Issue date | Title | Topic | |
---|---|---|---|
ML20350B739 | 15 December 2020 | TMI - Final Written Examination with Answer Key (401-5 Format) and Legible Embedded References (Post 2020 Audit) (Folder 3) | Safe Shutdown Unanalyzed Condition Shutdown Margin Offsite Dose Calculation Manual Post Accident Monitoring Operating Basis Earthquake Fuel cladding Fire Protection Program Power change |
ML20350B723 | 15 December 2020 | TMI - Revised Form ES-301-4 (Post 2020 Audit) (Folder 1) | |
ML20350B716 | 15 December 2020 | TMI - Revised Form ES-301-5 (Post 2020 Audit) (Folder 1) | |
IR 05000289/2019301 | 15 August 2019 | Initial Operator Licensing Examination Report 05000289/2019301 | |
ML19156A384 | 5 June 2019 | Operator Licensing Written Exam Approval | |
ML19156A358 | 4 June 2019 | Operator Licensing Operating Test Approval | |
RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations | 16 May 2019 | Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations | |
RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | 25 April 2018 | Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | |
ML18005A420 | 3 January 2018 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |
IR 05000289/2017301 | 23 August 2017 | Initial Operator Licensing Examination Report 05000289/2017301 | |
ML18081A807 | 3 August 2017 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML17230A294 | 3 July 2017 | NRC Comments on Draft Licensee-Developed Exam (Written)(Folder 2) | |
ML17230A316 | 3 July 2017 | Draft Outlines (Folder 2) | Shutdown Margin |
ML17230A322 | 3 July 2017 | Draft Written Exam (Folder 2) | |
ML17230A327 | 3 July 2017 | Draft Operating Exam (Sections a, B, and C) (Folder 2) | |
ML18081A811 | 26 June 2017 | Handouts to Applicants (Folder 3) | |
ML17233A134 | 26 June 2017 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Severe Accident Management Guideline |
ML17233A133 | 26 June 2017 | Final Outlines (Folder 3) | |
ML17233A135 | 26 June 2017 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Boric Acid Shutdown Margin Post Accident Monitoring Operating Basis Earthquake Job Performance Measure Power change |
ML18081A808 | 19 June 2017 | Final Qa/Related Forms - Form ES-401-6 (Folder 1) | |
ML17171A100 | 19 June 2017 | Initial Operator Licensing Operating Test and Written Examination Approval - Three Mile Island Nuclear Station, Unit 1 | |
RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | 3 May 2017 | Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML17034A092 | 2 February 2017 | Requalification Program Inspection - Three Mile Island Nuclear Station, Unit 1 | |
ML17018A282 | 17 January 2017 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML15352A064 | 25 September 2015 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML15267A771 | 24 September 2015 | Initial Operator Licensing Operating Test and Written Examination Approval-Three Mile Island Nuclear Station, Unit 1 | |
ML15352A065 | 18 September 2015 | Final Qa/Related Forms (Folder 1) | |
ML15292A369 | 18 September 2015 | Final Written Examination with Answer Key (401-5 Format) (Folder 2) | Safe Shutdown Boric Acid Shutdown Margin Packing leak Offsite Dose Calculation Manual Post Accident Monitoring Operating Basis Earthquake Missed surveillance Surveillance Frequency Control Program Severe Accident Management Guideline Breakaway torque Earthquake Power-Operated Valves Fuel cladding Fire Protection Program Power change |
ML15292A370 | 18 September 2015 | Final Operating Exam (Sections a, B, and C) (Folder 2) | Safe Shutdown Boric Acid Shutdown Margin Job Performance Measure Earthquake Power change Siren |
ML15335A332 | 18 September 2015 | Handouts to Applicants (Folder 3) | |
ML15335A331 | 18 September 2015 | Final Outlines (Folder 3) | |
ML15335A327 | 9 September 2015 | NRC Comments of Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML15335A329 | 14 August 2015 | Draft Written Exam (Folder 2) | Safe Shutdown Boric Acid Shutdown Margin Packing leak Offsite Dose Calculation Manual Post Accident Monitoring Operating Basis Earthquake Missed surveillance Surveillance Frequency Control Program Severe Accident Management Guideline Earthquake Power-Operated Valves Fire Protection Program |
ML15335A330 | 30 July 2015 | Draft Operating Exam (Sections a, B, and C) (Folder 3) | Safe Shutdown Boric Acid Shutdown Margin Job Performance Measure Earthquake Power change Siren |
ML15335A328 | 30 June 2015 | Draft - Outlines (Folder 2) | Shutdown Margin Power-Operated Valves |
ML14192B097 | 10 July 2014 | June 4, 2014, NRC Generic Fundamentals Exam Results - TMI Nuclear Station, Unit 2 Cover Letter | Generic Fundamentals Examination |
ML14111A296 | 5 April 2014 | Draft Operating Exam (Sections a, B and C) (Folder 2) | Boric Acid Shutdown Margin Grab sample Offsite Dose Calculation Manual Job Performance Measure Earthquake Power change |
ML14093A016 | 3 April 2014 | Initial Operator Licensing Operating Test and Written Exam Approval, Three Mile Island, Unit 1 | |
ML14141A104 | 1 April 2014 | Final Outlines (Folder 3) | |
ML14141A105 | 1 April 2014 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Shutdown Margin Ultimate heat sink Fire Barrier Post Accident Monitoring Fire impairment Fuel cladding Fire Protection Program |
ML14141A107 | 1 April 2014 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Boric Acid Shutdown Margin Grab sample Offsite Dose Calculation Manual Job Performance Measure Earthquake Power change |
ML14143A127 | 1 April 2014 | Final Qa/Related Forms (Folder 1) | |
ML14111A292 | 1 April 2014 | NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML14111A293 | 1 April 2014 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML14111A295 | 4 March 2014 | Draft Written Exams (Folder 2) | Safe Shutdown Shutdown Margin Ultimate heat sink Post Accident Monitoring Fire impairment Fire Protection Program |
TMI-14-002, Draft - Outlines (Folder 2) | 7 January 2014 | Draft - Outlines (Folder 2) | Boric Acid Shutdown Margin |
ML13333A156 | 26 November 2013 | Senior Reactor and Reactor Operator Initial License Exam-TMI/1 120 Day Exam Ltr | |
ML12299A366 | 25 October 2012 | September 5, 2012, NRC Generic Fundamentals Examination Results (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations | 5 July 2012 | (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
IR 05000289/2012301 | 7 June 2012 | Er 05000289-12-301, April 16 - May 16, 2012; Three Mile Island Nuclear Station, Unit 1; Initial Operator Licensing Examination Report |