Issue date | Title | Topic | |
---|---|---|---|
ML23235A172 | 23 August 2023 | Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report | |
ML23055A284 | 24 February 2023 | Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping | Fitness for Duty Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Coatings Operating Basis Earthquake Finite Element Analysis Aging Management Foreign Material Exclusion |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
ML22178A172 | 27 June 2022 | Long Term Coupon Surveillance Program | Aging Management |
ML22147A178 | 27 May 2022 | Owner'S Activity Report (Form OAR-1) for the Calvert Cliffs Nuclear Power Plant Unit 1 Spring 2022 Refueling Outage | Boric Acid Moisture barrier |
ML21350A114 | 16 December 2021 | Annual Commitment Change Notification | |
ML21316A051 | 12 November 2021 | Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections | EVT-1 |
ML21263A186 | 20 September 2021 | Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater System | Safe Shutdown VT-2 Through-Wall Leakage |
RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | 1 September 2021 | R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management |
ML21210A325 | 30 July 2021 | Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report | |
RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld | 12 May 2021 | Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld | Hydrostatic VT-2 Finite Element Analysis |
ML21077A180 | 18 March 2021 | 10 CFR 50.46 Annual Report and 30-day Report for Framatome'S Protect Enhanced Accident Tolerant Fuel (Eatf) Lead Test Assembly (LTA) | |
ML21013A530 | 13 January 2021 | Reactor Vessel Level Monitoring System Special Report | |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
ML20280A508 | 6 October 2020 | Submittal of Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | Incorporated by reference Fuel cladding |
ML20265A198 | 21 September 2020 | R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications for Steam Generator Tube Inspection Frequency | Anticipated operational occurrence Weld Overlay Locked High Radiation Area Pandemic COVID-19 |
ML20034E346 | 7 February 2020 | Review of the Spring 2019 Steam Generator Tube Inspection Report | |
ML19347A779 | 12 December 2019 | License Amendment Request to Utilize Accident Tolerant Fuel Lead Test Assemblies | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML19228A023 | 15 August 2019 | Proposed Alternative to Utilize Code Case N-879 | |
ML19072A096 | 11 March 2019 | Information Regarding Dissimilar Metal Weld 2-CV-2005-30 Flaw Characteristic and Repair Weld Overlay | Weld Overlay Hydrostatic Design basis earthquake Earthquake Dissimilar Metal Weld |
ML17345A990 | 21 December 2017 | R. E. Ginna Nuclear Power Plant Flood Hazard Mitigation Strategies Assessment | High winds FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Flood Hazard Mitigation Strategies Assessment |
ML17324B369 | 20 December 2017 | Flood Hazard Mitigation Strategies Assessment | Internal Flooding FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Flood Hazard Mitigation Strategies Assessment |
ML17214A118 | 27 July 2017 | Transmittal of 2017 Owner'S Activity Report for the Plant | |
RS-16-181, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | 9 November 2016 | Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | Boric Acid Shutdown Margin Ultimate heat sink FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
ML16061A016 | 26 February 2016 | ISFSI - Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72-48 | Tornado Missile |
ML16057A002 | 25 February 2016 | Report Concerning Dissimilar Metal Weld Flaw in Pressurizer Safety Relief Nozzle-to-Safe-End Weld | Weld Overlay Finite Element Analysis Dissimilar Metal Weld DM weld |
ML16076A352 | 24 February 2016 | Plants, Units 1 and 2 - E-mail Re. Draft Report Concerning Dissimilar Metal Weld Indication on Pressurizer Safety Relief Nozzel to Safe End Weld | Finite Element Analysis Dissimilar Metal Weld DM weld |
ML15350A108 | 19 January 2016 | Review of the 2015 Steam Generator Tube Inspections | |
ML15281A218 | 21 October 2015 | Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation | Fukushima Dai-Ichi |
ML15167A505 | 11 June 2015 | (Redacted Version) Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805, Attachment 3 | Hot Short Safe Shutdown Fire Barrier Coatings Hemyc Earthquake Fire Protection Program Fire Watch |
ML15153A026 | 11 June 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insight | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
RS-15-095, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 30 April 2015 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ML15077A103 | 16 April 2015 | Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | Safe Shutdown Ultimate heat sink Fukushima Dai-Ichi Frazil ice Earthquake |
RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 | 11 March 2015 | Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 | Safe Shutdown High winds Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML15072A011 | 11 March 2015 | Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 | Safe Shutdown High winds Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 2 of 2 | 11 March 2015 | Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 2 of 2 | Earthquake |
ML15075A339 | 10 March 2015 | NUH32PHB-0101, Revision 4, Design Criteria Document (DCD) for the Nuhoms 32PHB System for Storage | Hydrostatic Coatings Nondestructive Examination Control of Heavy Loads Fuel cladding |
ML15062A043 | 27 February 2015 | Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 | |
ML15042A137 | 3 February 2015 | Gesc, NAC International, Atlanta Corporate Headquarters, 655 Engineering Drive, Norcross, Georgia (Engineering Report #NS3-020, Effects of 1300F on Unfilled NS-3, While Bisco Products, Inc., 11/84), Enclosure 4 | |
L-14-036, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 17 December 2014 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Boric Acid Shutdown Margin FLEX Fukushima Dai-Ichi Earthquake Power-Operated Valves Power Operated Valves |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML14212A308 | 25 July 2014 | NUH32PHB-011, Rev 3, Design Report for 32PHB Dsc. | Nondestructive Examination Finite Element Analysis Fuel cladding Liquid penetrant |
ML14212A307 | 25 July 2014 | NUH32PHB.0101, Rev. 2, Design Criteria Document (DCD) for Nuhoms 32PHB System for Storage. | Hydrostatic Coatings Nondestructive Examination Control of Heavy Loads Fuel cladding |
ML14170B022 | 26 June 2014 | Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident | Safe Shutdown Unanalyzed Condition Time of Discovery Hydrostatic Operator Manual Action Locked High Radiation Area Fukushima Dai-Ichi Earthquake |
ML14206B007 | 19 May 2014 | Considerations for Using Marinite in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-009, Revision 4 | Fire Barrier |
ML14206B009 | 12 May 2014 | Considerations for Using Zinc in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-008, Revision 4 | Coatings |
ML14099A196 | 31 March 2014 | Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. | Safe Shutdown Unanalyzed Condition Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Operability Determination Earthquake Operability Assessment Seismic Walkdown Report |
ML14071A478 | 21 February 2014 | Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments | |
ML14007A704 | 19 February 2014 | R. E. Ginna Nuclear Power Plant - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Frazil ice Earthquake Fire Protection Program |