Letter Sequence Approval |
---|
EPID:L-2022-LLA-0008, Removal of the Table of Contents from the Technical Specifications (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22252A1512022-11-0404 November 2022 Issuance of Amendment No. 234 Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22199A2942022-08-16016 August 2022 Issuance of Amendment No. 233 Removal of Table of Contents from the Technical Specifications ML22069A0562022-05-18018 May 2022 Issuance of Amendment No. 232 Regarding Revision to the Emergency Plan Related to On-Shift Staffing ML22021B5982022-02-23023 February 2022 Issuance of Amendment No. 231 Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21210A2472021-09-0303 September 2021 Issuance of Amendment No. 230 Revision of Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ML21238A3862021-09-0202 September 2021 Correction to Issuance of Amendment No. 229 Change to Owner Licensee Names ML21095A1922021-07-20020 July 2021 Issuance of Amendment No. 229 Change to Owner Licensee Names ML21061A0782021-04-23023 April 2021 Issuance of Amendment No. 228 Regarding Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ML21053A1172021-04-0808 April 2021 1 - Issuance of Amendment No. 227 TS Change Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Based on TSTF-425 ML20276A1492020-12-0707 December 2020 Issuance of Amendment No. 226 Extension of Type a and Type C Leak Rate Test Frequencies ML19353C5002020-02-27027 February 2020 Issuance of Amendment No. 224 Revision to Technical Specification 3.3.5, - Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, - ML19182A3452019-08-19019 August 2019 Issuance of Amendment No 222 Revise Technical Specifications to Adopt TSTF Traveler TSTF-529, Clarify Use and Application Rules ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML17166A4092017-08-28028 August 2017 Issuance of Amendment No. 218, Request to Adopt Emergency Action Level (EAL) Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML17024A2412017-03-24024 March 2017 Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation Schedule ML16179A2932016-08-0303 August 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16081A1942016-04-15015 April 2016 Issuance of Amendment No. 215, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 Consistent with TSTF-276-A, Revise DG Full Load Rejection Test ML15183A0522015-09-11011 September 2015 Issuance of Amendment No. 214, Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in Updated Safety Analysis Report ML15203A0052015-08-28028 August 2015 Redacted, Issuance of Amendment No. 213, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Large-Break Loss-of-Coolant Accident Analysis Methodology (Astrum) ML15169A2132015-07-28028 July 2015 Issuance of Amendment No. 212, Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML14209A0232014-08-14014 August 2014 Issuance of Amendment No. 210, Modify License Condition Related to Approval of Revised Cyber Security Plan Implementation Milestone 8 Completion Date ML14156A2462014-08-0707 August 2014 Issuance of Amendment No. 209, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Replace Westinghouse Methodologies ML14157A0822014-07-0101 July 2014 Issuance of Amendment No. 208, Adopt TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using Consolidated Line Item Improvement Process ML13282A5342013-12-0606 December 2013 Issuance of Amendment No. 207, Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, to Reflect Mass Input Transient Analysis ML13282A1472013-12-0202 December 2013 Issuance of Amendment No. 206, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.10 to Increase Voltage Limit for Diesel Generator Load Rejection Test ML13197A2102013-08-23023 August 2013 Issuance of Amendment No. 205, Revise Fire Protection License Condition and the Updated Safety Analysis Report for a Deviation from Appendix R for Volume Control Tank Outlet Valves ML12334A3122012-12-21021 December 2012 Issuance of Amendment No. 203, Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, to Replace Surveillance Requirement 3.6.6.8 with an Event-Based Frequency ML12279A2502012-12-12012 December 2012 Issuance of Amendment No. 202, Revise Physical Security License Condition and Change to Scope of Milestone 6 for the Cyber Security Plan Implementation Schedule ML12300A3092012-12-11011 December 2012 Issuance of Amendment No. 201, Revise TS 5.5.9, Steam Generator Program, and TS 5.6.10, Steam Generator Tube Inspection Report for a Permanent Alternate Repair Criteria ML12318A1452012-12-0505 December 2012 Issuance of Amendment No. 200, Revision to Technical Specifications (TS) 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power Systems ML12289A8962012-11-19019 November 2012 Issuance of Amendment No. 199, Request to Adopt Technical Specification Task Force Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies Using Consolidated Line Item Improvement Process ML1104804612011-04-19019 April 2011 Issuance of Amendment No. 196, Correction of Typographical Error in