ML14111A292
Jump to navigation
Jump to search
ML14111A292 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 04/01/2014 |
From: | Peter Presby Operations Branch I |
To: | Exelon Generation Co |
Jackson D | |
Shared Package | |
ML13333A179 | List: |
References | |
TAC U01895 | |
Download: ML14111A292 (9) | |
Text
Post NRC Week Enhancements Scenario 1
- 1. Page 1- Added NRC Validation Code to Initial Conditions.
- 2. Page 1- Changed ARO I CRS Normal to Component
- 3. Page 5- Removed FW to Manual actions from Event 6 description.
- 4. Page 5- Cleaned up AOP-070 symptoms and actions from Event 5 description.
- 5. Page 44- Replaced MU-P-1A Overcurrent for Event 8 with MU-V-36 Fails Closed.
- 6. Rearrange flow of Events 7 and 8.
- 7. Page 1, 6, 13- Changed Event 8 to MU-V-36 fails Closed.
- 8. Page 24- Editorial change to spell out Low Level Limits in Footnote
- 9. Page 27- Editorial change to correct page number for examiner note.
- 10. Page 29- Editorial change to add Verifies AH-E-93A I 94A selected for operation.
- 11. Page 39- Editorial change to add examiners note that Step 3.9 may have been performed in previous steps.
- 12. Page 41- Editorial Change to remove Guide 9 requirements prior to continuing scenario.
- 13. Swapped CT-21 and CT-22 within body of scenario to link to correct actions.
- 14. Page 49- Editorial change to add procedure note about 50.54x entry evaluation.
- 15. Page 49- Added Step 3.35 IAAT criteria for OTSG isolation criteria.
Scenario 2
- 1. Page 1- Added NRC Authorization Code to Initial Conditions.
- 2. Page 23- Editorial change to add requirement for RCS pressure to Examiner Note prior to proceeding with scenario.
- 3. Page 26- Editorial to add valve indications and operator actions for Step 4.5
- 4. Page 27- Editorial change to add correction in Step 4.10 from BYPASS indication to BLEED position.
- 5. Page 28- Added Tech Spec information to body of scenario and examiner's note.
- 6. Page 30- Added Examiner's Cue if crew directs actions in OP-TM-541-444 to swap NS-P-1B to alternate power supply.
- 7. Page 33- Editorial change to add CT-18 to crew actions.
- 8. Page 35- Editorial change to add page number for procedure steps to Examiner's notes.
- 9. Page 39- Editorial change to add CT-12 to crew actions.
- 10. Page 40- Editorial change to add CT-3 to crew actions.
- 11. Page 41- Editorial change to add restoring an emergency diesel generator for the crew if CT-3 actions not completed prior to RCP seal temperatures exceeding 235F. Added to Examiner's Note.
Scenario 4
- 1. Page 1- Added NRC Authentication Code and maintenance testing EF-V-30B to Initial Conditions.
- 2. Page 4- Added Tech Spec information to Event 4 description.
- 3. Page 31- Editorial change to add Tech Spec 3.5.7 information to Examiner's Note.
- 4. Page 17- Editorial change to add Booth Cue if crew contacts I&C about suspending maintenance on EF-V-30B
- 5. Page 20- Editorial change to add to Booth Cue about report to crew for inadvertent bumping of switch during maintenance and booth actions to clear malfunctions and alarms.
- 6. Page 37- Editorial change with Examiner Note to remove reactivity manipulation required prior to continuing with scenario.
- 7. Page 41- Editorial note to clarify crew actions with Loss of Primary I Secondary Heat transfer in the Examiner's Note.
JPM A
- 1. Page 1- Added Task Standard and Task Number.
- 2. Page 1, 13- Rearranged Initial Conditions.
- 3. Page 3- Editorial change for simulator setup on Step 7. Procedure filled out to 4.2.2 instead of 4.3
- 4. Page 5- Editorial change on Performance Step 3:
- a. Step 1- updated the PPC point
- b. Step 2- Corrected 31 inches to 3.1 inches.
- c. Step 3- Corrected 31 inches to 3.1 inches and 38 inches to 65.9
- 5. Page 6- Removed Booth Operator Cue.
- 6. Page 8- Performance Step 10:
- a. Standard Step 2- Changed 1000-1020 as the desired batch to 100-120.
- 7. Page 9- Editorial change to remove critical step from Performance Step 11.
- 8. Page 11- Editorial change to add critical step to Performance Step 17.
JPM B
- 1. Page 1, 17- Rearranged Initial Conditions
- 2. Page 1- Added Task Standard
- 3. All steps of the procedure that were N/A were removed from the JPM with an Examiner Note.
- 4. Page 8, Step 11- Editorial change to change MU-P-2A to MU-P-3A in Booth Operator Cue.
