ML24012A19612 January 2024Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and
ML23111A21321 April 2023Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement ActivitiesIncorporated by reference
W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-50513 October 2022Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505Safe Shutdown
W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-50519 August 2022Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505Internal Flooding
Probabilistic Risk Assessment
Cyber Security
W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.16 May 2022Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.Hot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Generated Missile
Tornado Missile Protection
Thermoset
Surveillance Frequency Control Program
Large early release frequency
Turbine Missile
Offsite Circuit
Fire Protection Program
Fire Watch
Power change
W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors25 April 2022Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power ReactorsHot Short
Safe Shutdown
Ultimate heat sink
Mission time
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Thermoset
Surveillance Frequency Control Program
Large early release frequency
Fire Protection Program
Fire Watch
W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt1 October 2021Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to AdoptSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Tornado Missile Protection
Large early release frequency
TORMIS
Earthquake
Generic Issues Program
W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual30 September 2021Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual
W3F1-2021-0041, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System2 June 2021Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator SystemCyber Security
CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L28 January 2021Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L
W3F1-2020-0062, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 615 December 2020Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Severe Accident Management Guideline
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
W3F1-2020-0043, Response to NRC Request for Additional Information Regarding License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual6 July 2020Response to NRC Request for Additional Information Regarding License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual
W3F1-2020-0033, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.8.1, A.C. Sources Operating29 May 2020(Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.8.1, A.C. Sources OperatingStroke time
CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary30 December 2019Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary
W3F1-2019-0056, Revision to Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-131 July 2019Revision to Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1Boric Acid
Weld Overlay
Probabilistic Risk Assessment
Operating Basis Earthquake
VT-2
Surveillance Frequency Control Program
Liquid penetrant
Through-Wall Leak
W3F1-2019-0054, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-122 July 2019Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1Boric Acid
Weld Overlay
Probabilistic Risk Assessment
Operating Basis Earthquake
VT-2
Surveillance Frequency Control Program
Liquid penetrant
Through-Wall Leak
W3F1-2019-0040, Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side11 July 2019Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Intern
W3F1-2019-0039, (Waterford 3) - Response to Request for Additional Information Regarding Relief Request W3-ISI-0328 July 2019(Waterford 3) - Response to Request for Additional Information Regarding Relief Request W3-ISI-032Large early release frequency
DM weld
W3F1-2019-0005, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update15 February 2019Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis UpdateUltimate heat sink
W3F1-2019-0011, Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Request WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay4 February 2019Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding Relief Request WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld OverlayWeld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
W3F1-2019-0002, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across19 January 2019(Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops AcrossFinite Element Analysis
Earthquake
W3F1-2018-0067, Response to NRC Request for Alternative to ASME Code Case N-770-2, Successive Examinations, Relief Request W3-ISI-03119 November 2018Response to NRC Request for Alternative to ASME Code Case N-770-2, Successive Examinations, Relief Request W3-ISI-031Dissimilar Metal Weld
W3F1-2018-0059, (Waterford 3) - Response to NRC Request for Additional Information Regarding License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position ...18 October 2018(Waterford 3) - Response to NRC Request for Additional Information Regarding License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position ...
CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station30 May 2018Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station
W3F1-2018-0020, Responses to Request for Additional Information Set 18 Regarding the License Renewal Application23 April 2018Responses to Request for Additional Information Set 18 Regarding the License Renewal Application
ML18101A09610 April 2018Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2018007) and Request for InformationSafe Shutdown
Fitness for Duty
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Job Performance Measure
Thermoset
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Maintenance Rule Program
Fire Protection Program
Fire Watch
W3F1-2017-0039, Responses to Request for Additional Information Set 17 Regarding the License Renewal Application12 May 2017Responses to Request for Additional Information Set 17 Regarding the License Renewal ApplicationFinite Element Analysis
W3F1-2017-0027, Responses to Request for Additional Information Set 16 Regarding the License Renewal Application2 May 2017Responses to Request for Additional Information Set 16 Regarding the License Renewal ApplicationUltimate heat sink
Aging Management
ML17114A43221 April 2017Responses to Request for Additional Information for the Environmental Review (SAMA Round 2) Regarding the License Renewal ApplicationInternal Flooding
W3F1-2017-0026, Responses to Request for Additional Information Set 15 Regarding the License Renewal Application11 April 2017Responses to Request for Additional Information Set 15 Regarding the License Renewal ApplicationBoric Acid
Coatings
Aging Management
W3F1-2017-0023, Responses to Request for Additional Information Set 14 Regarding the License Renewal Application30 March 2017Responses to Request for Additional Information Set 14 Regarding the License Renewal Application
W3F1-2017-0015, Responses to Request for Additional Information Set 13 Regarding the License Renewal Application16 March 2017Responses to Request for Additional Information Set 13 Regarding the License Renewal ApplicationBoric Acid
Aging Management
Foreign Material Exclusion
W3F1-2017-0018, Supplement to Response to RAI on License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System Subgroup Relays to Surveillance.27 February 2017Supplement to Response to RAI on License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System Subgroup Relays to Surveillance.Surveillance Frequency Control Program
ML17054D23923 February 2017Responses to Request for Additional Information Set 12 Regarding the License Renewal ApplicationBoric Acid
Coatings
Aging Management
Biofouling
ML17024A2397 February 2017Alternatives RAI-AL-3 Lanning 2014_Correspondence Lanning-Entergy to Buckley-Entergy
ML17037D0177 February 2017Aquatic Resources (AR) RAI-7 Lpl 1979_WF3 Demonstration Under Section 316(b)
ML17038A2647 February 2017Surface Water Resources (Sw)Rai SW-11 Usace NNOD-SP (Mississippi River) 796 Permit
ML17034A3237 February 2017Aquatic Resources (AR)- RAI AR-7 Ensr 2005_W1&2 PICZebra Mussel
Biofouling
ML17038A2777 February 2017Surface Water Resources (SW) RAI SW-11 Ldwf Letter of No Objection
ML17030A1877 February 2017Aquatic RESOURCES-RAI AR-6 LPDES Permit Modification_2008
ML17023A2687 February 2017Air Quality RAI AQ-5 WF3 2004a_WF3 Air Permit 2520-00091-00
ML17037D0367 February 2017Cumultive Impacts (Cu) RAI CU-1 Reasonably Foreseeable Future Projects within WF3 Area
ML17037D0557 February 2017Groundwater Resources (Gw) RAI GW-1 WF3 Groundwater Monitoring Program_Five-Year Review
ML17038A4367 February 2017Responses to Request for Additional Information for the Environmental ReviewLoop seal
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
ML17024A1707 February 2017Alternatives RAI AL-1 Power Replacement Suitable Sites
ML17018A1867 February 2017Air Quality- RAI AQ-2 Temperature Analysis Mississippi River
ML17037D2827 February 2017Surface Water Resources (Sw)Rai SW-1 WF3 Surface Water Withdrawals_Discharges_2011-2015
ML17024A1937 February 2017Alternatives RAI AL-3 - Enercon 2015b_Calc Supporting Section 07_01 AlternativesLicense Renewal
ML17024A2477 February 2017Aquatic Resources RAI AR-4 -Entergy 2005_WF3 316(b) Proposal for Information CollectionZebra Mussel
Biofouling
ML17038A2807 February 2017Surface Water Resources (SW) RAI SW-11 U.S. Coast Guard Permit CG-2554.pdf