Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205K244 | 15 March 1999 | Rev 3 to Calculation 52308.04-C-004, A-46 Evaluation of RWST Tag Number 105.TK-1,2-QS-TK-1 | |
ML20205K235 | 15 March 1999 | Rev 1 to Calculation 52308.04-C-003, A-46 Evaluation of CST Tag Number 1-CN-TK-1,2-CN-TK-1 | |
ML20202B318 | 13 June 1997 | Rev 0 to Calculation 100031-C-06, Project Specific Verification of Computer Code Super Sassi/Pc | |
ML20202B284 | 12 June 1997 | Rev 0 to Calculation 100031-C-05, Stress Calculation | |
ML20202B270 | 12 June 1997 | Rev 0 to Calculation 100031-C-04, Sliding & Overturning Factor of Safety | |
ML20202B228 | 12 June 1997 | Rev 0 to Calculation 100031-C-03, Pad Model & Input to Module House | |
ML20202B185 | 12 June 1997 | Rev 0 to Calculation 100031-C-02, Sassi:Modules Point & Site | |
ML20202B154 | 12 June 1997 | Rev 0 to Calculation 100031-C-01, Development of Soil Profile | Earthquake |
ML17354A429 | 7 March 1997 | Ampacity Derating Response to NRC GL 92-08 for Cables Routed in Conduit & Tray w/Thermo-Lag 330-1 Barrier Sys Coating. | Safe Shutdown Fire Barrier Coatings |
ML17354A430 | 7 March 1997 | Fire Barrier Acf for T-Lag 330-1/770-1 Assemblies. | Safe Shutdown Fire Barrier |
ML17354A431 | 7 March 1997 | Review of Ampacity Ratings for Power Cables in Conduits & Trays w/Thermo-Lag 330-1 Covering. | Fire Barrier |
ML17354A432 | 7 March 1997 | Ampacity Derating for Cables in Raceways & Boxes w/Thermo- Lag 330 & w/Thermo-Lag 330 W/Layer of Thermo-Lag 770 Fire Barrier Coating. | Safe Shutdown Fire Barrier Coatings |
ML18151A414 | 25 June 1996 | Addendum a to Rev 0 to ME-0498, Pressure Locking & Stem Effect Thermal Binding Analysis for GL 95-07. | Stroke time Weak link |
ML18153A013 | 3 April 1995 | Rev 5 to ME-0465, Determination of Heat Transfer Impact to Lhsi Sump Recirculation Valves During Initial DBA Event. W/One Oversize Drawing | |
ML20203B432 | 27 February 1995 | Rev 0 to Calculation CE-1181, Structural Design Criteria for ISFSI at North Anna Power Station | Safe Shutdown Earthquake Operating Basis Earthquake Tornado Generated Missile Design basis earthquake Earthquake |
ML20059G590 | 10 January 1994 | Verification of Structural Adequacy of Manway Cover Fastners Under Design Pressure for Vol Control Tank (2-CH-TK-2) | |
ML18152A133 | 30 December 1993 | Rev 0 to Calculation 52182-C-013, RWST Tank USI-A-46 1&2-CS-TK-1. | Earthquake |
ML17349A250 | 27 March 1992 | Verification of Degraded Voltage Relay Protection for Safety-Related Equipment (Coordination Between Undervoltage & Overcurrent Protection) for Unit 3 | |
ML17349A249 | 27 March 1992 | Unit 3 Load Centers Undervoltage Relay Set Points. | |
ML17348A947 | 15 March 1991 | PSB-1 Voltage Analysis for Electrical Auxiliary Sys. |