Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 249 June 2022Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24
RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2521 June 2021Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25
RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)24 February 2021Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)Fitness for Duty
Ultimate heat sink
Non-Destructive Examination
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Finite Element Analysis
Foreign Material Exclusion
Exemption Request
Affidavit
RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies31 December 2019Supplement to Request for License Amendment Regarding Application of Advanced Framatome MethodologiesAnticipated operational occurrence
Affidavit
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.4630 May 2019Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46
BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D11 April 2018Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4DWeld Overlay
Dissimilar Metal Weld
ML17024A03631 December 2016Operating Data Report for 2016Temporary Modification
Biofouling
Power change
Coast down
ML16223A72517 August 2016Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468)FLEX
Fukushima Dai-Ichi
Earthquake
Hardened vent
ML16041A4351 March 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task ForceSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395)13 January 2015Enclosure 3 - Areva Operability Assessment. (CR #2014-7395)Safety Limit Minimum Critical Power Ratio
Operability Assessment
BSEP 14-0131, Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident18 December 2014Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi AccidentHigh Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
Power Operated Valves
ML14297A26624 October 2014Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14GOTHIC
BSEP 14-0101, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors4 September 2014Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
BSEP 14-0093, Report of 10 CFR 50.59 Evaluations and Commitment Changes14 August 2014Report of 10 CFR 50.59 Evaluations and Commitment ChangesAging Management
License Renewal
Commercial Grade
Control of Heavy Loads
Through-Wall Leak
ML13277A04119 September 2013Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 EditionSafe Shutdown
High winds
Ultimate heat sink
Non-Destructive Examination
Mission time
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Scram Discharge Volume
Large early release frequency
Exemption Request
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 February 2013Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsSafe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Operator Manual Action
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Coast down
BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident27 November 2012Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi AccidentSafe Shutdown
Unanalyzed Condition
High Radiation Area
Ultimate heat sink
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Earthquake
Scaffolding
Seismic Walkdown Report
BSEP 12-0128, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation14 November 2012Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 PlantsShutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
Earthquake
BSEP 14-0007, 1707-01-F03, Rev. 3, Operability Assessment (CR2013-8241)8 September 20111707-01-F03, Rev. 3, Operability Assessment (CR#2013-8241)Operability Assessment
BSEP 11-0038, Renewed Facility Operating License and Cycle 20 Core Operating Limits Report8 April 2011Renewed Facility Operating License and Cycle 20 Core Operating Limits ReportSafety Limit Minimum Critical Power Ratio
ML11087125024 March 2011BWR Vessel and Internals Inspection Summaries for Spring 2010 OutagesWeld Overlay
VT-2
Earthquake
EVT-1
Dissimilar Metal Weld
DM weld
BSEP 10-0097, Report of 10 CFR 50.59 Evaluations and Commitment Changes18 August 2010Report of 10 CFR 50.59 Evaluations and Commitment ChangesShutdown Margin
Temporary Modification
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML10193055314 December 2009NEI 07-07 NEI Groundwater Protection Initiative NEI Peer Assessment Report for Brunswick
BSEP 09-0022, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation23 February 2009Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation
BSEP 08-0121, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors24 September 2008Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors
ML0711000068 December 2006Operational Safety Review Team (Osart) Mission and Follow-up Visit ReportSafe Shutdown
Fitness for Duty
Fire Barrier
Water Inventory Control
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Severe Accident Management Guideline
License Renewal
Earthquake
Fire Watch
Power change
Siren
Power Uprate
Thermography
BSEP 06-0095, Report of 10 CFR 50.59 Evaluation and Commitment Changes24 August 2006Report of 10 CFR 50.59 Evaluation and Commitment ChangesOffsite Dose Calculation Manual
Excess Flow Check Valve
Fire Watch
Power change
BSEP 06-0075, Groundwater Questionnaire28 July 2006Groundwater QuestionnaireOffsite Dose Calculation Manual
ML06144048718 May 2006Submittal of 10-O Report for Quarterly Period Ending March 31, 2006
BSEP 05-0137, Core Operating Limits Report, Revision 2, Cycle 1514 November 2005Core Operating Limits Report, Revision 2, Cycle 15Anticipated operational occurrence
BSEP 05-0110, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors31 August 2005Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
ML05159033331 May 2005Submittal of 10-Q ReportLicense Renewal
Exemption Request
ML0535300699 May 2005Operational Safety Review Team (Osart) Mission to Brunswick Nuclear Plant 9-25 May 2005Safe Shutdown
Fitness for Duty
Fire Barrier
Water Inventory Control
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Severe Accident Management Guideline
License Renewal
Earthquake
Fire Watch
Power change
Siren
Power Uprate
Thermography
BSEP 05-0018, Occupational Radiation Exposure Report for 200420 April 2005Occupational Radiation Exposure Report for 2004
ML04343013330 November 2004Submital of 10-Q Report
ML04146024619 May 2004Q Report for Period Ending 03/31/2004
ML03247163222 August 2003Submittal of 10-Q ReportBoric Acid
ML03189093610 July 2003Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, CrysEnforcement Discretion
ML0317000276 June 2003Submittal of 10-O ReportBoric Acid
Power Uprate
ML19204A16218 November 1998Enclosure 1 - Staff Evaluation Report of Individual Plant Examination of External Events (IPEEE) Submittal on Brunswick Steam Electric Plant (Bsep), Units 1 and 2