|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues ML20024J1891994-10-0404 October 1994 Notification of 941006 Meeting W/Util in Rockville,Md to Discuss Introduction of GE Proposed DCD for Design Certification Rulemaking ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20029D6381994-05-0202 May 1994 Submits Review of ABWR Ts,Amend 34 ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of SSAR & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr SSAR ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20046D1421993-08-0909 August 1993 Forwards Updated List of PRA Insights ML20046B9921993-08-0303 August 1993 Notification of 930812 Meeting W/Nsss Owners Groups on New TS Improvements ML20046C0051993-08-0303 August 1993 Notification of 930819-20 Meeting W/Ge in Rockville,Md to Discuss Section 3.8, Electrical Power Sys, of Draft Proof & Review TSs for ABWR ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20046A5601993-07-22022 July 1993 Submits Daily Highlight Re 930727 Meeting W/Ge in Rockville,Md to Discuss Selected ABWR Tier 1 Info for Five Bldg Design Descriptions & Associated ITAAC ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20045F7521993-06-30030 June 1993 Notification of 930719-23 Meeting W/Util in San Jose,Ca to Discuss Resolution of Differences Between ABWR & Previous Designs on I&C TS ML20045J1541993-06-30030 June 1993 Forwards Faxes from GE Re ABWR PRA Review,W/Respect to Open Item 19.1.6.4-3 on Fire Rated Barriers,Explanation of GE Not Generating Importance Measures for ABWR Fire Analysis,Final Control Bldg Flooding Event Tree & Changes to App 19K ML20045E0551993-06-28028 June 1993 Notification of 930802 Meeting w/DOE,ABB-CE,Westinghouse & Util in Rockville,Md to Discuss Status of Different Vendor Design Review Schedules.Meeting Agenda Encl ML20045E7031993-06-24024 June 1993 Notification of 930707-08 Meeting W/Util in San Jose,Ca to Discuss Util Request to Include Completion Times in ABWR TS ML20045D6021993-06-22022 June 1993 Forwards Fax Sent to J Duncan (GE) Listing Comments of Various Branches Re App K to Chapter 19 of ABWR SSAR ML20045C6711993-06-17017 June 1993 Notification of 930621-24 Meeting W/Util in Livermore,Ca to Discuss Resolution of Differences Between ABWR & Previous Designs on I&C TS ML20044H4911993-06-0404 June 1993 Notification of 930621-24 Meeting W/Ge in San Jose,Ca to Discuss Issues Re Structural Design Review for ABWR ML20045B9841993-06-0404 June 1993 Notification of Cancelled 930621-24 Meeting W/Ge in San Jose,Ca to Discuss Structural Design Review ML20044H4891993-06-0303 June 1993 Notification of 930607-10 Meeting W/Ge in San Jose,Ca to Resolve Remaining Design Related Open Issues for Advanced BWR ML20044H1291993-05-27027 May 1993 Notification of 930602-03 Meeting W/Licensee in Germantown, MD to Formulate Definitions for TSs on I&C for Design Certification of Abwr.Rev 2 (Location Change) ML20044H0021993-05-27027 May 1993 Notification of Location Change for 930602 & 03 Meeting W/Ge in Bethesda,Md to Discuss Advanced BWR TS on Instrumentation & Control.Location Changed from Rockville to Bethesda ML20044G9981993-05-27027 May 1993 Notification of 930602-03 Meeting W/Licensee in Rockville,Md to Formulate Definitions for TSs on I&C for Design Certification of ABWR ML20044H0291993-05-26026 May 1993 Notification of 930603 Meeting w/DOE,C-E,Westinghouse & GE in Rockville,Md to Discuss Status of Different Vendors Design Review Schedules (SECY-93-097).Meeting Agenda Encl ML20036B4781993-05-20020 May 1993 Notification of 930615-16 Meeting W/Ge Nuclear Energy in San Jose,Ca to Provide ACRS sub-committee Opportunity