Technical Specification 5.7.2, Administrative Controls Related to High Radiation Area ML1108405902011-04-0606 April 2011 Issuance of Amendment No. 195, Revise Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criterion ML1105508462011-03-30030 March 2011 Issuance of Amendment No. 194, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.2-1 to Identify Functions and Modes for Reactor Trip P-4 Interlock Function ML1021703352010-11-0303 November 2010 Issuance of Amendment No. 190, Revise Technical Specification 3.6.3, Containment Isolation Valves, Limiting Condition for Operation ML1025604982010-09-30030 September 2010 Issuance of Amendment No. 189, Revise Updated Safety Analysis Report to Modify Fire Protection Program for Use of Fire-Resistive Electrical Cable ML1008205172010-07-23023 July 2010 Issuance of Amendment No. 188, Revise Technical Specifications for Use of Beacon Power Distribution Monitoring System ML1006300132010-03-0505 March 2010 Issuance of Amendment No. 187, Revise TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Auxiliary Feedwater - Trip of All Main Feedwater Pumps (Emergency Circumstances) ML0927506062009-10-19019 October 2009 Issuance of Amendment No. 186, Modify Technical Specification 5.5.9, Steam Generator Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for Alternate Repair Criteria ML0917301912009-08-0707 August 2009 License Amendment, Issuance of Amendment No. 185, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0917002962009-07-30030 July 2009 Issuance of Amendment 183, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, to Extend the Surveillance Frequency on ESFAS Slave Relays from 92 Days to 18 Months ML0909607342009-05-15015 May 2009 Issuance of Amendment No. 182, Revise Technical Specification 3.5.2, ECCS - Operating, in Accordance with TSTF-325A, ECCS Conditions and Required Actions with <100% Equivalent ECCS Flow ML0906103172009-03-31031 March 2009 Issuance of Amendment No. 181, Revise Licensing Basis, Modification of the Main Steam and Feedwater Isolation System Controls ML0834302242009-01-27027 January 2009 Issuance of Amendment No. 180, Revise Technical Specification Requirements Consistent with TSTF-419, Revision 0, Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR ML0833908332008-12-24024 December 2008 Issuance of Amendment No. 179, Revise Technical Specifications Related to Control Room Envelope Habitability in Accordance with Technical Specification Task Force (TSTF)-448, Revision 3 ML0828204692008-11-20020 November 2008 Renewed Facility Operating License NPF-42 2023-08-07
[Table view] Category:Safety Evaluation
MONTHYEARML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23256A2882023-09-20020 September 2023 Authorization and Safety Evaluation for Alternative Request No. I4R-08 ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22252A1512022-11-0404 November 2022 Issuance of Amendment No. 234 Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22199A2942022-08-16016 August 2022 Issuance of Amendment No. 233 Removal of Table of Contents from the Technical Specifications ML22069A0562022-05-18018 May 2022 Issuance of Amendment No. 232 Regarding Revision to the Emergency Plan Related to On-Shift Staffing ML22021B5982022-02-23023 February 2022 Issuance of Amendment No. 231 Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21210A2472021-09-0303 September 2021 Issuance of Amendment No. 230 Revision of Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ML21095A1922021-07-20020 July 2021 Issuance of Amendment No. 229 Change to Owner Licensee Names ML21061A0782021-04-23023 April 2021 Issuance of Amendment No. 228 Regarding Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ML21053A1172021-04-0808 April 2021 1 - Issuance of Amendment No. 227 TS Change Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Based on TSTF-425 ML20276A1492020-12-0707 December 2020 Issuance of Amendment No. 226 Extension of Type a and Type C Leak Rate Test Frequencies ML20302A0802020-10-30030 October 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20111A3372020-04-27027 April 2020 Request from Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-666-1 ML19353C5002020-02-27027 February 2020 Issuance of Amendment No. 224 Revision to Technical Specification 3.3.5, - Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, - ML19291A0182019-11-12012 November 2019 Request for Relief I4R-07, Utilize Code Case N-513-4 - Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping of American Society of Mechanical Engineers Boiler and Pressure Code Section XI ML19182A3452019-08-19019 August 2019 Issuance of Amendment No 222 Revise Technical Specifications to Adopt TSTF Traveler TSTF-529, Clarify Use and Application Rules ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML19052A5462019-04-0101 April 2019 Issuance of Amendment No. 220 Revision to the Emergency Plan ML18334A0132018-12-12012 December 2018 Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code Case N-666-1 ML18283A0492018-10-18018 