Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24024A13724 January 2024NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance
ML24018A00118 January 2024Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for InformationCommercial Grade Dedication
ML23264A79921 September 2023NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1
ML23205A24319 July 2023NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186)
ML23164A03213 June 2023Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010Temporary Modification
Operability Determination
ML23087A29128 March 2023Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM WeldNon-Destructive Examination
Weld Overlay
Dissimilar Metal Weld
DM weld
ML23061A0522 March 2023Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the TorusWeld Overlay
ML23012A20013 January 2023Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2023401 and 05000410/2023401Cyber Security
ML22321A01017 November 2022Notification of Conduct of a Fire Protection Team InspectionSafe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Aging Management
Fire Protection Program
ML22207A21626 July 2022Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000220/2022010 and 05000410/2022010Squib
Power-Operated Valves
Weak link
ML22194A94113 July 2022Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail)
ML22124A2674 May 2022Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505High winds
Probabilistic Risk Assessment
Open Phase Condition
Large early release frequency
ML22041B53610 February 2022NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541
ML22020A06413 January 2022NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration NozzlesNondestructive Examination
ML21320A34716 November 2021Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0Water Inventory Control
ML21306A3312 November 2021Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail)
ML21256A19010 September 2021NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application
ML21187A0526 July 2021Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6
ML21144A21324 May 2021NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application
ML21117A0345 May 2021Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893Boric Acid
ML21125A1284 May 2021OPC Document Request - Feb 2021Open Phase Condition
Time Critical Operator Action
ML21110A51120 April 2021Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582Water Inventory Control
ML21088A26830 March 2021Notification of Conduct of a Fire Protection Team InspectionSafe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Pandemic
Fire Protection Program
ML21062A0651 March 2021NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining BoltingIncorporated by reference
ML21049A25718 February 2021Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237)
ML21041A19310 February 2021Request for Information for a Triennial Baseline Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Inspection; Inspection Report (05000333/2021011)Probabilistic Risk Assessment
Squib
Power-Operated Valves
Weak link
ML20365A00930 December 2020Request for Additional Information Concerning Review of License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114)Maintenance Rule Program
ML20358A26028 December 2020Changes to Draft Request for Additional Information Regarding License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing FrequencyMaintenance Rule Program
ML20272A28028 September 2020Withdrawal and Replacement of Request for Additional Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion TimesMaintenance Rule Program
ML20248H51928 September 2020Changes to Draft Request for Additional Information Regarding Request to Revise Technical Specifications to Adopt Risk-Informed Completion TimesHot Short
High winds
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
FLEX
Large early release frequency
Frazil ice
Maintenance Rule Program
ML20246G6362 September 2020Request for Additonal Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion TimesHot Short
High winds
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
FLEX
Large early release frequency
Frazil ice
NMP2L2739, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 228 August 2020Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2Safe Shutdown
Offsite Circuit
ML20239A79825 August 2020NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2
ML20213A93530 July 2020Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion TimesOffsite Circuit
ML20212L87030 July 2020Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290)Internal Flooding
Probabilistic Risk Assessment
ML20153A7041 June 2020NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26Incorporated by reference
ML20135H19714 May 2020NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval
ML20066L3685 March 2020Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment
ML20056E79925 February 2020Request for Additional Information for LAR on Primary Containment Hydrodynamic LoadsMELLLA
ML20045E35814 February 2020Draft Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage RatesSafe Shutdown Earthquake
ML20035D5763 February 2020Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence
ML20027A01123 January 2020Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation
ML19353A94519 December 2019Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences
ML19322A00615 November 2019NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly ValvesIncorporated by reference
ML19296A18623 October 2019Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates (L-2019-LLA-0115)
ML19280A0375 October 2019NRR E-mail Capture - FitzPatrick Revised Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days
ML19280A0395 October 2019NRR E-mail Capture - FitzPatrick Additional Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days
ML19280A0364 October 2019NRR E-mail Capture - FitzPatrick Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 DaysGrace period
ML19275H1362 October 2019NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879
ML19179A06119 July 2019Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879