to Gather Info About Concerns & Issues Associated W/Review of GE ABWR SAR & Final SER ML20044D2801993-05-10010 May 1993 Notification of 930513 Meeting W/Ge Nuclear Energy to Discuss Operating Experience Review & Min Inventory of Alarms,Controls & Displays for ABWR ML20045D6131993-04-29029 April 1993 Provides GE Submittal of Structures,Sys & Components to Be Included in ABWR Drap & Orap Programs Based on PSA Insights ML20073R8781993-04-22022 April 1993 Forwards Quarterly Status Rept of Advanced LWR Reviews for Jan-Mar 1993 ML20035F8921993-04-21021 April 1993 Notification of 930226 Meeting W/Ge in Rockville,Md to Discuss Open Items in Severe Accident Closure Review Area ML20035G0091993-04-21021 April 1993 Forwards Fax Sent to GE Discussing GE Internal Flooding Analysis for ABWR ML20035F6891993-04-19019 April 1993 Forwards Fax Sent to J Duncan,Ge Discussing Thoughts Author & Contractor Had on Shutdown Analysis for Advanced BWR ML20035E6531993-04-14014 April 1993 Forwards GE 930326 Fax,Documenting GE Revised ABWR Turbine Bldg Flooding Analysis ML20035F1151993-04-13013 April 1993 Notification of 930519 & 20 Meetings W/Ge in San Jose,Ca to Provide ACRS Subcommittee Opportunity to Tour GE Facility & Resolve Concerns & Issues Associated W/Review of GE Abwr,Sar & Fser.Meeting Canceled ML20035E5361993-04-13013 April 1993 Notification of 930519-20 Meeting W/Ge & ACRS Subcommittee on Advanced BWR in San Jose,Ca to Tour GE Facility & Resolve Concerns & Issues Associated W/Review of GE Advanced BWR SSAR & FSER 1996-10-21
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues ML20024J1891994-10-0404 October 1994 Notification of 941006 Meeting W/Util in Rockville,Md to Discuss Introduction of GE Proposed DCD for Design Certification Rulemaking ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20029D6381994-05-0202 May 1994 Submits Review of ABWR Ts,Amend 34 ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of SSAR & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr SSAR ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20046D1421993-08-0909 August 1993 Forwards Updated List of PRA Insights ML20046B9921993-08-0303 August 1993 Notification of 930812 Meeting W/Nsss Owners Groups on New TS Improvements ML20046C0051993-08-0303 August 1993 Notification of 930819-20 Meeting W/Ge in Rockville,Md to Discuss Section 3.8, Electrical Power Sys, of Draft Proof & Review TSs for ABWR ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20046A5601993-07-22022 July 1993 Submits Daily Highlight Re 930727 Meeting W/Ge in Rockville,Md to Discuss Selected ABWR Tier 1 Info for Five Bldg Design Descriptions & Associated ITAAC ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20045F7521993-06-30030 June 1993 Notification of 930719-23 Meeting W/Util in San Jose,Ca to Discuss Resolution of Differences Between ABWR & Previous Designs on I&C TS ML20045J1541993-06-30030 June 1993 Forwards Faxes from GE Re ABWR PRA Review,W/Respect to Open Item 19.1.6.4-3 on Fire Rated Barriers,Explanation of GE Not Generating Importance Measures for ABWR Fire Analysis,Final Control Bldg Flooding Event Tree & Changes to App 19K ML20045E0551993-06-28028 June 1993 Notification of 930802 Meeting w/DOE,ABB-CE,Westinghouse & Util in Rockville,Md to Discuss Status of Different Vendor Design Review Schedules.Meeting Agenda Encl ML20045E7031993-06-24024 June 1993 Notification of 930707-08 Meeting W/Util in San Jose,Ca to Discuss Util Request to Include Completion Times in ABWR TS ML20045D6021993-06-22022 June 1993 Forwards Fax Sent to J Duncan (GE) Listing Comments of Various Branches Re App K to Chapter 