 Issue dateTitleTopic
ML20153G73023 September 1998Special Rept 98-003:on 980814,station Entered TS 3.3.3.6, Action Statment a Due to Inoperability of RVLIS B Train. Cause Has Not Yet Been Identified.Work Order 98-202813-000 Has Been GeneratedReactor Vessel Water Level
ML20237B73814 August 1998Special Rept 98-001:on 980615,oxygen Analyzer on Wgs Was Declared Inoperable.Wgs Oxygen Analyzer OARC-1119A Was Indicating 0 Ppm on 980814 & Fluctuated Between 200 & 900 Ppm on 980615.Completed Work Order & Declared Wgs Operable
ML20116B43924 July 1996Special Rept 96-003:on 960617 Declared Reactor Vessel Level Indicating System B Train Inoperable.Determined Probable Cause to Be within Resistance Temp Detector (Rtd).Tagged RTD out-of-service & Performed Further Troubleshooting
ML20107M35725 April 1996Special Rept 96-002:on 960327,RCS Pressure Exceeded Setpoint of 445 Psig for PORV 455A When Cooler,Denser Water,In Vessel Warmed & Expanded,But Did Not Approach TS Limit of 485 Psig. RCS Pressure Subsequently Stabilized at Approx 335 Psig
ML20091L09322 August 1995Special Rept 95-002:on 950727,valid Failure of EDG B Occurred.Util Believes Overspeed Plunger Partially Extended & Repositioned Overspeed Trip Lever.Adjusted Governor to Reduce Max Frequency Experienced by EDG B During StartupCoast down
ML20086B82728 June 1995Special Rept 95-001:on 950531,output Breaker for B EDG Tripped During Performance of Routine Monthly Testing.Ega Replaced & EDG B Was Evaluated & Determined to Be Operable
ML20078B94021 October 1994Special Rept 94-003,providing Info Re Number of Tubes Plugged in Each SG as Required by TS 4.4.5.5
ML20071L52129 July 1994Special Rept 94-002:on 940701 & 08,reported to CR That Net Refill Vols of Sheathing Filler Matl Exceeded 5 Percent of Net Duct Vol for Tendons V39 & 25CB.Voids Filled by Addl Grease Pumped Into Tendon Ducts
ML20070N7033 May 1994Special Rept 94-001:on 940329,seismic Monitoring Channel Declared Inoperable Due to Location on Exterior Reactor Cavity West Wall within Biological Shield Wall.Entire Accelermeter Package to Be ReplacedSafe Shutdown
Earthquake
ML20127G20212 January 1993Special Rept 93-001:on 921229,10-60 Meter Elevation Delta Temp Indication for Meteorological Tower Declared Inoperable Due to Erratic Indications.Ice Shields Installed to Minimize Recurrence
ML20101P9738 July 1992Special Rept 92-002:on 920608,valid Failure of EDG B Occurred Due to Failure to Temp Control Valve.Caused by Failure of Two Out of Three Power Pills.Power Pills Replaced & EDG Testing Frequency Increased
ML20097A28329 May 1992Special Rept 91-007,reporting Results of Fourth SG Tube Inservice Insp Completed by Westinghouse on 911024 of SGs a & C
ML20098D69526 May 1992Special Rept 92-001:on 920422,invalid Failure of EDG a Occurred When Output Breaker Tripped on Reverse Power.Caused by Megawatt Meter Used to Load EDG Reading 0.2 MW W/Edg in Standby.Meters Rezeroed to Ensure Proper Load Applied
ML20086P83020 December 1991Special Rept 91-006:on 911121,operators Depressed Test Button to Energize Relay K615 But EDG a Would Not Start. Caused by Incomplete Description of Initial Conditions in Surveillance Procedure.Statement Added to Procedure
ML20086L81512 December 1991Special Rept 91-005:on 911112,invalid Failure of Emergency Diesel Generator B Occurred During Train a Safeguards Actuation Test.Caused by Binding of Temporary Test Flag in Alternate Supply Breaker Cubicle.Test Flags Modified
ML20079L9871 November 1991Special Rept 91-004:all Inconel 600 Mechanical Tube Plugs in Steam Generators a & C Removed During Fourth Steam Generator Inservice Insp from 911016-24.Tubes Replugged W/Inconel 690 Except for Tubes R28C56 & R28C76 in Steam Generator C
ML20082U09116 September 1991Special Rept 91-003:on 910819,invalid Failure of EDG B. Caused by Unit Parallel Relay.Hermetically Sealed Relay Being Evaluated as Means to Prevent Similar Failures of Relay
