ML20101L000
ML20101L000 | |
Person / Time | |
---|---|
Site: | 05200001 |
Issue date: | 05/08/1992 |
From: | Raftery R RELIABILITY ENGINEERING SERVICES |
To: | Fox J RELIABILITY ENGINEERING SERVICES |
Shared Package | |
ML19344C400 | List: |
References | |
NUDOCS 9207060193 | |
Download: ML20101L000 (1) | |
Similar Documents at 05200001 | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20129C3241996-10-21021 October 1996
[Table view]Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr Ssar ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20128K2761993-02-12012 February 1993 Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of Ssar for ABWR ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20128G2601993-02-0909 February 1993 Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period ML20128C2081993-01-29029 January 1993 Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR ML20127P4701993-01-26026 January 1993 Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser ML20127H0531993-01-15015 January 1993 Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15 ML20127F6441993-01-11011 January 1993 Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRA ML20127C0401993-01-0808 January 1993 Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule ML20127B5401993-01-0707 January 1993 Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues ML20127D6651992-12-29029 December 1992 Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA Issues ML20127C7991992-12-28028 December 1992 Forwards Fax Sent to J Duncan,Requesting Clarification of GE Submittal on PRA Input to Reliability Assurance Program ML20126F5671992-12-22022 December 1992 Notification of 930111-14 Meeting W/Ge in San Jose,Ca to Discuss Insps,Tests,Analyses & Acceptance Criteria for GE Advanced BWR ML20127D6431992-12-22022 December 1992 Forwards Fax to J Duncan of GE Re Areas Needed to Provide Clarification of Draft Ssar Submittal on LOCA Outside Containment ML20126C0921992-12-11011 December 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Insp,Tests & Analyses for GE ABWR ML20125A4131992-12-0303 December 1992 Notification of 921208-10 Meeting W/Licensee in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapters 3,6,9,10 & 11 of Ssar for ABWR ML20127P5811992-12-0101 December 1992 Forwards 45 ABWR Drawings Re Intersys LOCA Issue.Drawings Received During 921029 Meeting W/Ge ML20127C6671992-12-0101 December 1992 Forwards Fax Sent to J Duncan,Ge That Updates Status of Advanced BWR PRA Issues ML20198E3061992-11-19019 November 1992 Summarizes 921110 NRC-NUMARC Meeting in Rockville,Md,To Discuss first-of-a-kind Engineering Planned for Alwr Plants ML20127C8041992-11-16016 November 1992 Forwards Corrected Guidance on Performance of PRA-based Seismic Margins Analysis NUREG-1469, Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-14691992-11-10010 November 1992 Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-1469 ML20114A0451992-08-0404 August 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies Mailed in Earlier Transmittal ML20099A9331992-07-22022 July 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies in Earlier Transmittal ML20099B3971992-07-22022 July 1992 Forwards Proprietary Amend 21 Reprinted Pages to Correct Disconnects/Discrepancies in Earlier Transmittal.Encl Withheld ML20098D2991992-05-21021 May 1992 Forwards Draft Summary of Advanced BWR Level 1 PRA Updated Results to Be Transmitted to NRC Including,Tabular Breakdown of Core Damage Frequency by Initiating Event & Accident Class ML20101L0001992-05-0808 May 1992 Forwards Proprietary Drafts Re Updated Advanced BWR Std Plant.Encl Withheld ML20101H2431992-05-0707 May 1992 Forwards Draft Tables 19Q.4-1, ABWR Features That Minimize Shutdown Risk & 19QB-2, ABWR Features to Prevent/Mitigate Loss of DHR Precursor Events. Submittal of Table Satisfies Draft SER Item 0-20 Subtasks 1 & 2.Tables Withheld ML20071L3691989-04-0505 April 1989 Advises That Secy 88-248 Will Be Superseded by New Commission Paper on GE Advanced BWR to Be Provided for Review on 890505 1996-10-21 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20129C3241996-10-21021 October 1996
