ML20127C799
ML20127C799 | |
Person / Time | |
---|---|
Site: | 05200001 |
Issue date: | 12/28/1992 |
From: | Kelly G Office of Nuclear Reactor Regulation |
To: | Poslusny C Office of Nuclear Reactor Regulation |
Shared Package | |
ML20127C803 | List: |
References | |
NUDOCS 9301140347 | |
Download: ML20127C799 (1) | |
Similar Documents at 05200001 | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20129C3241996-10-21021 October 1996
[Table view]Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr Ssar ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20128K2761993-02-12012 February 1993 Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of Ssar for ABWR ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20128G2601993-02-0909 February 1993 Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period ML20128C2081993-01-29029 January 1993 Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR ML20127P4701993-01-26026 January 1993 Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser ML20127H0531993-01-15015 January 1993 Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15 ML20127F6441993-01-11011 January 1993 Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRA ML20127C0401993-01-0808 January 1993 Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule ML20127B5401993-01-0707 January 1993 Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues ML20127D6651992-12-29029 December 1992 Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA Issues ML20127C7991992-12-28028 December 1992 Forwards Fax Sent to J Duncan,Requesting Clarification of GE Submittal on PRA Input to Reliability Assurance Program ML20126F5671992-12-22022 December 1992 Notification of 930111-14 Meeting W/Ge in San Jose,Ca to Discuss Insps,Tests,Analyses & Acceptance Criteria for GE Advanced BWR ML20127D6431992-12-22022 December 1992 Forwards Fax to J Duncan of GE Re Areas Needed to Provide Clarification of Draft Ssar Submittal on LOCA Outside Containment ML20126C0921992-12-11011 December 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Insp,Tests & Analyses for GE ABWR ML20125A4131992-12-0303 December 1992 Notification of 921208-10 Meeting W/Licensee in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapters 3,6,9,10 & 11 of Ssar for ABWR ML20127P5811992-12-0101 December 1992 Forwards 45 ABWR Drawings Re Intersys LOCA Issue.Drawings Received During 921029 Meeting W/Ge ML20127C6671992-12-0101 December 1992 Forwards Fax Sent to J Duncan,Ge That Updates Status of Advanced BWR PRA Issues ML20198E3061992-11-19019 November 1992 Summarizes 921110 NRC-NUMARC Meeting in Rockville,Md,To Discuss first-of-a-kind Engineering Planned for Alwr Plants ML20127C8041992-11-16016 November 1992 Forwards Corrected Guidance on Performance of PRA-based Seismic Margins Analysis NUREG-1469, Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-14691992-11-10010 November 1992 Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-1469 ML20114A0451992-08-0404 August 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies Mailed in Earlier Transmittal ML20099A9331992-07-22022 July 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies in Earlier Transmittal ML20099B3971992-07-22022 July 1992 Forwards Proprietary Amend 21 Reprinted Pages to Correct Disconnects/Discrepancies in Earlier Transmittal.Encl Withheld ML20098D2991992-05-21021 May 1992 Forwards Draft Summary of Advanced BWR Level 1 PRA Updated Results to Be Transmitted to NRC Including,Tabular Breakdown of Core Damage Frequency by Initiating Event & Accident Class ML20101L0001992-05-0808 May 1992 Forwards Proprietary Drafts Re Updated Advanced BWR Std Plant.Encl Withheld ML20101H2431992-05-0707 May 1992 Forwards Draft Tables 19Q.4-1, ABWR Features That Minimize Shutdown Risk & 19QB-2, ABWR Features to Prevent/Mitigate Loss of DHR Precursor Events. Submittal of Table Satisfies Draft SER Item 0-20 Subtasks 1 & 2.Tables Withheld ML20071L3691989-04-0505 April 1989 Advises That Secy 88-248 Will Be Superseded by New Commission Paper on GE Advanced BWR to Be Provided for Review on 890505 1996-10-21 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20129C3241996-10-21021 October 1996
