Issue date | Title | Topic | |
---|---|---|---|
PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power | 16 September 1999 | PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power | |
PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie | 16 November 1998 | PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie | |
PNO-I-93-062, on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan | 12 November 1993 | PNO-I-93-062:on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan | |
PNO-I-88-115, on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell | 2 November 1988 | PNO-I-88-115:on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell | Reactor Vessel Water Level |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
PNO-I-87-094, on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated | 13 October 1987 | PNO-I-87-094:on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated | |
PNO-I-87-072, on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing | 30 July 1987 | PNO-I-87-072:on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing | Reactor Vessel Water Level |
ML20213G734 | 12 November 1986 | PNO-I-DRILL86-1:during Fuel Handling in Spent Fuel Pool to Inspect Fuel Suspected to Contain Failed Fuel,Handling Machine Became Stuck in Upright Position W/Fuel in Machine. Fuel Remained Submerged in Pool | |
PNO-I-86-078, on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart | 24 September 1986 | PNO-I-86-078:on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart | |
PNO-I-86-063, on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition | 8 August 1986 | PNO-I-86-063:on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition | |
PNO-I-86-047, on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated | 7 July 1986 | PNO-I-86-047:on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated | |
PNO-I-86-045, on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided | 30 June 1986 | PNO-I-86-045:on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided | Shutdown Margin |
ML20198R616 | 5 June 1986 | PNS-I-86-007:on 860605,two 35-mm Photographic Film Containers Found in Contractor Employee Lunch Box During Routine Search of Vehicle.One Container Contained Marijuana. Unknown Substance in Pill Form Found in Second Container | |
PNO-I-86-036, on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated | 5 May 1986 | PNO-I-86-036:on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated | |
PNO-I-86-027, on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 860414 | 14 April 1986 | PNO-I-86-027:on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 860414 | |
ML20136E919 | 2 January 1986 | PNS-I-86-001:on 860102,contract Const Security Force Received Bomb Threat from Unidentified Caller.Contingency Plan Implemented.Drywell & Reactor Bldg Searched W/Negative Results.Security Increased Due to Lay Offs of Craft Workers | |
PNO-I-85-064A, on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway | 5 September 1985 | PNO-I-85-064A:on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway | |
PNO-I-85-064, on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established | 4 September 1985 | PNO-I-85-064:on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established | |
PNO-I-85-039, on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased | 23 May 1985 | PNO-I-85-039:on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased | |
ML20207G536 | 30 December 1977 | PNO-77-227:on 771230,crane Operator Employed at Hope Creek Construction Site Killed While Assisting in Unloading of Gravel from Barges.Worker Apparently Fell from Pier Into Water.No Witnesses to Accident.Body Recovered from Water |