Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-065428 November 2023Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654,Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Incorporated by reference
FLEX
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Overexposure
L-2023-162, Response to 50.69 2nd Round of Rals21 November 2023Response to 50.69 2nd Round of RalsProbabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors11 September 2023Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
B.5.b
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 27 August 2023and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2Health Physics Network
Cyber Security
FLEX
B.5.b
Severe Accident Management Guideline
Minimum staff
Siren
L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response21 April 2023Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental ResponseCoatings
Aging Management
License Renewal
Subsequent License Renewal
L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 427 March 2023Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4Coatings
Aging Management
License Renewal
Subsequent License Renewal
ML23013A20313 January 2023RAI Set 4 Draft ResponseAging Management
L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response26 October 2022Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue ResponseOperating Basis Earthquake
Aging Management
License Renewal
Earthquake
L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response19 September 2022Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a ResponseAging Management
L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response8 September 2022Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A ResponseBoric Acid
Coatings
Aging Management
L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment9 August 2022Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 AttachmentBoric Acid
Ultimate heat sink
Nondestructive Examination
Aging Management
Foreign Material Exclusion
License Renewal
Subsequent License Renewal
Power Uprate
Measurement Uncertainty Recapture
L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response11 July 2022Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 ResponseBoric Acid
Ultimate heat sink
Fire Barrier
Weld Overlay
Coatings
Finite Element Analysis
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
EVT-1
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response13 June 2022Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 ResponseWeld Overlay
Aging Management
Subsequent License Renewal
L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response19 January 2022License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) ResponseShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Qualified Offsite Circuit
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
Power change
Power Uprate
L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements12 May 2021Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements
L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years1 April 2021Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years
L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-024 December 2020Supplement to Updated Final Response to NRC Generic Letter 2004-02
L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements26 June 2020Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements
L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements30 April 2020Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements
ML20015A02814 January 2020NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation
L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control11 September 2019Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control
L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response21 August 2019Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response
L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG25 July 2019Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDGSafe Shutdown
Hydrostatic
Multiple Spurious Operation
FLEX
Offsite Circuit
Continuous fire watch
Early Warning Fire Detection
L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG24 July 2019Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDGSafe Shutdown
Hydrostatic
Multiple Spurious Operation
FLEX
Surveillance Frequency Control Program
Offsite Circuit
Continuous fire watch
Early Warning Fire Detection
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation28 June 2019Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power OperationSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
L-2019-107, License Amendment Request - Iodine Removal System Elimination17 May 2019License Amendment Request - Iodine Removal System EliminationBoric Acid
L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request7 March 2019Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request
L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies15 November 2018Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element AssembliesShutdown Margin
Anticipated operational occurrence
Power change
L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies17 August 2018Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies
L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.24 May 2018Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.Aging Management
L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations3 April 2018Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 197729 March 2018Attachment a to L-77-291 Response to NRC Questions of May 24, 1977Safe Shutdown
L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply14 February 2018Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam SupplySurveillance Frequency Control Program
Power change
L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b1 February 2018Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fire Protection Program
Very Early Warning Fire Detection
L-2017-210, Updated Final Response to NRC Generic Letter 2004-0220 December 2017Updated Final Response to NRC Generic Letter 2004-02Boric Acid
Mission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 619 December 2017License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6Aging Management
EVT-1
L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-0130 November 2017Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01
L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 013 September 2017Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0
L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.53 July 2017Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5
L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change5 December 2016License Amendment Request EDG Day Tank Fuel Volume Change
L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)3 November 2016Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes11 August 2016Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes
L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B22 July 2016Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4BMission time
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents15 July 2016Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled DocumentsSurveillance Frequency Control Program
L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48.8 July 2016Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48.Probabilistic Risk Assessment
Surveillance Frequency Control Program
L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes6 May 2016RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming ChangesGOTHIC
L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle6 May 2016RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle
L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 021 April 2016Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0VT-2
Pressure Boundary Leakage
L-2016-084, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States.20 April 2016Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States.Safe Shutdown
Shutdown Margin
L-2016-040, License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional Information26 February 2016License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional InformationAging Management