19 of ABWR SSAR ML20045C6711993-06-17017 June 1993 Notification of 930621-24 Meeting W/Util in Livermore,Ca to Discuss Resolution of Differences Between ABWR & Previous Designs on I&C TS ML20044H4911993-06-0404 June 1993 Notification of 930621-24 Meeting W/Ge in San Jose,Ca to Discuss Issues Re Structural Design Review for ABWR ML20045B9841993-06-0404 June 1993 Notification of Cancelled 930621-24 Meeting W/Ge in San Jose,Ca to Discuss Structural Design Review ML20044H4891993-06-0303 June 1993 Notification of 930607-10 Meeting W/Ge in San Jose,Ca to Resolve Remaining Design Related Open Issues for Advanced BWR ML20044H1291993-05-27027 May 1993 Notification of 930602-03 Meeting W/Licensee in Germantown, MD to Formulate Definitions for TSs on I&C for Design Certification of Abwr.Rev 2 (Location Change) ML20044H0021993-05-27027 May 1993 Notification of Location Change for 930602 & 03 Meeting W/Ge in Bethesda,Md to Discuss Advanced BWR TS on Instrumentation & Control.Location Changed from Rockville to Bethesda ML20044G9981993-05-27027 May 1993 Notification of 930602-03 Meeting W/Licensee in Rockville,Md to Formulate Definitions for TSs on I&C for Design Certification of ABWR ML20044H0291993-05-26026 May 1993 Notification of 930603 Meeting w/DOE,C-E,Westinghouse & GE in Rockville,Md to Discuss Status of Different Vendors Design Review Schedules (SECY-93-097).Meeting Agenda Encl ML20036B4781993-05-20020 May 1993 Notification of 930615-16 Meeting W/Ge Nuclear Energy in San Jose,Ca to Provide ACRS sub-committee Opportunity to Gather Info About Concerns & Issues Associated W/Review of GE ABWR SAR & Final SER ML20044D2801993-05-10010 May 1993 Notification of 930513 Meeting W/Ge Nuclear Energy to Discuss Operating Experience Review & Min Inventory of Alarms,Controls & Displays for ABWR ML20045D6131993-04-29029 April 1993 Provides GE Submittal of Structures,Sys & Components to Be Included in ABWR Drap & Orap Programs Based on PSA Insights ML20073R8781993-04-22022 April 1993 Forwards Quarterly Status Rept of Advanced LWR Reviews for Jan-Mar 1993 ML20035F8921993-04-21021 April 1993 Notification of 930226 Meeting W/Ge in Rockville,Md to Discuss Open Items in Severe Accident Closure Review Area ML20035G0091993-04-21021 April 1993 Forwards Fax Sent to GE Discussing GE Internal Flooding Analysis for ABWR ML20035F6891993-04-19019 April 1993 Forwards Fax Sent to J Duncan,Ge Discussing Thoughts Author & Contractor Had on Shutdown Analysis for Advanced BWR ML20035E6531993-04-14014 April 1993 Forwards GE 930326 Fax,Documenting GE Revised ABWR Turbine Bldg Flooding Analysis ML20035F1151993-04-13013 April 1993 Notification of 930519 & 20 Meetings W/Ge in San Jose,Ca to Provide ACRS Subcommittee Opportunity to Tour GE Facility & Resolve Concerns & Issues Associated W/Review of GE Abwr,Sar & Fser.Meeting Canceled ML20035E5361993-04-13013 April 1993 Notification of 930519-20 Meeting W/Ge & ACRS Subcommittee on Advanced BWR in San Jose,Ca to Tour GE Facility & Resolve Concerns & Issues Associated W/Review of GE Advanced BWR SSAR & FSER 1996-10-21
[Table view] |
Text
ft,r k s.C d Q.
/
o, UNITED STATES 8
NUCLEAR P.EGULATORY COMMISSION g
{
t
.. W ASHING T ON, D, C. 20555
's, * * * * * $
December 22, 1992 Docket No.52-001 MEMORANDUM FOR:
Robert C. Pierson, Director Stardardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear keactor ' Regulation FROM:
Thomas H. Boyce, Project Manager Standardization Project Directorate Associate Directorate foe Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF HEETING WITH GE NUCLEAR ENERGY (GE)
DATE & TIME:
January 11-14, 1993 8 a.m. - 4:30 p.m.
