Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23284A42511 October 202310 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection ReportShutdown Margin
Anticipated operational occurrence
Temporary Modification
Incorporated by reference
FLEX
Fuel cladding
ML23156A24128 September 202310 CFR Part 63- 60-day Supporting Statement 2023
ML23192A44731 July 2023Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML21246A28029 September 2021Final Ea/Fonsi for Tva'S Initial and Updated Triennial Decommissioning Funding Plans for Sequoyah Nuclear Plant ISFSIsDecommissioning Funding Plan
Authorized possession limits
IR 05000327/202100518 August 2021Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005Cyber Security
Exemption Request
Power-Operated Valves
Coronavirus
CNL-21-072, TVA Nuclear Calculation Coversheet/ Ecm Metadata Update13 August 2021TVA Nuclear Calculation Coversheet/ Ecm Metadata Update
ML21140A02814 May 2021Gravel Lot Restoration Project, Construction General Permit, Notice of Intent
CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User16 December 202010 CFR 71.95 Report for 3-60B Casks User
ML20350B72015 December 2020Discharge Monitoring Report Quality Assurance Study 40 Final Report 2020
ML20308A4762 November 202010 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary ReportBoric Acid
Shutdown Margin
Stroke time
Anticipated operational occurrence
Anchor Darling
Temporary Modification
Weak link
Overspeed trip
ML20304A40328 October 2020Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements ManualUnanalyzed Condition
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Functionality Assessment
Incorporated by reference
Pressure and Temperature Limits Report
Design basis earthquake
Earthquake
Maintenance Rule Program
ML19156A2615 June 201910 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary ReportSafe Shutdown
Boric Acid
Operator Manual Action
Temporary Modification
FLEX
ML18352A22917 December 2018Pressure Temperature Limits Report, Revision 7Hydrostatic
ML18340A03030 November 2018Tennessee Valley Authority - Sequoyah, Study to Confirm Calibration of Numerical Model
ML18136A49515 May 2018Pressure Temperature Limits Report, Revision 6Hydrostatic
ML18061A0362 March 2018IAEA Report of the Operational Safety Review Team (Osart) Mission to the Sequoyah Nuclear Power PlantBoric Acid
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Probabilistic Risk Assessment
Locked High Radiation Area
FLEX
Aging Management
Foreign Material Exclusion
Severe Accident Management Guideline
Earthquake
Scaffolding
ML17278A7595 October 2017Soarca Sequoyah Updated Draft Executive SummaryEarthquake
ML15336A94026 November 2015Submittal of 10 CFR 50.46 Combined Annual and 30-Day Report
ML15321A45413 November 2015Submittal of 10 CFR 71.95 Report on the 8-120B Cask
CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report31 July 2015the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure ReportCommercial Grade Dedication
CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information8 July 20153, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information
ML15156A38928 April 2015LTR-SGMP-15-25 Np, Response to NRC Request for Additional Information on the Design Features of the Sequoyah, Unit 2, Replacement Steam Generators.
ML14325A06917 November 2014CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary ReportSafe Shutdown
Stroke time
Temporary Modification
Power change
ML14283A51317 November 2014NRC Staff Review Documentation Provided by TVA for the Sequoyah Nuclear Plant, Units 1 and 2 Concerning Resolution of GL2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurizer-WateReactor Vessel Water Level
Mission time
Coatings
Finite Element Analysis
Earthquake
Fuel cladding
ML14259A33812 September 2014Plant(Sqn) - NPDES Permit No. TN0026450 - Discharge Monitoring Report(Dmr) for August 2014
CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant28 August 2014Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear PlantSpent Fuel Pool Instrumentation
CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc31 March 2014Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidSafe Shutdown
Boric Acid
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Earthquake
Seismic Walkdown Report
CNL-14-033, Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events5 March 2014Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsBoric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Severe Accident Management Guideline
Earthquake
ML14063A5424 March 2014TVA Response to Request for Clarification to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, LRA B.1.31, B.1.25.1 B, B.1.34-Sa, B.1.34-9a, LRA Annual ...
ML14002A11319 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML14041A19216 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Sequoyah Nuclear Plant, Units 1 and 2, TAC Nos.: MF0864 and MF0865Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML14016A0396 February 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
CNL-14-013, Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding...31 January 2014Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding...Safe Shutdown
Unanalyzed Condition
Fukushima Dai-Ichi
Earthquake
Scaffolding
CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report18 November 201310 CFR 50.46 - Combined Annual and 30-Day Report
ML13298A03122 October 2013SQN Femp Energy and Ghg Reporting Tool: Results Summary Fy 2008 - Fy 2012 Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.9 (7 Pages)
ML13294A43026 September 2013Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report, Revision 1Safe Shutdown
Unanalyzed Condition
Boric Acid
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Large early release frequency
Earthquake
Maintenance Rule Program
Scaffolding
ML13282A23326 September 2013Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response ReportSafe Shutdown
Unanalyzed Condition
Boric Acid
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Large early release frequency
Earthquake
Maintenance Rule Program
Scaffolding
ML13206A00424 June 2013Methodology for Evaluating the Potential for Multiple Dam Failures Due to Seismic EventsHydrostatic
Probabilistic Risk Assessment
Earthquake
ML13144A57622 May 2013Watt Bar, Units 1 & 2, Report of Drug Testing Error in Accordance with 10 CFR 26.719(c)(1)
ML13142A19816 May 2013Path Forward for Resolution of Generic Safety Issue (GSI)-191Coatings
Temporary Modification
ML13080A07312 March 2013Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation..Fukushima Dai-Ichi
Earthquake
ML13072A5805 March 2013Storm Water Pollution Prevention Plan
ML13032A25310 January 2013WCAP-17539-NP, Revision 0, Sequoyah, Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel IntegrityIncorporated by reference
Aging Management
ML12335A34027 November 2012Tennessee Valley Authority - Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review ofSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12240A17418 September 2012Review of the 2011 Refueling Outage Steam Generator Tube Inservice Inspection Reports
ML12185001030 June 2012Enclosure 2, Tennessee Valley Authority Sequoyah Nuclear Plant Units 1 and 2 - ANP-3053(NP), Revision 4, Sequoyah Htp Fuel Transition - NRC RAIs and Responses, June 2012 (Non-Proprietary Version)Loop seal
Anticipated operational occurrence
Fuel cladding
ML12153A37831 May 2012Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and ResponsesLoop seal
Anticipated operational occurrence
Fuel cladding
ML12137A29815 May 2012ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis
ML12118A16626 April 2012ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2Fuel cladding
ML12114A0615 April 2012Technical Report, SQN2-SGR-TRI, Revision 3, Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling.Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Tornado Missile Protection
Design basis earthquake
Large early release frequency
Earthquake
Control of Heavy Loads