- 5. Page 9, Step 14- Editorial change to change MU-P-2C to MU-P-3C in Booth Operator Cue.
- 6. Page 12- Combined examiner note into performance step 21.
- 7. Page 11- Editorial Change to add clarifying information in Standard of Performance Step 27.
- 8. Page 15- Editorial change to add Examiner Note that JPM may be terminated following Performance Step 26.
- 9. Page 15- Changed terminating cue.
JPM C
- 1. Page 1- Changed task number.
- 2. Page 1, 12- Rearranged initial conditions.
- 3. Page 1- Editorial change to add specific Task Standard.
- 4. Page 2 -Editorial change to simulator setup:
- a. Changed Temp IC to 123
- b. Changed Event 2 to Trigger 2 on start of MU-P-1C
- c. Changed Malfunction MU33B to MU33A in Step N.
- d. Added Step 0. to add Malfunction MU31C Immediately.
- 5. Page 4- Editorial change to remove critical step from Performance Steps 4 and 5.
- 6. Page 6- Editorial change to remove critical step from Performance Steps 10
- 7. Page 8- Editorial change to Performance Step 17. Corrected "Starts MU-P-1B" to "Starts MU-P-1C."
- 8. Page 8- Editorial change to Booth Operator Cue to ensure Event 2 trigger is inserted.
JPM D
- 1. Page 1- Rearranged initial conditions.
- 2. Page 1- Editorial changes:
- a. Added specific Task Standard
- b. Added procedure number for Handout
- 3. Page 3- Minor editorial changes to Performance Steps 1 thru 4.
JPM E
- 1. Page 1- Rearranged initial conditions.
- 2. Page 1- Editorial change to Task Standard. Changed 55-60 psig to 52-75 psig.
- 3. Page 1- Editorial change to Handout to read "signed off through Section 3.3".
- 4. Page 1- Editorial change to Initial Conditions to add "The instructor will act as URO and CRS".
- 5. Page 4- Minor editorial changes to Performance Steps 3 through 10.
JPM F
- 1. Page 1- Editorial changes to Initial Conditions
- 2. Page 1- Editorial change to add specific Task Standard
- 3. Page 3- Editorial change to Simulator Setup to correct Step D from "B" 4Kv to "D" 4KV.
- 4. Page 1- Minor editorial changes to General References and Handouts.
JPM G
- 1. Page 1- Editorial change to add specific Task Standard
- 2. Page 1- Editorial change to Initial Conditions.
- 3. Page 1- Editorial change to update current revisions of General Reference procedures.
- 4. Page 2- Editorial change to Simulator setup to change RMRAMPIN from 1 to 3
- 5. Page 3- Minor editorial changes to Performance Steps 1 through 12.
- 6. Page 4- Added Examiner's Note.
- 7. Page 4- Removed extra performance step.
- 8. Page 6- Removed note about alternate path prior to Performance Step 9.
- 9. Page 6- Added ICO Cue.
JPM H
- 1. Page 1- Added Task Number.
- 2. Page 1- Editorial changes:
- a. Added specific Task Standard
- b. Initial Condition order rearranged and step added to state maximum allowable flow per permit is 47,500 scfm.
- c. Made correction to General Reference procedure revision number.
- d. Removed 6610-ADM-4250.12 from Handout references.
- e. Reworded initiating cue to not exceed 20,000 scfm.
- 3. Page 1, 11- Changed initiating cue.
- 4. Page 3- Editorial change to Simulator setup to change Step 2 sign off through Step 4.6 vice 4.19.
- 5. Made the following Performance Steps critical:
- a. Steps 1, 4, 5, 9, 10, 13
- 6. Removed critical step from Performance Step 12.
- 7. Page 8- Changed flow rate in Performance Step 13.
JPM I
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 6- Editorial changes to Evaluator Note for Performance Step 4. Added direction on the position of the breaker handle and whether it is pointing UP or DOWN.
- 3. Page 6- Editorial changes to Evaluator Note for Performance Step 5. Added direction on the position of the breaker handle and whether it is pointing UP or DOWN.
- 4. Page 6- Added Evaluator Note to state that performing steps out of order can cause battery charger damage and is grounds for JPM failure.
- 5. Page 8- Added "not time critical" to cue sheet.
JPM J
- 1. Page 1- Editorial changes:
- a. Changed Task number
- b. Updated Initial Conditions
- c. Added specific Task Standard
- 2. Page 1, 8- Changed initiating cue.
- 3. Page 3- Added Evaluator Cue to describe operation of manual alignment sleeve prior to Performance Step 1.
JPM K
- 1. Page 1- Editorial changes:
- a. Changed Task Number
- b. Updated Initial Conditions
- c. Added specific Task Standard
- 2. Page 3- Added Evaluator Note to describe location of Chemical Addition Room where N2 bottles are located.