[Table view]Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr Ssar ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20128K2761993-02-12012 February 1993 Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of Ssar for ABWR ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20128G2601993-02-0909 February 1993 Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period ML20128C2081993-01-29029 January 1993 Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR ML20127P4701993-01-26026 January 1993 Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser ML20127H0531993-01-15015 January 1993 Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15 ML20127F6441993-01-11011 January 1993 Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRA ML20127C0401993-01-0808 January 1993 Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule ML20127B5401993-01-0707 January 1993 Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues ML20127D6651992-12-29029 December 1992 Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA Issues ML20127C7991992-12-28028 December 1992 Forwards Fax Sent to J Duncan,Requesting Clarification of GE Submittal on PRA Input to Reliability Assurance Program ML20126F5671992-12-22022 December 1992 Notification of 930111-14 Meeting W/Ge in San Jose,Ca to Discuss Insps,Tests,Analyses & Acceptance Criteria for GE Advanced BWR ML20127D6431992-12-22022 December 1992 Forwards Fax to J Duncan of GE Re Areas Needed to Provide Clarification of Draft Ssar Submittal on LOCA Outside Containment ML20126C0921992-12-11011 December 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Insp,Tests & Analyses for GE ABWR ML20125A4131992-12-0303 December 1992 Notification of 921208-10 Meeting W/Licensee in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapters 3,6,9,10 & 11 of Ssar for ABWR ML20127P5811992-12-0101 December 1992 Forwards 45 ABWR Drawings Re Intersys LOCA Issue.Drawings Received During 921029 Meeting W/Ge ML20127C6671992-12-0101 December 1992 Forwards Fax Sent to J Duncan,Ge That Updates Status of Advanced BWR PRA Issues ML20198E3061992-11-19019 November 1992 Summarizes 921110 NRC-NUMARC Meeting in Rockville,Md,To Discuss first-of-a-kind Engineering Planned for Alwr Plants ML20127C8041992-11-16016 November 1992 Forwards Corrected Guidance on Performance of PRA-based Seismic Margins Analysis NUREG-1469, Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-14691992-11-10010 November 1992 Submits Advanced Comments for Meeting of ABWR GE & ACRS Re NUREG-1469 ML20114A0451992-08-0404 August 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies Mailed in Earlier Transmittal ML20099A9331992-07-22022 July 1992 Forwards Amend 21 Reprinted Pages to Correct Disconnects/ Discrepancies in Earlier Transmittal ML20099B3971992-07-22022 July 1992 Forwards Proprietary Amend 21 Reprinted Pages to Correct Disconnects/Discrepancies in Earlier Transmittal.Encl Withheld ML20098D2991992-05-21021 May 1992 Forwards Draft Summary of Advanced BWR Level 1 PRA Updated Results to Be Transmitted to NRC Including,Tabular Breakdown of Core Damage Frequency by Initiating Event & Accident Class ML20101L0001992-05-0808 May 1992 Forwards Proprietary Drafts Re Updated Advanced BWR Std Plant.Encl Withheld ML20101H2431992-05-0707 May 1992 Forwards Draft Tables 19Q.4-1, ABWR Features That Minimize Shutdown Risk & 19QB-2, ABWR Features to Prevent/Mitigate Loss of DHR Precursor Events. Submittal of Table Satisfies Draft SER Item 0-20 Subtasks 1 & 2.Tables Withheld ML20071L3691989-04-0505 April 1989 Advises That Secy 88-248 Will Be Superseded by New Commission Paper on GE Advanced BWR to Be Provided for Review on 890505 1996-10-21 |
Text
_ _ _ _ _ - - _ __ _ _ _ . _ . . _ _ - _ _ . .
fra of
-REGULATORY Att0-ANALYSIS SERVICES San Jose, Califqrnia RELIABILITY ENGINEERING SERVICES Hay 8, 1991 cc: J. D. Duncan w/o att A. E. Rogers " "
S. Visweswaran " "
To: J. N. Fox from: R. P. Raftery
Subject:
Updated ABWR Front Line and Support Syste... Fault Trees Attached are drafts of the following updated ABWR fault trees and basic event data files, as well as Chapter 190.6 system description markups for transmittal to the NRC (Glenn Kelly):
o Reactor ', ore Isolation Cooling (RCIC) o High Pressure Core flooders (HPCFA and HPCFB) o Residual Heat Removal (R) M , RHRB, and RHRC) o Core Flooding (LPFL) Mode o Suppression Pool Cooling Mode o Shutdown Cooling Mode o Wetwell and Drywell Spray Subsystem o Automatic Depressurization (ADS) o Electric' Power o Service Water (RCW, R$W, HECW) 0'.0007 J
o Instrumentation
/ [
f(0 ; O f. ,
t 1 f R. P. Raftery, P ncip Engineer
- X(/ 4 ; 6h xvC Reliability Engineering Services ppk M/C 789, Ext. 56144
/ c( j,' /