Amendment Request for Editorial and Administrative Changes to Technical SpecificationsFire Protection Program
ML17082A46530 May 2017Issuance of Amendment Application to Revise Technical Specifications to Adopt TSTF 545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 TestingIncorporated by reference
Missed surveillance
Pressure Boundary Leakage
Fire Protection Program
ML16300A03019 December 2016Issuance of Amendment Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet RegionBoric Acid
Post Accident Monitoring
Nondestructive Examination
Process Control Program
Fire Protection Program
ML16281A49828 October 2016Issuance of Amendment No. 260, Revise License Condition 2.C.(4) and Technical Specifications Related to Control Rod Drive Exercise SurveillanceSafe Shutdown
Missed surveillance
Fire Protection Program
ML16251A62013 September 2016Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097)
ML16014A31822 August 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
Finite Element Analysis
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Frazil ice
B.5.b Mitigating Strategies
Earthquake
Fire Protection Program
Coast down
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Liquid penetrant
ML16093A02831 May 2016Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1Liquid penetrant
ML16078A0682 May 2016Issuance of Amendment Cyber Security Plan Implementation ScheduleCyber Security
ML16043A48514 March 2016Relief Request Number RR 4-24 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline ExaminationIncorporated by reference
Finite Element Analysis
Dissimilar Metal Weld
ML16022A1071 February 2016Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing RequirementNondestructive Examination
Dissimilar Metal Weld
ML15334A30722 December 2015Relief Request Numbers RR 5-2 and 5-3, Proposed Alternative to the Requirements of the ASME OM Code for the Fifth 10-Year Inservice Test IntervalStroke time
Temporary Modification
Power-Operated Valves
Grace period
ML15320A24425 November 2015Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related ActivitiesIncorporated by reference
ML15103A05918 May 2015Issuance of Amendment Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiatives 6B and 6C.Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
ML15055A10622 April 2015Issuance of Amendment License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times
ML15007A19127 February 2015Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c)Hot Short
Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Coatings
Fire impairment
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
B.5.b
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
Cable Tray Ignition
Continuous fire watch
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
Exclusive Use
ML14237A1448 December 2014Issuance of Amendment Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML14283A28722 October 2014Issuance of Amendment Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement ProcessTime of Discovery
High winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
Fire Protection Program
ML14223B2264 September 2014Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline ExaminationFinite Element Analysis
Dissimilar Metal Weld
ML14199A55713 August 2014Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML14210A2668 August 2014Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 &
ML13312A42326 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
ML13129A21929 May 2013Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentHigh winds
FLEX
Fukushima Dai-Ichi
ML13025A30614 March 2013ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical SpecificationsSafeguards Contingency Plan
ML13056A51428 February 2013Non-Proprietary Issuance of Amendment Regarding Replacement of Spent Fuel Pool Region 1 Storage Racks