[Table view]Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr Ssar ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20128K2761993-02-12012 February 1993 Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of Ssar for ABWR ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20128G2601993-02-0909 February 1993 Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period ML20128C2081993-01-29029 January 1993 Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR ML20127P4701993-01-26026 January 1993 Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser ML20127H0531993-01-15015 January 1993 Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15 ML20127F6441993-01-11011 January 1993 Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRA ML20127C0401993-01-0808 January 1993 Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule ML20127B5401993-01-0707 January 1993 Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues ML20127D6651992-12-29029 December 1992 Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA Issues ML20127C7991992-12-28028 December 1992 Forwards Fax Sent to J Duncan,Requesting Clarification of GE Submittal on PRA Input to Reliability Assurance Program ML20126F5671992-12-22022 December 1992 Notification of 930111-14 Meeting W/Ge in San Jose,Ca to Discuss Insps,Tests,Analyses & Acceptance Criteria for GE Advanced BWR ML20127D6431992-12-22022 December 1992 Forwards Fax to J Duncan of GE Re Areas Needed to Provide Clarification of Draft Ssar Submittal on LOCA Outside Containment ML20126C0921992-12-11011 December 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Insp,Tests & Analyses for GE ABWR ML20125A4131992-12-0303 December 1992 Notification of 921208-10 Meeting W/Licensee in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapters 3,6,9,10 & 11 of Ssar for ABWR ML20127P5811992-12-0101 December 1992 Forwards 45 ABWR Drawings Re Intersys LOCA Issue.Drawings Received During 921029 Meeting W/Ge ML20127C6671992-12-0101 December 1992 Forwards Fax Sent to J Duncan,Ge That Updates Status of Advanced BWR PRA Issues ML20198E3061992-11-19019 November 1992 Summarizes 921110 NRC-NUMARC Meeting in Rockville,Md,To Discuss first-of-a-kind Engineering Planned for Alwr Plants ML20127C8041992-11-16016 November 1992 Forwards Corrected Guidance on Performance of PRA-based Seismic Margins Analysis NUREG-1469, Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-14691992-11-10010 November 1992 Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-1469 ML20114A0451992-08-0404 August 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies Mailed in Earlier Transmittal ML20099A9331992-07-22022 July 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies in Earlier Transmittal ML20099B3971992-07-22022 July 1992 Forwards Proprietary Amend 21 Reprinted Pages to Correct Disconnects/Discrepancies in Earlier Transmittal.Encl Withheld ML20098D2991992-05-21021 May 1992 Forwards Draft Summary of Advanced BWR Level 1 PRA Updated Results to Be Transmitted to NRC Including,Tabular Breakdown of Core Damage Frequency by Initiating Event & Accident Class ML20101L0001992-05-0808 May 1992 Forwards Proprietary Drafts Re Updated Advanced BWR Std Plant.Encl Withheld ML20101H2431992-05-0707 May 1992 Forwards Draft Tables 19Q.4-1, ABWR Features That Minimize Shutdown Risk & 19QB-2, ABWR Features to Prevent/Mitigate Loss of DHR Precursor Events. Submittal of Table Satisfies Draft SER Item 0-20 Subtasks 1 & 2.Tables Withheld ML20071L3691989-04-0505 April 1989 Advises That Secy 88-248 Will Be Superseded by New Commission Paper on GE Advanced BWR to Be Provided for Review on 890505 1996-10-21 |
Text
'l
, 3?ck u 50-00(
December 28, 1992 .
-l NOTE T0:
ChetPop]jusny
. .. /
, PAR,-NRR:
fROM: Glenn d ,y , ' B, DSSA, NRR
SUBJECT:
CLARIFICATIONS FOR THE ABWR PRA INVOLVING PRA-BASLD RAP INPUT !
1 I have enclosed a f ax I sent te Jack Duncan, GE that requests clarification of l GE's submittal on PRA Input to the Reliability Assurance Program. j l
Enclosure:
as stated i
l l
i j_300 *30 l I- n n
'7'g'3' I/djf). g-9301140347 921228 PDR ADOCK 05200001 s g[k A pon I
fh -