ML20070U0032 April 1991Special Rept 91-002:on 910304,invalid Failure of Emergency Diesel Generator a Occurred.Caused by Failure of Operator to Verify That Correct Switch Adjusted Before Adding Load to Diesel Generator.Operator Counseled
ML20155J16917 October 1988Suppl 1 to Special Rept 85-011 Re Inoperable Loose Part Detection Sys Channel.On 850912,Channel 10 of Loose Part Detection Sys Declared Inoperable.Caused by Faulty Preamplifier Charge Converter.Converter Replaced
ML20154M05727 May 1988Special Rept 87-015-01:on 871211,failure of Emergency Diesel Generator a Occurred When Cracked Lube Oil Line Fitting Caused Excessive Leakage.Procedure Initiated That Will Require Use of Vendor Recommended Heavier Grade Oil
ML20154M01827 May 1988Special Rept 87-016-01:on 871219,diesel Generator B Failed When Generator Could Not Be Synchronized to Bus.Caused by Potential Transformer Fuse Knives Not Inserting Fully Into Fuse Stabs.Insp Windows on Each Cubicle Recommended
ML20148A40814 January 1988Special Rept 87-016:on 871219,failure of Emergency Diesel Generator B Occurred When Generator Not Synchronized W/Bus. Caused by Repeated Opening & Closing of roll-out Potential Transformer.Engineering Evaluation in Progress
ML20147C1748 January 1988Special Rept 87-015:on 871211,failure of Emergency Diesel Generator a Occurred Due to Excessive Leakage.Caused by Cracked Lube Oil Line Fitting.Fitting Replaced & Retested for Leakage.Cause of Cracking Not Determined
ML20149F8147 January 1988Special Rept 87-013:on 871109,discovered Low Level Radioactive Matl Delivered to Coffey County Land Fill.Caused by Nonlicensed Util Personnel Error.Procedure for Release of Radioactive Matl Revised
ML20238C78724 December 1987Special Rept 87-10,Suppl 2:voids in Tendon Sheathing Attributed to Listed Additive Factors,Quality Program Described,Grease Installation & Insp Discussed & Audits & Surveillance of Const Operations Conducted
ML20237E63118 December 1987Special Rept 87-014:on 871014,hydrogen Pressurizer Ignited. Caused by Inadequate Pressurizer Draining & Depressurizing Procedure.Procedure Review & Rev & Control Room Personnel Training PlannedLoop seal
ML20195K32816 November 1987Reportable Event 10691:on 871116,trash Bag Containing Low Level Contamination Found During Survey of Coffee County Landfill as Followup to Reportable Event 10646.Contaminated Rag Returned to Plant.Survey Continuing
ML20195K31711 November 1987Reportable Event 10646:on 871109,discovered That Low Level Radioactive Sheets of Metal Removed from Site & Delivered to Coffee County Landfill.All But Three Pieces Recovered.Search for Remaining Pieces Continuing
ML20235K45128 September 1987Suppl 1 to Special Rept 87-10:third Yr Tendon Surveillance on 870801-0914 Indicated That Net Refill Vols of Sheathing Filler Grease Exceeded 5% of Net Duct Vol for Tendons. Investigation Being Performed to Determine Causes of Voids
ML20238F77711 September 1987Special Rept 87-010:inservice Tendon Surveillance Voids in Excess of 5% of Net Duct Vol Discovered.Cause Not Stated. Prevention of Tendon Corrosion Assured by Adequately Coating Tendon Wires & Anchorage
ML20214U0695 June 1987Special Rept 87-006:on 870429,seismic Monitoring Instrumentation Channel Declared Inoperable & Remained Out of Svc for More than 30 Days.Caused by Faulty Voltage Regulating Printed Circuit Board.Board Will Be ReplacedSafe Shutdown
Earthquake
ML20207E87224 December 1986Special Rept 86-011:on 861201,failure of Emergency Diesel Generator a Occurred.Caused by Faulty Speed Switch.Switch Replaced.Faulty Switch Returned to Vendor for Failure Analysis & Repair
ML20212D96022 December 1986Suppl 1 to Special Rept 85-010:on 851001,two Failures of Diesel Generator a Occurred.Caused by Mild Fluctuations in Engine Speed & Output Breaker Trip on Reverse Power.Oil Added to Correct Fluctuations