LOCATION:
GE Nuclear Energy 175 Curtner Avenue San Jose, California PURPOSE:
To discuss inspections, tests, analyses, and acceptance
~
criter a for the GE advanced boiling water reactor.
- x
~y
.n
- E4001, 9212300401 921222 (s
\\
ADOCK 0520 0
gDR
9 2
December 22, 1992' PARTICIPANTS:*
H8C RE W. Russell W. Burton T. James J. Lyons T. Boyce-et al.
R. Gramm D. Thatcher H. Walker D. Terao-G. Thomas J. Stewart (Original signed by)
Thomas H. B:r.e. ?roject Mana'ger roject Directorate Standardiz.. ion e
Associate Du ectorate for Advanced Reactors-and License Renewal Office of Nuclear Reactor Regulation cc:
See next page
- Meetings between NRC technical staff and applicants or licensees are open-for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC' Staff Policy," 43 Federal Reaister 28058, 6/28/78. Membe,s of-the'public who wish to attend should contact the project manager, Chester Poslusny, at-(301) 504-1132.
DISTRIBUTION:
Central File PDST R/F RPierson JNWilson PDR RBorchardt
-CPoslusny TMurley/FMiraglia,12G18 TBoyce PShea BPerch, BH7 AChaffee, EAB DCrutchfield JMoore, 15B18 EJordan, 3701 ACRS (10)
ETana, 12G18 WTravers P0' Dell, 12E4 LPlisco, 12G18 CMcCracken,801 GGrant,-17G21 WBurton, 801 RGramm, 9Al DThatcher, 7E4 HWalker, 901 DTerao, 7H15 GThomas, 8E23 JStewart, 8H7 0FC:
LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR m.,, 7 J
sEn g
TBoyce:th NAME:
PShea DATE: 12/g)/9s-12p2/92 12 k /92 0FFICIAL RECORD COPY:
DOCUMENT NAME: MTG11114.THB L
e y'
GE Nuclear. Energy -
Docket No.52-001; E
'cc:- Mr. Patrick W. Marriott, Manager' Mr.- ~ Joseph _ Qu' irk L Licensing & Consulting Services GE Nuclear Energy-GE Nuclear Energy General-Electric Company: -_ _
=
-175 Curtner Avenue'.-.
-San Jose, California 1.95125 :
. San Jose, California 95125.
-175 Curtner Avenue, Mail Code-782 o
Mr.: Robert Mitchell
' eneral Electric Company G
-175-Curtner-Avenue
-San Jose, California' 95125 Mr. L. Gifford, Program Manager Regulatory Programs GE Nuclear Energy
~
_12300 Twinbrook Parkway Suite 315<
Rockvillei Maryland.20852 Director, Criteria-& Standards-Division Office of Radiation-. Programs U. S. Environmental Protection Agency 401 M Street, S.W.
Washington,= D.C~.
20460 Mr. Daniel F. Giessing
'U. S.tDepartment of_ Energy NE-42:
Washington, D.C. _-20585 Mr. Steve Goldberg Gudget Examiner 725 17th Street, N.W.
Room 8002--
Washington, D.C.
20503 Mr. Frank A Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 19901-Germantown Road Germantown, Maryland 20874 Mr. Raymond Ng'
- 1776 Eye Street, N.W.
Suite 300
- Washington,-D.C. -20006 Marcus A._-Rowden, Esq. -_
Fried, Frank, Harris, Shriver & Jacobson 2001' Pennsylvania. Avenue, W.W.
-Suite 800_
Washington, D.C.
20004 1
- Jay M. Gutierrez, Esq.
Newman & Holtzinger, P.C.
'1615.L Street, N.W.
Suite 1000 Wash;ngton,_D.C. 20036
. -. =.
.. = =