Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20129C32421 October 1996Forwards Response to NEI Proposals Re Three Design Certification IssuesSafe Shutdown
Reactor Vessel Water Level
Exemption Request
Backfit
NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl29 June 1994Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl
ML20149E5229 June 1994Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo
ML20149E51331 May 1994Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed IssuesSafe Shutdown
ML20059E4947 January 1994Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design
ML20058G9931 December 1993Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl
ML20058B04415 November 1993Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs
ML20059K2761 November 1993Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design
ML20059J25829 October 1993Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr SsarHigh Radiation Area
Anticipated operational occurrence
Overexposure
ML20059K32026 October 1993Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units
ML20057C54123 September 1993Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR)
ML20057B94920 September 1993Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection IssuesLicense Renewal
ML20057B60316 September 1993Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWRProbabilistic Risk Assessment
License Renewal
ML20057E94116 September 1993Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm
ML20057A8169 September 1993Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor SysProbabilistic Risk Assessment
License Renewal
ML20057B4389 September 1993Informs of Cancellation of 930928 Meeting W/Ge in Rockville,MdProbabilistic Risk Assessment
License Renewal
ML20056H6477 September 1993Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR DesignLicense Renewal
ML20056E09317 August 1993Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWRLicense Renewal
ML20057D11516 August 1993Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled
ML20056E09216 August 1993Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification ReviewsLicense Renewal
ML20056D93930 July 1993Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWRLicense Renewal
ML20056D06719 July 1993Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWRLicense Renewal
ML20128K27612 February 1993Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of Ssar for ABWR
ML20128H0429 February 1993Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld
ML20128G2609 February 1993Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period
ML20128C20829 January 1993Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR
ML20127P47026 January 1993Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser
ML20127H05315 January 1993Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15
ML20127F64411 January 1993Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRAProbabilistic Risk Assessment
ML20127C0408 January 1993Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule
ML20127B5407 January 1993Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues
ML20127D66529 December 1992Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA IssuesInternal Flooding
ML20127C79928 December 1992Forwards Fax Sent to J Duncan,Requesting Clarification of GE Submittal on PRA Input to Reliability Assurance Program
ML20126F56722 December 1992Notification of 930111-14 Meeting W/Ge in San Jose,Ca to Discuss Insps,Tests,Analyses & Acceptance Criteria for GE Advanced BWR
ML20127D64322 December 1992Forwards Fax to J Duncan of GE Re Areas Needed to Provide Clarification of Draft Ssar Submittal on LOCA Outside Containment
ML20126C09211 December 1992Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Insp,Tests & Analyses for GE ABWR
ML20125A4133 December 1992Notification of 921208-10 Meeting W/Licensee in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapters 3,6,9,10 & 11 of Ssar for ABWR
ML20127P5811 December 1992Forwards 45 ABWR Drawings Re Intersys LOCA Issue.Drawings Received During 921029 Meeting W/Ge
ML20127C6671 December 1992Forwards Fax Sent to J Duncan,Ge That Updates Status of Advanced BWR PRA IssuesInternal Flooding
ML20198E30619 November 1992Summarizes 921110 NRC-NUMARC Meeting in Rockville,Md,To Discuss first-of-a-kind Engineering Planned for Alwr PlantsSafe Shutdown
Ultimate heat sink
Operating Basis Earthquake
Earthquake
ML20127C80416 November 1992Forwards Corrected Guidance on Performance of PRA-based Seismic Margins AnalysisDesign basis earthquake
Earthquake
NUREG-1469, Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-146910 November 1992Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-1469Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Turbine Missile
ML20114A0454 August 1992Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies Mailed in Earlier TransmittalGrab sample
Earthquake
ML20099A93322 July 1992Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies in Earlier TransmittalSafe Shutdown
ML20099B39722 July 1992Forwards Proprietary Amend 21 Reprinted Pages to Correct Disconnects/Discrepancies in Earlier Transmittal.Encl Withheld
ML20098D29921 May 1992Forwards Draft Summary of Advanced BWR Level 1 PRA Updated Results to Be Transmitted to NRC Including,Tabular Breakdown of Core Damage Frequency by Initiating Event & Accident Class
ML20101L0008 May 1992Forwards Proprietary Drafts Re Updated Advanced BWR Std Plant.Encl Withheld
ML20101H2437 May 1992Forwards Draft Tables 19Q.4-1, ABWR Features That Minimize Shutdown Risk & 19QB-2, ABWR Features to Prevent/Mitigate Loss of DHR Precursor Events. Submittal of Table Satisfies Draft SER Item 0-20 Subtasks 1 & 2.Tables Withheld
ML20071L3695 April 1989Advises That Secy 88-248 Will Be Superseded by New Commission Paper on GE Advanced BWR to Be Provided for Review on 890505