ML20214K28318 November 1986Special Rept 86-005:on 861018,19 & 31,ESF Switchgear Rooms I & II Exceeded Max Temp Limit Specified in Tech Specs. Caused by Inoperability of Cooling Unit
ML20198E45312 May 1986Special Rept 86-002:on 860412,invalid Failure of Emergency Diesel Generator B Occurred During Surveillance Procedure STS KJ-001B.Caused by Malfunctioning Unit Parallel Relay. Relay Replaced
ML20154N3596 March 1986Special Rept 86-001:on 860127,net Refill Vols of Sheathing Filler Grease Exceeded 5% of Net Duct Vol for Listed Tendons.Caused by Physical Characteristics of Sheathing Filler Matl & Industry Std Installation Techniques
ML20140D27414 January 1986Special Rept 85-015:on 851215,diesel Generator B Output Breaker Tripped on Reserve Power.Caused by Operator Error. Operator Reclosed Output Breaker & Successfully Paralleled & Loaded Unit
ML20138P1739 December 1985Special Rept 85-014:on 851029,Channel 8 of loose-part Detection Sys Declared Inoperable.Cause Believed to Be in Either Charge Converter or Accelerometer.Investigations Underway
ML20136G0331 November 1985Special Rept 85-012:on 851003,invalid Failure of Diesel Generator B Occurred.Possibly Caused by Vent Petcocks Vibrating Open.Precautions Added to Procedures STS KJ-005B & STS KJ-005A to Ensure Petcocks Fully Closed
ML20136C76531 October 1985Special Rept 85-010:on 851001,two Failures of Diesel Generator a Occurred.Caused by Closed Governor Needle Valve. Valve Opened Slightly & Procedure Sys KJ-121, Diesel Generator NE01 & NE02 Lineup for Automatic... Revised
ML20198B27322 October 1985Special Rept 85-011:on 850912,Channel 10 of Loose Part Detection Sys Declared Inoperable During Surveillance Procedure.Investigation Conducted to Discover Root Cause & Plans for Restoring Inoperable Channel to Svc
ML20133G75316 July 1985Special Rept 85-009:on 850428,30 & 0506,ECCS Actuations Occurred.Caused by Personnel Error & Rate Sensitive Nature of Circuitry.Emphasis Being Placed on Rate Sensitive Nature of Circuitry During Requalification & Hot License Training
ML20129A40128 June 1985Special Rept 85-006:on 850601,during Periodic Surveillance Testing of Diesel Generator A,Generator Secured Prematurely Due to Erratic Low Jacket Water Pressure Indication & Alarm. Caused by Use of Valve Lineup to Test Starting Air SysTemporary Modification
ML20140F43824 June 1985Special Rept 85-008:on 850415,containment Base Slab Seismic Monitor Declared Inoperable Due to Failed Power Supply.Cause Unknown.New Power Supply Ordered.Temporary Power Supply InstalledEarthquake
ML20127N48410 June 1985Special Rept 85-007 Re Positive Moderator Temp Coefficient for Withdrawn Control Rods.Hot Zero Thermal Power Condition within Tech Spec 3.1.1.3a Limit.Control Rod Withdrawal Limits Incorporated Into Operating Procedures
ML20126J29230 May 1985Special Rept 85-005:on 850502,invalid Failure of Diesel Generator a Occurred Due to Personnel Oversight in Restoring Diesel to Svc After Planned Outage.On 850501,diesel Generator a Taken Out of Svc for Insp of Welds
ML20128E66317 May 1985Special Rept 85-004:on 850419,invalid Failure of Diesel Generator Occurred.Caused by Operating Error.Rept Will Be Added to Operations Required Reading to Emphasize Importance of Close Adherence to Procedural Steps
ML20128B6289 May 1985Special Rept 85-003:on 850409,black Smoke Observed Coming from Manifold of Diesel Generator B When Generator Started After Hot Web Deflection.Caused by Failure to Close Cylinder Petcocks.Petcocks Closed
ML20117G0411 May 1985Special Rept 85-002:on 850401,during Periodic Testing,Diesel Generator a Failed Due to Restrictive Acceptance Criteria & Personnel Error.Procedure STS KJ-0054A Revised & Personnel Instructed on Importance of Following Procedures
ML20117G16229 April 1985Special Rept 85-001:on 850330,invalid Failure of Diesel Generator A,NE01,occurred.Caused by Personnel Oversight Resulting in Inadequate Venting of Fuel Oil Lines After Maint.Work Request Procedure Revised