Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24024A137 | 24 January 2024 | NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance | |
ML24018A001 | 18 January 2024 | Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information | Commercial Grade Dedication |
ML23264A799 | 21 September 2023 | NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 | |
ML23205A243 | 19 July 2023 | NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) | |
ML23164A032 | 13 June 2023 | Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 | Temporary Modification Operability Determination |
ML23087A291 | 28 March 2023 | Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld | Non-Destructive Examination Weld Overlay Dissimilar Metal Weld DM weld |
ML23061A052 | 2 March 2023 | Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus | Weld Overlay |
ML23012A200 | 13 January 2023 | Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2023401 and 05000410/2023401 | Cyber Security |
ML22321A010 | 17 November 2022 | Notification of Conduct of a Fire Protection Team Inspection | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management Fire Protection Program |
ML22207A216 | 26 July 2022 | Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000220/2022010 and 05000410/2022010 | Squib Power-Operated Valves Weak link |
ML22194A941 | 13 July 2022 | Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) | |
ML22124A267 | 4 May 2022 | Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 | High winds Probabilistic Risk Assessment Open Phase Condition Large early release frequency |
ML22041B536 | 10 February 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 | |
ML22020A064 | 13 January 2022 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles | Nondestructive Examination |
ML21320A347 | 16 November 2021 | Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 | Water Inventory Control |
ML21306A331 | 2 November 2021 | Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) | |
ML21256A190 | 10 September 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application | |
ML21187A052 | 6 July 2021 | Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 | |
ML21144A213 | 24 May 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application | |
ML21117A034 | 5 May 2021 | Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 | Boric Acid |
ML21125A128 | 4 May 2021 | OPC Document Request - Feb 2021 | Open Phase Condition Time Critical Operator Action |
ML21110A511 | 20 April 2021 | Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582 | Water Inventory Control |
ML21088A268 | 30 March 2021 | Notification of Conduct of a Fire Protection Team Inspection | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Pandemic Fire Protection Program |
ML21062A065 | 1 March 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting | Incorporated by reference |
ML21049A257 | 18 February 2021 | Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) | |
ML21041A193 | 10 February 2021 | Request for Information for a Triennial Baseline Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Inspection; Inspection Report (05000333/2021011) | Probabilistic Risk Assessment Squib Power-Operated Valves Weak link |
ML20365A009 | 30 December 2020 | Request for Additional Information Concerning Review of License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) | Maintenance Rule Program |
ML20358A260 | 28 December 2020 | Changes to Draft Request for Additional Information Regarding License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency | Maintenance Rule Program |
ML20272A280 | 28 September 2020 | Withdrawal and Replacement of Request for Additional Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times | Maintenance Rule Program |
ML20248H519 | 28 September 2020 | Changes to Draft Request for Additional Information Regarding Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times | Hot Short High winds Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment Zebra Mussel FLEX Large early release frequency Frazil ice Maintenance Rule Program |
ML20246G636 | 2 September 2020 | Request for Additonal Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times | Hot Short High winds Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment Zebra Mussel FLEX Large early release frequency Frazil ice |
NMP2L2739, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 | 28 August 2020 | Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 | Safe Shutdown Offsite Circuit |
ML20239A798 | 25 August 2020 | NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 | |
ML20213A935 | 30 July 2020 | Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times | Offsite Circuit |
ML20212L870 | 30 July 2020 | Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) | Internal Flooding Probabilistic Risk Assessment |
ML20153A704 | 1 June 2020 | NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 | Incorporated by reference |
ML20135H197 | 14 May 2020 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval | |
ML20066L368 | 5 March 2020 | Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment | |
ML20056E799 | 25 February 2020 | Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads | MELLLA |
ML20045E358 | 14 February 2020 | Draft Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates | Safe Shutdown Earthquake |
ML20035D576 | 3 February 2020 | Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence | |
ML20027A011 | 23 January 2020 | Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | |
ML19353A945 | 19 December 2019 | Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences | |
ML19322A006 | 15 November 2019 | NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves | Incorporated by reference |
ML19296A186 | 23 October 2019 | Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates (L-2019-LLA-0115) | |
ML19280A037 | 5 October 2019 | NRR E-mail Capture - FitzPatrick Revised Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days | |
ML19280A039 | 5 October 2019 | NRR E-mail Capture - FitzPatrick Additional Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days | |
ML19280A036 | 4 October 2019 | NRR E-mail Capture - FitzPatrick Request for Additional Information: Emergency Amendment to Extend Completion Time of Transformer to 21 Days | Grace period |
ML19275H136 | 2 October 2019 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 | |
ML19179A061 | 19 July 2019 | Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 |