Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20206M28631 March 1998Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Fort Calhoun StationHot Short
Safe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Tornado-Generated Missile
Tornado Missile Protection
Earthquake
Failure to Scram
ML20134D7975 September 1996Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final ReptInternal Flooding
Probabilistic Risk Assessment
Severe Accident Management Guideline
ML20134D79413 June 1996Technical Evaluation Rept on Individual Plant Examination Front End AnalysisSafe Shutdown
Mission time
Internal Flooding
Probabilistic Risk Assessment
Severe Accident Management Guideline
Fuel cladding
ML20134D80331 May 1996Technical Evaluation Rept on Individual Plant Examination Back-End AnalysisMission time
Enforcement Discretion
Finite Element Analysis
Hardened vent
Backfit
ML20099L37430 November 1995Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Omaha Public Power District Fort Calhoun Station,Unit 1Hydrostatic
VT-2
Incorporated by reference
ML20070M85331 March 1994Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1Boric Acid
Incorporated by reference
Cold shutdown justification
ML20106A93630 September 1992Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant)Shutdown Margin
ML20127F27028 September 1992Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept
ML20100Q28630 September 1991Auxiliary Feedwater Sys Risk-Based Insp Guide for Fort Calhoun Nuclear Power PlantProbabilistic Risk Assessment
ML20081E97714 February 1991Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept
ML20247J91030 June 1989Rev 1 to Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort CalhounLoop seal
Anticipated operational occurrence
Safe Shutdown Earthquake
Design basis earthquake
ML20070Q52131 December 1988Nuclear Power Plant Sys Sourcebook,Fort Calhoun
ML20245D1496 January 1988Technical Evaluation Rept of Dcrdr for Fort Calhoun Nuclear Station
ML20245D1446 January 1988Final Post-Implementation Audit Rept for Omaha Public Power District Fort Calhoun Station SPDS, Technical Evaluation Rept
ML20214Q85030 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Informal Rept
ML20214R95831 March 1987Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Fort Calhoun, Informal ReptLoop seal
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML20209C20130 November 1986Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal ReptSafe Shutdown
ML20205E37131 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation ReptSafe Shutdown
ML20244E19031 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St VrainSafe Shutdown
ML20206A02330 April 1986Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal ReptSafe Shutdown
ML20138G89028 August 1985Technical Evaluation of Dcrdr for Ft Calhoun Station
ML20134N03930 July 1985Feasibility of Detecting PWR Thermal Shield Support Degradation Using Ex-Core Neutron Noise, Informal Ltr ReptFinite Element Analysis
ML20113B4588 March 1985In-Progress Audit of Detailed Control Room Design Review for Omaha Public Power District,Ft Calhoun StationEmergency Lighting
ML20092L85730 June 1984Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Station, Technical Evaluation Rept
ML20091L9421 May 1984Revised Control of Heavy Loads (C-10),Fort Calhoun Station, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20077K78217 January 1983Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20071M45029 November 1982Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation ReptSafe Shutdown
Coatings
Nondestructive Examination
Control of Heavy Loads
ML20027E71210 November 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Fort Calhoun Station, Vols I & Ii,Technical Evaluation ReptBoric Acid
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20076C3265 October 1982ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20064L5281 July 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept
ML20042A23328 February 1982Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station.
ML20040D16516 December 1981Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Rept, Request for Addl Info
ML20039A91130 November 1981Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Nuclear Station Unit 1,informal Rept
ML20005C00431 October 1981Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Fort Calhoun Station,Unit No. 1 Environmental Appraisal ReportGrab sample
Biofouling
ML20039B81031 October 1981Evaluation of Emergency Response Facilities for Fort Calhoun Station - Unit 1.Health Physics Network
High winds
ML20038A76931 October 1981Aquatic Impacts from Operation of Three Midwestern Nuclear Power StationsGrab sample
Biofouling
ML20003H27624 October 1980Primary Coolant Sys Pressure Isolation Valves,Fort Calhoun Unit 1, Technical Evaluation ReptHydrostatic
ML19326D71831 January 1980Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Fort Calhoun Nuclear Power Plant.
ML19317H18931 July 1978In-Plant Source Term Measurements at Fort Calhoun Station- Unit 1.Boric Acid
Grab sample