Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20205K24415 March 1999Rev 3 to Calculation 52308.04-C-004, A-46 Evaluation of RWST Tag Number 105.TK-1,2-QS-TK-1
ML20205K23515 March 1999Rev 1 to Calculation 52308.04-C-003, A-46 Evaluation of CST Tag Number 1-CN-TK-1,2-CN-TK-1
ML20202B31813 June 1997Rev 0 to Calculation 100031-C-06, Project Specific Verification of Computer Code Super Sassi/Pc
ML20202B28412 June 1997Rev 0 to Calculation 100031-C-05, Stress Calculation
ML20202B27012 June 1997Rev 0 to Calculation 100031-C-04, Sliding & Overturning Factor of Safety
ML20202B22812 June 1997Rev 0 to Calculation 100031-C-03, Pad Model & Input to Module House
ML20202B18512 June 1997Rev 0 to Calculation 100031-C-02, Sassi:Modules Point & Site
ML20202B15412 June 1997Rev 0 to Calculation 100031-C-01, Development of Soil ProfileEarthquake
ML17354A4297 March 1997Ampacity Derating Response to NRC GL 92-08 for Cables Routed in Conduit & Tray w/Thermo-Lag 330-1 Barrier Sys Coating.Safe Shutdown
Fire Barrier
Coatings
ML17354A4307 March 1997Fire Barrier Acf for T-Lag 330-1/770-1 Assemblies.Safe Shutdown
Fire Barrier
ML17354A4317 March 1997Review of Ampacity Ratings for Power Cables in Conduits & Trays w/Thermo-Lag 330-1 Covering.Fire Barrier
ML17354A4327 March 1997Ampacity Derating for Cables in Raceways & Boxes w/Thermo- Lag 330 & w/Thermo-Lag 330 W/Layer of Thermo-Lag 770 Fire Barrier Coating.Safe Shutdown
Fire Barrier
Coatings
ML18151A41425 June 1996Addendum a to Rev 0 to ME-0498, Pressure Locking & Stem Effect Thermal Binding Analysis for GL 95-07.Stroke time
Weak link
ML18153A0133 April 1995Rev 5 to ME-0465, Determination of Heat Transfer Impact to Lhsi Sump Recirculation Valves During Initial DBA Event. W/One Oversize Drawing
ML20203B43227 February 1995Rev 0 to Calculation CE-1181, Structural Design Criteria for ISFSI at North Anna Power StationSafe Shutdown Earthquake
Operating Basis Earthquake
Tornado Generated Missile
Design basis earthquake
Earthquake
ML20059G59010 January 1994Verification of Structural Adequacy of Manway Cover Fastners Under Design Pressure for Vol Control Tank (2-CH-TK-2)
ML18152A13330 December 1993Rev 0 to Calculation 52182-C-013, RWST Tank USI-A-46 1&2-CS-TK-1.Earthquake
ML17349A25027 March 1992Verification of Degraded Voltage Relay Protection for Safety-Related Equipment (Coordination Between Undervoltage & Overcurrent Protection) for Unit 3
ML17349A24927 March 1992Unit 3 Load Centers Undervoltage Relay Set Points.
ML17348A94715 March 1991PSB-1 Voltage Analysis for Electrical Auxiliary Sys.