 Issue dateTitleTopic
ML24026A29626 January 2024Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, .
JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications14 December 2023License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical SpecificationsTime of Discovery
High Radiation Area
Water Inventory Control
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
ML23265A15022 September 2023License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities
ML23255A09512 September 2023Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement8 September 2023and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement
JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis31 August 2023Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisRecently irradiated fuel
ML23151A34721 August 2023Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each PenetrationReactor Vessel Water Level
Post Accident Monitoring
RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation21 August 2023Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation InstrumentationSafe Shutdown
Reactor Vessel Water Level
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Earthquake
Recently irradiated fuel
NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation18 August 2023License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation
JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis3 August 2023License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisUltimate heat sink
Stroke time
Qualified Offsite Circuit
Time Critical Operator Action
Fuel cladding
Recently irradiated fuel
Offsite Circuit
ML23212B10531 July 2023Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - ReviseReactor Vessel Water Level
Surveillance Frequency Control Program
Exemption Request
Recently irradiated fuel
ML23212B23631 July 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC DocumentsSafe Shutdown
Time of Discovery
Anticipated operational occurrence
Post Accident Monitoring
Squib
Cyber Security
Incorporated by reference
Feedwater Controller Failure
Large early release frequency
Fuel cladding
Coast down
JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance28 July 2023License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower ToleranceAnticipated operational occurrence
JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation28 June 2023License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) InstrumentationAnticipated operational occurrence
Surveillance Frequency Control Program
ML23177A22426 June 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection .Safe Shutdown
Post Accident Monitoring
Probabilistic Risk Assessment
Operator Manual Action
Scram Discharge Volume
Excess Flow Check Valve
Affidavit
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling25 May 2023Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingHydrostatic
Surveillance Frequency Control Program
ML23143A34223 May 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection SystemExemption Request
ML23103A33413 April 2023Submittal of Changes to Technical Specifications BasesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Grab sample
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Internal Flooding
Hydrostatic
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Excess Flow Check Valve
Fast acting solenoid valve
Operability Determination
Battery sizing
Overtravel
Control of Heavy Loads
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Scaffolding
Unidentified leakage
Failure to Scram
ML23095A2235 April 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human FactorsSafe Shutdown
Post Accident Monitoring
Probabilistic Risk Assessment
Operator Manual Action
Scram Discharge Volume
Minimum staff
Affidavit
ML23073A21822 March 2023Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic RequirementsSafe Shutdown
Half scram
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Temporary Modification
Abnormal operational transient
Earthquake
RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements7 March 2023Exigent Amendment Request to Revise Design Basis Related to Seismic RequirementsHalf scram
Anticipated operational occurrence
Safe Shutdown Earthquake
Temporary Modification
Abnormal operational transient
Earthquake
RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air1 March 2023Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting AirSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Nonconservative Technical Specifications
Fuel cladding
ML23005A00823 February 2023Technical Specifications to Correct Non-conservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.G (EPID L 2020 Lla 0034) Amds. 259 and 221Safe Shutdown
Reactor Vessel Water Level
Fire Protection Program
RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing13 January 2023Application to Adopt TSTF-332, ECCS Response Time TestingSurveillance Frequency Control Program
Scram Discharge Volume
Pressure Boundary Leakage
RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report10 January 2023Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportHydrostatic
Pressure and Temperature Limits Report
NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors15 December 2022Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power ReactorsHot Short
Safe Shutdown
High winds
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Large early release frequency
Flooding Focused Evaluation
Turbine Missile
Seismic Walkdown Report
NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b15 December 2022License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Zebra Mussel
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Excess Flow Check Valve
Flooding Focused Evaluation
Earthquake
Turbine Missile
Offsite Circuit
Seismic Walkdown Report
ML22321A10517 November 2022License Amendment Request for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification ChangesSafe Shutdown
Internal Flooding
FLEX
Surveillance Frequency Control Program
Recently irradiated fuel
ML22332A44910 November 2022License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportAnticipated operational occurrence
Hydrostatic
Abnormal operational transient
Pressure and Temperature Limits Report
ML22298A01125 October 2022License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To.Reactor Vessel Water Level
Post Accident Monitoring
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration3 October 2022Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationReactor Vessel Water Level
NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.12 August 2022License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.Surveillance Frequency Control Program
NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage29 June 2022License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage
RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves24 May 2022Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed ValvesHigh Radiation Area
Hydrostatic
Recently irradiated fuel
RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling24 May 2022Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling
NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators24 May 2022License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel GeneratorsSafe Shutdown
Reserve Station Service Transformer
Surveillance Frequency Control Program
Offsite Circuit
RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock7 April 2022Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad AirlockSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Tornado-Generated Missile
Tornado Missile Protection
Fuel cladding
Recently irradiated fuel
ML22055A60124 February 2022License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and ControlsSafe Shutdown
Reactor Vessel Water Level
Surveillance Frequency Control Program
Fuel cladding
ML22055A60024 February 2022License Amendment Request - Proposed Change to Correct Nonconservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.gReactor Vessel Water Level
Nonconservative Technical Specifications
ML22045A48014 February 2022Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance withInternal Flooding
Probabilistic Risk Assessment
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements4 January 2022Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsProcess Control Program
Pressure Boundary Leakage
ML21349B37815 December 2021License Amendment Request Proposed Changes to Technical Specification Surveillance Requirements for Emergency Diesel Generator Frequency and Voltage Tolerances and for Emergency Core Cooling System Pump FlowReactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Surveillance Frequency Control Program
Nonconservative Technical Specifications
Power change
ML21349B36415 December 2021Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in AccordanceSafe Shutdown
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
ML21277A19316 November 2021Enclosure 2, Draft Conforming License AmendmentsSafe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Aging Management
Annual Radioactive Effluent Release Report
Safeguards Contingency Plan
Preemption Authority
License Renewal
Subsequent License Renewal
Fuel cladding
Liquid penetrant
Fire Protection Program
Scaffolding
Unidentified leakage
Power Uprate
RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.54 November 2021Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5Earthquake
ML21181A0574 November 2021Issuance of Amendment No. 344 Adoption of TSTF-545High Radiation Area
Squib
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Pressure Boundary Leakage
Grace period
JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation18 October 2021Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation InstrumentationReactor Vessel Water Level
Surveillance Frequency Control Program
NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements30 September 2021Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Operating Basis Earthquake
Surveillance Frequency Control Program
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Offsite Circuit
Scaffolding
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
Scaffolding
ML21188A02011 August 2021Issuance of Amendment No. 239 One-Time Extension of Containment Type a Integrated Leakage Rate Test FrequencySafe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Coatings
Surveillance Frequency Control Program
Large early release frequency
Coronavirus
COVID-19
Grace period