Issue date | Title | Topic | |
---|---|---|---|
ML17361A187 | 18 December 2017 | Electric Power Research Institute (EPRI) - Transmittal of Revision 1 to Technical Reports MRP-175 and MRP-211 | Safe Shutdown Probabilistic Risk Assessment Functionality Assessment Finite Element Analysis Aging Management Large early release frequency Fuel cladding EVT-1 Flow Induced Vibration |
NG-16-0042, Duane Arnold - Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | 19 February 2016 | Duane Arnold - Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | Hydrostatic Pressure and Temperature Limits Report |
ML16055A126 | 19 February 2016 | Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | Hydrostatic Pressure and Temperature Limits Report |
ML14238A517 | 22 September 2014 | RAIs for EPRI Reports 1022909 and 1025203 Referenced in NEI 12-16 Rev 2 | |
ML13031A349 | 12 March 2013 | New Branch Chief Letter to NEI Regarding Changes to Topical Report Activities and Topics of Interest | |
ML101620010 | 9 August 2010 | Final Safety Evaluation for Nuclear Energy Institute Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) | Weld Overlay |
ML100740466 | 25 March 2010 | Cover Letter: Draft Safety Evaluation for Nuclear Energy Institutes Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)- | Weld Overlay |
ML092370095 | 28 August 2009 | Request for Additional Information Nuclear Energy Institute Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), (MRP-169) (TAC | Non-Destructive Examination Weld Overlay Nondestructive Examination Stress corrosion cracking Dissimilar Metal Weld DM weld |
ML081780682 | 23 June 2008 | Request for Withholding of Commercial Document, Analysis & Evaluation of St. Lucie Unit 1 Natural Circulation Cooldown, Nsac 16. | |
ML080940280 | 7 April 2008 | Request for Additional Information, Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) | Weld Overlay Finite Element Analysis Stress corrosion cracking Dissimilar Metal Weld |
ML062910258 | 21 February 2007 | Request for Additional Information (RAI) Regarding Nuclear Energy Institute (NEI) 94-01, Revision 1J, Industry Guideline for Implementing Performance-Based Option of 10 Code of Federal Regulations (CFR) Part 50, Appendix J & Electric Power | Probabilistic Risk Assessment Large early release frequency Integrated leak rate test License Renewal |
ML070170202 | 8 January 2007 | Transmittal of Re-issue of an Affidavit and Two Documents Titled MRP Review of Implications of Wolf Creek Pressurizer Indications, Dated November 2, 2006 | |
ML063490441 | 28 December 2006 | Cover Letter: Review of MRP-175, Materials Reliability Program: PWR Internals Aging Degradation Mechanism Screening and Threshold Values | |
ML063130183 | 9 November 2006 | Project Manager Change Letter for EPRI and NEI | |
ML070170206 | 2 November 2006 | Request for Withholding Proprietary Documentation of Material: White Paper: MRP Review of Implications of Wolf Creek Pressurizer Indications | Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Through Wall Leak DM weld Affidavit |
ML062050337 | 3 August 2006 | Request for Additional Information Regarding Materials Reliability Program - 169 Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pwrs. | Non-Destructive Examination Weld Overlay License Renewal DM weld |
ML061950468 | 2 August 2006 | Acceptance for Review of Materials Reliability Program: Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs (MRP-169) | Weld Overlay |
ML061720118 | 27 June 2006 | Propriertary Withholding MRP-139, Electric Power Research Institute | |
ML061160021 | 10 May 2006 | Acceptance for Review of (NEI) (Tp) NEI 94-01, Revision 1j, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix, J and EPRI Report 1009325, Revision 1.. | |
ML061290357 | 9 May 2006 | Letter to Mr. Alexander Marion of (NEI) from Michelle C. Honcharik of NRC, Withholding Information from Public Disclosure (Electric Power Research Institute) | |
ML060690261 | 20 April 2006 | Ltr to Mr. Alexander Marion of NEI, Request for Withholding Information from Public Disclosure EPRI MRP-139 | |
ML060310613 | 5 April 2006 | EPRI, Rejection of Topical Report 1008108, Licensing Criteria for Fuel Burnup Extension Beyond 62 Gwd/Tu - Industry Guide, for Review Due to Major Deficiencies | Anticipated operational occurrence |
ML052870232 | 18 October 2005 | Comments Regarding Topical Report TR-1002835 | Probabilistic Risk Assessment |
ML050830425 | 17 March 2005 | 3/17/05 EPRI - Topical Report (TR) 1002865, Topical Report on Reactivity Initiated Accidents: Bases for Ria Fuel Rod Failures and Core Coolability Criteria (Tac. MB4921) | |
ML050680572 | 11 March 2005 | Letter to NEI on Submittal and Request for Fee Waiver |