Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17229B06716 March 1999Technical Evaluation Rept, Florida Power & Light Co, Unit 1 Third Ten-Year Interval Pump & Valve Inservice Testing Program,Unit 2 Second Ten-Year Interval Pump & Valve Inservice Testing Program.Boric Acid
Shutdown Margin
Stroke time
Incorporated by reference
Cold shutdown justification
ML17355A28030 September 1998Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point.Fire Barrier
Coatings
ML17229B00131 January 1998Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2.Hot Short
Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Tornado Generated Missile
Design basis earthquake
Earthquake
Fire Protection Program
Fire Watch
ML17354B17331 January 1998Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4.Hot Short
Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Tornado-Generated Missile
Significance Determination Process
Design basis earthquake
TORMIS
Earthquake
Fire Protection Program
Fire Watch
ML17229A41527 May 1997Technical Evaluation Rept of IPE Submittal & RAI Responses for St Lucie Nuclear Plant.Boric Acid
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML17353A40330 September 1995Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4.Boric Acid
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML17228B12631 March 1995Technical Evaluation Rept on Second 10-Year Interval Insp Program Plan.Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
Scaffolding
ML20080K11028 February 1995Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4Boric Acid
High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Dissimilar Metal Weld
ML17309A74730 September 1994Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:St.Lucie-1/-2.
ML20076F27030 September 1994Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year IntervalSafe Shutdown
Boric Acid
Stroke time
Cold shutdown justification
Scaffolding
ML20076K98430 September 1994Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept
ML17228A88530 September 1994Errata to TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,St Lucie 1 & 2, Replacing Every Other Missing Page in Original Rept
ML20138E14822 June 1993Pump & Valve Inservice Testing Program St Lucie Unit 2 FPL, Technical Evaluation ReptBoric Acid
Stroke time
Incorporated by reference
Power Operated Valves
Backfit
ML20114A60031 August 1992TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4Boric Acid
Stroke time
Scaffolding
ML20105D08731 August 1992Auxiliary Feedwater System RISK-BASED Inspection Guide for the St. Lucie Unit 1 Nuclear Power Generation StationProbabilistic Risk Assessment
ML17349A21330 April 1992Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power PlantProbabilistic Risk Assessment
ML17349A41831 December 1991Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability AnalysisProbabilistic Risk Assessment
ML17349A41521 December 1991Ipe:Front End Audit.Internal Flooding
Probabilistic Risk Assessment
ML17349A41721 December 1991IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1Probabilistic Risk Assessment
ML17309A66530 November 1991Technical Evaluation Rept Pump & Valve Inservice Testing Program,St Lucie-Unit 1.Boric Acid
Shutdown Margin
Stroke time
Power-Operated Valves
Power Operated Valves
ML17223B32331 August 1991TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2).Anticipated operational occurrence
Safe Shutdown Earthquake
Earthquake
Fuel cladding
ML17348B12431 July 1991Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4.Stroke time
Power Operated Valves
Grace period
ML17308A50417 August 1990Final Technical Evaluation Rept St Lucie Unit 1 Station Blackout Evaluation.Safe Shutdown
Boric Acid
ML20043F63311 June 1990Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept
ML19332B61431 October 1989Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation ReptSafe Shutdown
ML17308A48231 May 1989Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components,St Lucie 1/2, Technical Evaluation Rept
ML20058K10330 May 1989Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation ReptSafe Shutdown
ML20246B81530 April 1989Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept
ML20246B97331 March 1989Conformance to Reg Guide 1.97:Byron 1/2 & Braidwood 1/2, Technical Evaluation ReptBoric Acid
ML20236B80513 March 1989Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files
ML17222A74131 January 1989Technical Evaluation Rept on Second Ten-Year Interval Inservice Insp Program Plan:Florida Power & Light Co,St Lucie Plant,Unit 1.Hydrostatic
Incorporated by reference
Liquid penetrant
ML17223A13231 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2.Loop seal
Anticipated operational occurrence
Operating Basis Earthquake
Design basis earthquake
ML17223A12931 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1.Loop seal
Anticipated operational occurrence
Operating Basis Earthquake
Design basis earthquake
ML20244C29330 November 1988Review of Florida Power & Light Co Safety Evaluations for Extending St Lucie Plant,Unit 2,ESFAS Subgroup Relay Test Interval, Technical Evaluation Rept
ML20205N94331 October 1988Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-1
ML17308A44631 March 1988Technical Evaluation Rept for Natural Circulation,Boron Mixing & Cooldown at St Lucie Unit 2.Tornado Missile
ML20196G29229 February 1988Technical Evaluation Rept,Evaluation of High Density Spent Fuel Rack Structural Analysis for St Lucie Plant - Unit 1Safe Shutdown Earthquake
Earthquake
ML20196C1644 February 1988Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131
ML20205N95331 January 1988Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-3Safe Shutdown
ML20205N94831 January 1988Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components - Millstone-2Safe Shutdown
ML18040B18931 August 1987Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs.
ML20235M35931 August 1987Preliminary Conformance to Reg Guide 1.97:Byron Units 1 & 2 & Braidwood Units 1 & 2, Technical Evaluation ReptBoric Acid
ML20235V15231 August 1987Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2
ML20237J06219 August 1987Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations SpdsBackfit
ML20237J14117 August 1987Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807
ML17347A59331 July 1987Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept
ML20236D91831 July 1987Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAsProbabilistic Risk Assessment
Earthquake
ML20236P64031 July 1987Review of Recirculation Pump Trip Design for Brunswick Steam Electric Plants, Informal Rept
ML18052B19330 June 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept
ML17342A75430 June 1987Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept