ML23299A266 | 29 November 2023 | Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 | Safe Shutdown Operator Manual Action Emergency Lighting Fire Protection Program |
ML23165A250 | 31 August 2023 | Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements | Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Fire Protection Program |
ML23201A121 | 7 August 2023 | Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements | Surveillance Frequency Control Program Pressure Boundary Leakage |
ML23130A290 | 26 July 2023 | Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | High Radiation Area Nondestructive Examination |
ML22252A151 | 4 November 2022 | Issuance of Amendment No. 234 Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating | Safe Shutdown High winds Anticipated operational occurrence Cyber Security FLEX Offsite Circuit |
ML22199A294 | 16 August 2022 | Issuance of Amendment No. 233 Removal of Table of Contents from the Technical Specifications | |
ML22069A056 | 18 May 2022 | Issuance of Amendment No. 232 Regarding Revision to the Emergency Plan Related to On-Shift Staffing | |
ML22021B598 | 23 February 2022 | Issuance of Amendment No. 231 Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation | High winds Probabilistic Risk Assessment |
ML21210A247 | 3 September 2021 | Issuance of Amendment No. 230 Revision of Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange | High Radiation Area Safe Shutdown Earthquake Earthquake |
ML21238A386 | 2 September 2021 | Correction to Issuance of Amendment No. 229 Change to Owner Licensee Names | |
ML21095A192 | 20 July 2021 | Issuance of Amendment No. 229 Change to Owner Licensee Names | |
ML21061A078 | 23 April 2021 | Issuance of Amendment No. 228 Regarding Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers | Safe Shutdown Offsite Circuit Fire Protection Program |
ML21053A117 | 8 April 2021 | 1 - Issuance of Amendment No. 227 TS Change Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Based on TSTF-425 | High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Earthquake Offsite Circuit Backfit Power change |
ML20276A149 | 7 December 2020 | Issuance of Amendment No. 226 Extension of Type a and Type C Leak Rate Test Frequencies | Safe Shutdown Probabilistic Risk Assessment Coatings Aging Management Large early release frequency Moisture barrier |
ML19353C500 | 27 February 2020 | Issuance of Amendment No. 224 Revision to Technical Specification 3.3.5, - Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, - | Anticipated operational occurrence |
ML19182A345 | 19 August 2019 | Issuance of Amendment No 222 Revise Technical Specifications to Adopt TSTF Traveler TSTF-529, Clarify Use and Application Rules | Time of Discovery |
ML19100A122 | 31 May 2019 | Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Time Critical Operator Action Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage Power Uprate Measurement Uncertainty Recapture |
ML17166A409 | 28 August 2017 | Issuance of Amendment No. 218, Request to Adopt Emergency Action Level (EAL) Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 | High winds Ultimate heat sink Water Inventory Control Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
ML17024A241 | 24 March 2017 | Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation Schedule | Enforcement Discretion Cyber Security |
ML16179A293 | 3 August 2016 | Issuance of Amendment No. 216, Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | Anticipated operational occurrence Exemption Request Fuel cladding |
ML16081A194 | 15 April 2016 | Issuance of Amendment No. 215, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 Consistent with TSTF-276-A, Revise DG Full Load Rejection Test | |
ML15183A052 | 11 September 2015 | Issuance of Amendment No. 214, Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in Updated Safety Analysis Report | Safe Shutdown Fire Barrier Multiple Spurious Operation Incorporated by reference Fire Protection Program |
ML15203A005 | 28 August 2015 | Redacted, Issuance of Amendment No. 213, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Large-Break Loss-of-Coolant Accident Analysis Methodology (Astrum) | Cyber Security |
ML15169A213 | 28 July 2015 | Issuance of Amendment No. 212, Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation | Reactor Vessel Water Level Functionality Assessment Pressure Boundary Leakage Power change |
ML14209A023 | 14 August 2014 | Issuance of Amendment No. 210, Modify License Condition Related to Approval of Revised Cyber Security Plan Implementation Milestone 8 Completion Date | Cyber Security |
ML14156A246 | 7 August 2014 | Issuance of Amendment No. 209, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Replace Westinghouse Methodologies | Boric Acid |
ML14157A082 | 1 July 2014 | Issuance of Amendment No. 208, Adopt TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using Consolidated Line Item Improvement Process | |
ML13282A534 | 6 December 2013 | Issuance of Amendment No. 207, Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, to Reflect Mass Input Transient Analysis | Stroke time |
ML13282A147 | 2 December 2013 | Issuance of Amendment No. 206, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.10 to Increase Voltage Limit for Diesel Generator Load Rejection Test | Safe Shutdown |
ML13197A210 | 23 August 2013 | Issuance of Amendment No. 205, Revise Fire Protection License Condition and the Updated Safety Analysis Report for a Deviation from Appendix R for Volume Control Tank Outlet Valves | Safe Shutdown Coatings Operator Manual Action Significance Determination Process Thermoset Fire Protection Program |
ML12334A312 | 21 December 2012 | Issuance of Amendment No. 203, Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, to Replace Surveillance Requirement 3.6.6.8 with an Event-Based Frequency | Foreign Material Exclusion |
ML12279A250 | 12 December 2012 | Issuance of Amendment No. 202, Revise Physical Security License Condition and Change to Scope of Milestone 6 for the Cyber Security Plan Implementation Schedule | Cyber Security |
ML12300A309 | 11 December 2012 | Issuance of Amendment No. 201, Revise TS 5.5.9, Steam Generator Program, and TS 5.6.10, Steam Generator Tube Inspection Report for a Permanent Alternate Repair Criteria | Probabilistic Risk Assessment Nondestructive Examination Finite Element Analysis |
ML12318A145 | 5 December 2012 | Issuance of Amendment No. 200, Revision to Technical Specifications (TS) 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power Systems | Offsite Circuit |
ML12289A896 | 19 November 2012 | Issuance of Amendment No. 199, Request to Adopt Technical Specification Task Force Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies Using Consolidated Line Item Improvement Process | Anticipated operational occurrence Nondestructive Examination |
ML110480461 | 19 April 2011 | Issuance of Amendment No. 196, Correction of Typographical Error in Technical Specification 5.7.2, Administrative Controls Related to High Radiation Area | High Radiation Area |
ML110840590 | 6 April 2011 | Issuance of Amendment No. 195, Revise Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criterion | Probabilistic Risk Assessment Nondestructive Examination Finite Element Analysis |
ML110550846 | 30 March 2011 | Issuance of Amendment No. 194, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.2-1 to Identify Functions and Modes for Reactor Trip P-4 Interlock Function | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment |
ML102170335 | 3 November 2010 | Issuance of Amendment No. 190, Revise Technical Specification 3.6.3, Containment Isolation Valves, Limiting Condition for Operation | Safe Shutdown Fire Protection Program |
ML102560498 | 30 September 2010 | Issuance of Amendment No. 189, Revise Updated Safety Analysis Report to Modify Fire Protection Program for Use of Fire-Resistive Electrical Cable | Safe Shutdown Fire Barrier Fire Protection Program |
ML100820517 | 23 July 2010 | Issuance of Amendment No. 188, Revise Technical Specifications for Use of Beacon Power Distribution Monitoring System | |
ML100630013 | 5 March 2010 | Issuance of Amendment No. 187, Revise TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps (Emergency Circumstances) | Anticipated operational occurrence |
ML092750606 | 19 October 2009 | Issuance of Amendment No. 186, Modify Technical Specification 5.5.9, Steam Generator Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for Alternate Repair Criteria | Probabilistic Risk Assessment Nondestructive Examination Finite Element Analysis |
ML091730191 | 7 August 2009 | License Amendment, Issuance of Amendment No. 185, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | |
ML091700296 | 30 July 2009 | Issuance of Amendment 183, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, to Extend the Surveillance Frequency on ESFAS Slave Relays from 92 Days to 18 Months | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Maintenance Rule Program |
ML090960734 | 15 May 2009 | Issuance of Amendment No. 182, Revise Technical Specification 3.5.2, ECCS - Operating, in Accordance with TSTF-325A, ECCS Conditions and Required Actions with <100% Equivalent ECCS Flow | |
ML090610317 | 31 March 2009 | Issuance of Amendment No. 181, Revise Licensing Basis, Modification of the Main Steam and Feedwater Isolation System Controls | Safe Shutdown Anticipated operational occurrence Commercial Grade Dedication Safe Shutdown Earthquake Operating Basis Earthquake Cyber Security Design basis earthquake Earthquake |
ML083430224 | 27 January 2009 | Issuance of Amendment No. 180, Revise Technical Specification Requirements Consistent with TSTF-419, Revision 0, Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR | Post Accident Monitoring Hydrostatic Incorporated by reference Pressure and Temperature Limits Report |
ML083390833 | 24 December 2008 | Issuance of Amendment No. 179, Revise Technical Specifications Related to Control Room Envelope Habitability in Accordance with Technical Specification Task Force (TSTF)-448, Revision 3 | Safe Shutdown Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Functionality Assessment Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Earthquake |
ML082820469 | 20 November 2008 | Renewed Facility Operating License NPF-42 | Safe Shutdown Safeguards Contingency Plan Fire Protection Program |