- 3. Page 4- Edited existing Evaluator Cue prior to Performance Step 2.
- 4. Page 5- Added Evaluator Cue to state raising Core Flood Tank pressure using the "A" side regulator.
- 5. Page 5- Editorial change to add clarifying information to Standard of Performance Step 4.
- 6. Page 6- Editorial change to add clarifying information to the Evaluator Cue of Performance Step 5 to describe one N2 supply valve in the CLOSED position.
- 7. Page 6- Changed Standard for Performance Step 5 to describe actions taken to verify open N2 supply valve NI-V-138 and to OPEN NI-V-141.
- 8. Page 7- Editorial change to correct Standard on Performance Step 6 to read NI-V-798 vice NI-V-808
- 9. Page 9- Added Time Critical as "No" to cue sheet.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 4- Editorial change to remove Critical step from Performance Step 6.
- 3. Page 4- Editorial change to correct Performance Step 8 Standard from -1.05%- 1.15% to -1.0%
to -1.2%.
- 4. Page 5- Editorial change to raise the band in Standard of Performance Step 10.
- 5. Page 7- Editorial changes on Standard of Performance Step 16 and made step Not critical.
- 6. Page 8- Edited Answer Key.
- 7. Page 10- Added "not time critical" to cue sheet.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 2- Edited validation time and removed time critical wording.
- 3. Page 3- Edited Evaluator Note prior to Performance Step 1.
- 4. Page 6, 7- Added Examiner Notes prior to Performance Steps 9, 10, 12.
- 5. Page 7- Edited standard for Performance Step 13.
- 6. Page 8- Edited standard for Performance Steps 14 and 15.
- 7. Page 13- Edited Examinee data sheet.
- 8. Editorial changes to align body of JPM with Answer key.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- c. Edited Required Materials
- 2. Page 2- Edited General References.
- 3. Page 2, 9- Edited Initiating Cue.
- 4. Page 3, 4, 5, 6- Added Examiner Note prior to Performance Steps 1, 2, 3, 4.
- 5. Page 3, 4, 5, 6- Added balding to the standards of Performance Steps 1, 2, 3, 4.
- 6. Page 7- Added Answer Key.
- 7. Page 9- Added "Not time critical" to cue sheet.
- 8. Page 8- Edited footer.
- 9. Page 9- Added a table as part of the Cue Sheet for students to identify answers to required questions concerning ability for RCP to start based on various switch positions and plant conditions.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 5- Edited the standard for Performance Step 8.
- 3. Page 7- Edited the standard for Performance Step 14.
- 4. Editorial comments to correct incorrect scenario number and added information in Examiner Cue before Performance Step 16 to include Step 17 also.
- 5. Page 15- Added "Not time critical" to cue sheet.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 4- Editorial change to remove Critical step from Performance Step 6 and 16.
- 3. Page 5- Editorial change to correct Performance Step 8 Standard from -1.05%- 1.15% to -1.0%
to -1.2%.
- 4. Page 5- Editorial change to raise the band in Standard of Performance Step 10.
- 5. Page 8- Editorial changes to correct the Standard of Performance Step 16 to add correct values for hours after shutdown and hours that ECB is valid.
- 6. Page 9- Added incorrect entries along with the correct entries on the ECB Key.
- 7. Page 11- Added "Not time critical" to cue sheet.
- 8. Page 12- Edited Attachment 7.1 cue sheet.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 2- Edited General References.
- 3. Page 2, 17- Edited Initiating Cue.
- 4. Page 7, 8- Added Examiner Note prior to Performance Step 9, 10, 11.
- 5. Page 9, 10, 11- Edited Standards of Performance Steps 13, 14, 15.
- 6. Editorial changes to align body of JPM with Answer key.
- 7. Added incorrect entries along with the correct entries on the answer Key.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 2- Edited Required Materials and General References.
- 3. Page 2, 10- Edited Initiating Cue.
- 4. Page 3, 4, 5, 6- Examiner Note added prior to Performance Steps 1, 2, 3, 4.
- 5. Page 8- Answer Key added.
- 6. Page 6- Added "Not time critical" to cue sheet.
- 7. Added a table as part of the Cue Sheet for students to identify answers to required questions concerning ability for RCP to start based on various switch positions and plant conditions.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 2, 7- Edited Initiating Cue.
- 3. Page 4- Editorial change to clarify Standard of Performance Step 3 since plant is not degassing during scenario. Corrected the sample time from 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 1. Page 1- Editorial changes:
- a. Updated Initial Conditions
- b. Added specific Task Standard
- 2. Page 2- Edited General References and Handouts.
- 3. Page 2- Editorial change to update Initiating Cue.