October 2018 Request for Relief I4R-6 from ASME Code Visual Examination Requirements for Reactor Vessel Head Penetration Nozzle Weld Specified by Code Case N-729-4 ML18040A6662018-03-12012 March 2018 Letter, Order, and Safety Evaluation Order Approving Indirect Transfer of Control of Renewed Facility Operating License No. NPF-42 ML17166A4092017-08-28028 August 2017 Issuance of Amendment No. 218, Request to Adopt Emergency Action Level (EAL) Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML17144A0092017-08-0202 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17202E9192017-08-0202 August 2017 Relief Request 14R-05 from Certain Pressure Test Requirements of the ASME Code for Reactor Pressure Vessel Leak-Off Lines for the Fourth 10 Year Inservice Inspection Interval ML17024A2412017-03-24024 March 2017 Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation Schedule ML16320A0322016-11-30030 November 2016 Request for Relief I4R-, Alternative Risk-Informed Methodology in Selecting Class 1 and 2 Piping Welds, for the Fourth 10-Year Inservice Inspection Interval ML16179A2932016-08-0303 August 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16179A4432016-08-0202 August 2016 Safety Evaluation, Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16081A1942016-04-15015 April 2016 Issuance of Amendment No. 215, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 Consistent with TSTF-276-A, Revise DG Full Load Rejection Test ML15183A0522015-09-11011 September 2015 Issuance of Amendment No. 214, Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in Updated Safety Analysis Report ML15203A0052015-08-28028 August 2015 Redacted, Issuance of Amendment No. 213, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Large-Break Loss-of-Coolant Accident Analysis Methodology (Astrum) ML15169A2132015-07-28028 July 2015 Issuance of Amendment No. 212, Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15190A2022015-07-13013 July 2015 Relief Request 13R-12, Extension of the Third Inservice Inspection Program Interval to Perform Reactor Vessel Stud Hole Ligament Examinations ML15134A0022015-05-15015 May 2015 Relief Request Nos. 4PR-01 and 4PR-02 and Withdrawal of 4VR-02, Alternative to Requirements of ASME Code Case OMN-21 and OM Code ISTB-3510(b)(1) for Pumps, Fourth 10-Year Inservice Testing Program ML15040A0202015-02-12012 February 2015 Relief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code, Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval ML15023A2202015-01-28028 January 2015 Relief Request 13R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220 for the Third 10-Year Inservice Inspection Interval ML14321A8642014-12-10010 December 2014 Relief Requests 13R-08, Reactor Pressure Vessel (RPV) Interior Attachments and 13R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval ML14209A0232014-08-14014 August 2014 Issuance of Amendment No. 210, Modify License Condition Related to Approval of Revised Cyber Security Plan Implementation Milestone 8 Completion Date ML14156A2462014-08-0707 August 2014 Issuance of Amendment No. 209, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Replace Westinghouse Methodologies ML14157A0822014-07-0101 July 2014 Issuance of Amendment No. 208, Adopt TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using Consolidated Line Item Improvement Process ML13282A5342013-12-0606 December 2013 Issuance of Amendment No. 207, Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, to Reflect Mass Input Transient Analysis ML13282A1472013-12-0202 December 2013 Issuance of Amendment No. 206, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.10 to Increase Voltage Limit for Diesel Generator Load Rejection Test ML13197A2102013-08-23023 August 2013 Issuance of Amendment No. 205, Revise Fire Protection License Condition and the Updated Safety Analysis Report for a Deviation from Appendix R for Volume Control Tank Outlet Valves ML13109A2342013-07-12012 July 2013 Safety Evaluation Regarding Wolf Creek Generating Station - Loss of Offsite Power and Augmented Inspection, Issue for Resolution 2012-004 ML13149A1712013-06-0303 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13078A1552013-03-20020 March 2013 License Amendment Request to Change Diesel Generator Surveillance Requirements ML12353A2412013-01-0404 January 2013 Relief Request I3R-07 from ASME Code Case N-729-1 for Examination of Reactor Vessel Head Penetration Welds, for Remainder of Third 10-Year Inservice Inspection Interval 2023-09-20
[Table view] |
Text
August 16, 2022 Mr. Cleveland Reasoner Chief Executive Officer and Chief Nuclear Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION, UNIT 1 - ISSUANCE OF AMENDMENT NO. 233 RE: REMOVAL OF TABLE OF CONTENTS FROM THE TECHNICAL SPECIFICATIONS (EPID L-2022-LLA-0008)
Dear Mr. Reasoner:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 233 to Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station, Unit 1 (Wolf Creek). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated January 12, 2022.
