Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
ML18019A269 | 12 February 2018 | Flood Hazard Mitigation Strategies Assessment | Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi Flood Hazard Mitigation Strategies Assessment |
JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 29 August 2017 | Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ML17110A274 | 20 April 2017 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1 | Through-Wall Leak |
ML16043A411 | 18 February 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake |
JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask | 6 November 2015 | Submittal of 10 CFR 71.95 Report Involving 8-120B Cask | |
ML15007A090 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) | FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Design basis earthquake Containment Hardened Vent Earthquake Scaffolding |
JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. | 30 December 2014 | Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. | Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Containment Hardened Vent Earthquake Power Operated Valves |
JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models | 1 August 2014 | 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models | |
ML14073A155 | 1 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13247A036 | 20 August 2013 | Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask | |
ML13273A691 | 20 August 2013 | Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask | |
JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models | 1 August 2013 | James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models | |
JAFP-12-0135, Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 27 November 2012 | Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Unanalyzed Condition Fukushima Dai-Ichi |
ML13162A627 | 20 February 2012 | Summary of R1 Containment Vents | |
ML112700069 | 26 September 2011 | Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants | Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume Earthquake |
ML112510187 | 8 September 2011 | NRC Investigation Report Nos. 1-2009-041, 1-2010-019, and 1-2010-031 | High Radiation Area |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
JAFP-09-0091, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models | 31 July 2009 | 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models | |
JAFP-09-0056, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48 | 11 May 2009 | Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48 | |
ML083100663 | 19 November 2008 | Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01 | Liquid penetrant |
JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility | 2 October 2008 | Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility | RAMQC |
ML081010277 | 8 September 2008 | Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions | |
ML080590580 | 15 February 2008 | List of Requesters Fitzpatrick | |
ML080590579 | 14 February 2008 | Foia/Pa Cases Received from 02/12/07 to 02/12/08 | Boric Acid License Renewal Earthquake Stolen Inattentive Power Uprate Exit Sign |
ML071160186 | 21 May 2007 | Biological Assessment for Species Under the Jurisdiction of the U.S. Fish and Wildlife Service - James A. FitzPatrick Nuclear Power Plant License Renewal Review | License Renewal |
ML071000492 | 26 March 2007 | Usfws Threatened and Endangered Species System (Tess) - New York | |
ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 | 28 February 2007 | Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 | Fitness for Duty |
JAFP-07-0013, License Renewal Application, Amendment 4, Response to Request for Additional Information | 29 January 2007 | License Renewal Application, Amendment 4, Response to Request for Additional Information | Safe Shutdown Ultimate heat sink Mission time Grab sample Internal Flooding Squib Zebra Mussel Job Performance Measure Large early release frequency Severe Accident Management Guideline Earthquake Fuel cladding Flow Induced Vibration |
ML070470471 | 1 January 2007 | Great Lakes St. Lawrence Seaway - Ballast Water | |
ML070470432 | 1 January 2007 | Oswego Industrial Directory | |
JAFP-06-0179, JAFNPP - Site Audit Requests - (24) November and December 2006 Monthly Discharge Monitoring Reports | 21 December 2006 | JAFNPP - Site Audit Requests - (24) November and December 2006 Monthly Discharge Monitoring Reports | |
ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 | 29 August 2006 | Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 | Fitness for Duty |
CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee | 13 July 2006 | Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee | Mururoa |
BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005 | 27 February 2006 | Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005 | Fitness for Duty |
ML070470411 | 1 January 2006 | Fws Hydroelectric Licensing | |
BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection | 28 September 2005 | Entergy Nuclear Northeast - Proof of Financial Protection | |
ML063620170 | 27 September 2005 | JAFNPP Er Ref 8-5 FHA User Guidelines | |
BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 2005 | 29 August 2005 | Fitness-for-Duty Program Performance Report for the Period January - June 2005 | Fitness for Duty |
JAFP-05-0126, Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models | 17 August 2005 | Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models | |
BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 2004 | 28 February 2005 | Fitness-for-Duty Program Performance Report for the Period July - December 2004 | Fitness for Duty |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
JAFP-04-0159, Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report | 27 September 2004 | Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report | Safe Shutdown Fire Barrier Power Uprate |
ML070390585 | 1 September 2004 | International Joint Commission, 12th Biennial Report Great Lakes Water Quality | Zebra Mussel |
ML063620144 | 31 January 2004 | JAFNPP Er Ref 8-16, DOE Eia Annual Energy Outlook 2004 | |
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 2003 | 18 August 2003 | Fitness-for-Duty Program Performance Report for Period January - June 2003 | Fitness for Duty Stolen |
ML070160203 | 30 May 2003 | JAFNPP - SEIS Web Reference - Mills Et Al 2003 | Zebra Mussel Veliger |
JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 2002 | 26 February 2003 | Fitness-for-Duty Program Performance Report for the Period July - December 2002 | Fitness for Duty |
JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 2002 | 15 August 2002 | Fitness-for-Duty Program Performance Report for the Period January - June 2002 | Fitness for Duty Accidental discharge Inattentive |
ML070230360 | 13 August 2002 | JAFNPP Condition Reports Bird Deaths |