L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-162, Response to 50.69 2nd Round of Rals | 21 November 2023 | Response to 50.69 2nd Round of Rals | Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi |
L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 11 September 2023 | Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX B.5.b |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response | 21 April 2023 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response | Coatings Aging Management License Renewal Subsequent License Renewal |
L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 | 27 March 2023 | Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 | Coatings Aging Management License Renewal Subsequent License Renewal |
ML23013A203 | 13 January 2023 | RAI Set 4 Draft Response | Aging Management |
L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response | 26 October 2022 | Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response | Operating Basis Earthquake Aging Management License Renewal Earthquake |
L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response | 19 September 2022 | Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response | Aging Management |
L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response | 8 September 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response | Boric Acid Coatings Aging Management |
L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment | 9 August 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment | Boric Acid Ultimate heat sink Nondestructive Examination Aging Management Foreign Material Exclusion License Renewal Subsequent License Renewal Power Uprate Measurement Uncertainty Recapture |
L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response | 11 July 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response | Boric Acid Ultimate heat sink Fire Barrier Weld Overlay Coatings Finite Element Analysis Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal EVT-1 Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Power Uprate |
L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response | 13 June 2022 | Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response | Weld Overlay Aging Management Subsequent License Renewal |
L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response | 19 January 2022 | License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power change Power Uprate |
L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements | 12 May 2021 | Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements | |
L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years | 1 April 2021 | Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years | |
L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-02 | 4 December 2020 | Supplement to Updated Final Response to NRC Generic Letter 2004-02 | |
L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | 26 June 2020 | Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | |
L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | 30 April 2020 | Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | |
ML20015A028 | 14 January 2020 | NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation | |
L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control | 11 September 2019 | Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control | |
L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response | 21 August 2019 | Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response | |
L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | 25 July 2019 | Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | Safe Shutdown Hydrostatic Multiple Spurious Operation FLEX Offsite Circuit Continuous fire watch Early Warning Fire Detection |
L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | 24 July 2019 | Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | Safe Shutdown Hydrostatic Multiple Spurious Operation FLEX Surveillance Frequency Control Program Offsite Circuit Continuous fire watch Early Warning Fire Detection |
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | 28 June 2019 | Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program |
L-2019-107, License Amendment Request - Iodine Removal System Elimination | 17 May 2019 | License Amendment Request - Iodine Removal System Elimination | Boric Acid |
L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request | 7 March 2019 | Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request | |
L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies | 15 November 2018 | Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies | Shutdown Margin Anticipated operational occurrence Power change |
L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies | 17 August 2018 | Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies | |
L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. | 24 May 2018 | Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. | Aging Management |
L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations | 3 April 2018 | Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations | Decommissioning Funding Plan Authorized possession limits |
L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 | 29 March 2018 | Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 | Safe Shutdown |
L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply | 14 February 2018 | Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply | Surveillance Frequency Control Program Power change |
L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b | 1 February 2018 | Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Very Early Warning Fire Detection |
L-2017-210, Updated Final Response to NRC Generic Letter 2004-02 | 20 December 2017 | Updated Final Response to NRC Generic Letter 2004-02 | Boric Acid Mission time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Foreign Material Exclusion Exemption Request Earthquake Fuel cladding |
L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 | 19 December 2017 | License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 | Aging Management EVT-1 |
L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 | 30 November 2017 | Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 | |
L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 | 13 September 2017 | Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 | |
L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 | 3 July 2017 | Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 | |
L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change | 5 December 2016 | License Amendment Request EDG Day Tank Fuel Volume Change | |
L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) | 3 November 2016 | Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) | |
L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes | 11 August 2016 | Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes | |
L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | 22 July 2016 | Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Mission time Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents | 15 July 2016 | Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents | Surveillance Frequency Control Program |
L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. | 8 July 2016 | Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. | Probabilistic Risk Assessment Surveillance Frequency Control Program |
L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes | 6 May 2016 | RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes | GOTHIC |
L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle | 6 May 2016 | RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle | |
L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 | 21 April 2016 | Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 | VT-2 Pressure Boundary Leakage |
L-2016-084, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. | 20 April 2016 | Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. | Safe Shutdown Shutdown Margin |
L-2016-040, License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional Information | 26 February 2016 | License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional Information | Aging Management |