ML15335A327
Jump to navigation
Jump to search
| ML15335A327 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/09/2015 |
| From: | Peter Presby Operations Branch I |
| To: | Exelon Generation Co |
| Shared Package | |
| ML15135A253 | List: |
| References | |
| TAC U01913 | |
| Download: ML15335A327 (1) | |
Text
Draft operating test comments were provided verbally to the licensee during on-site exam validation. Requested changes were implemented in the final version of the operating test. See Final Outlines Change Summary.
Draft operating test comments were provided verbally to the licensee during on-site exam validation. Requested changes were implemented in the final version of the operating test. See Final Outlines Change Summary.