The amendment removes the Table of Contents from the Wolf Creek TSs and places it under licensee control.
A copy of the related Safety Evaluation is enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA Bhagwat Jain for/
Samson S. Lee, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosures:
- 1. Amendment No. 233 to NPF-42
- 2. Safety Evaluation cc: Listserv
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION, UNIT 1 DOCKET NO. 50-482 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 233 License No. NPF-42
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Wolf Creek Generating Station, Unit 1 (the facility) Renewed Facility Operating License No. NPF-42 filed by the Wolf Creek Nuclear Operating Corporation (the Corporation), dated January 12, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-42 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 229, both of which are attached hereto, are hereby incorporated in the license. The Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Jennifer L. Jennifer L. Dixon-Herrity Date: 2022.08.16 Dixon-Herrity 15:09:25 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: August 16, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 233 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-42 WOLF CREEK GENERATING STATION, UNIT 1 DOCKET NO. 50-482 Replace the following pages of Renewed Facility Operating License No. NPF-42 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating License REMOVE INSERT 4 4 Technical Specifications REMOVE INSERT i ---
ii ---
iii ---
iv ---
4 (5) The Operating Corporation, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) The Operating Corporation, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission, now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The Operating Corporation is authorized to operate the facility at reactor core power levels not in excess of 3565 megawatts thermal (100%
power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 229, both of which are attached hereto, are hereby incorporated in the license. The Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions Evergy Kansas South, Inc. and Evergy Metro, Inc. shall comply with the antitrust conditions delineated in Appendix C to this license.
(4) Environmental Qualification (Section 3.11, SSER #4, Section 3.11, SSER #5)*
Deleted per Amendment No. 141.
- The parenthetical notation following the title of many license conditions denotes the section of the supporting Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-42 Amendment No. 233
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 233 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-42 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION, UNIT 1 DOCKET NO. 50-482
1.0 INTRODUCTION
By application dated January 12, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22012A217), Wolf Creek Nuclear Operating Corporation (the licensee) requested changes to the Technical Specifications (TSs) for Wolf Creek Generating Station, Unit 1 (Wolf Creek).
The proposed amendment removes the Table of Contents (TOC) from the Wolf Creek TSs and places it under licensee control.
2.0 REGULATORY EVALUATION
The NRCs regulatory requirements related to the content of the TSs are contained in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36. Paragraph 50.36(a)(1) requires, in part, that an application for an operating license to include proposed TSs. The regulations in 10 CFR 50.36 require that the TSs include items in the following five categories: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls.
3.0 TECHNICAL EVALUATION
The NRC staff evaluated the licensees application to determine if the proposed changes are consistent with the regulations discussed in section 2.0 of this safety evaluation. The TOC is a list which provides information as to where (i.e., page number) specific TS sections can be found and does not contain any technical information. The NRCs regulations at 10 CFR 50.36 do not require a TOC and/or a list of effective pages to be included in the TSs. Additionally, the removal of the TOC and the effective pages list from the TSs will not affect the operation, physical configuration, or function of plant equipment or systems. The NRC staff finds that (1) the licensees proposed change to remove the TOC from the TSs as well as remove the effective pages list and transfer them to licensee control of the changes, is administrative in nature, and (2) the requirements of 10 CFR 50.36 will continue to be met. As such, the NRC staff finds that removal of the TOC from the Wolf Creek TSs is acceptable.
Enclosure 2
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Kansas State official was notified of the proposed issuance of the amendment on July 27, 2022 (ADAMS Accession No. ML22208A132). The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes requirements with respect to recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on February 22, 2022 (87 FR 9654), and there has been no public comment on such finding.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Josh Wilson Date: August 16, 2022
ML22199A294 *via memo dated OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/STSB/BC OGC - NLO NAME BJain PBlechman VCusumano LShrum DATE 7/18/2022 7/20/2022 4/18/2022 8/15/2022 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JDixon-Herrity SLee (BJain for)
DATE 8/15/2022 8/16/2022