ML061290357

From kanterella
Jump to navigation Jump to search
Letter to Mr. Alexander Marion of (NEI) from Michelle C. Honcharik of NRC, Withholding Information from Public Disclosure (Electric Power Research Institute)
ML061290357
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 05/09/2006
From: Michelle Honcharik
NRC/NRR/ADRA/DPR/PSPB
To: Marion A
Nuclear Energy Institute
Honcharik M, NRR/DPR/PSPBPM, 415-1774
Shared Package
ML061290407 List:
References
Download: ML061290357 (4)


Text

May 9, 2006 Mr. Alexander Marion, Senior Director Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (ELECTRIC POWER RESEARCH INSTITUTE)

Dear Mr. Marion:

By letter dated January 12, 2006, you submitted an affidavit dated December 8, 2005, executed by Mr. David J. Modeen of Electric Power Research Institute (EPRI), requesting that the EPRI documentation, "Materials Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guideline (MRP-139)" be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. A nonproprietary version of MRP-139 was provided.

By letter dated April 20, 2006, the NRC informed you of its determination following review of the affidavit. The NRC stated that it did not believe the affidavit contained sufficient basis to justify that Sections 1.2, 5, and 6 of MRP-139 should be withheld from the public as proprietary. Our letter also indicated that, in accordance with 10 CFR 2.390(c), the information sought to be withheld will be placed in the NRC's Public Document Room 30 days after receipt of the NRC letter unless an amended affidavit was provided or the information requested to be withheld was withdrawn.

As noted in the April 20, 2006, letter, the NRC staff believes that MRP-139 has contributed to the basis for the NRC's regulatory approach to address primary water stress corrosion cracking in primary system piping butt welds, which will be publicly available. Subsequent to issuing the April 20, 2006, letter, the NRC staff began to consider information that can be provided to supplement the publicly available information in MRP-139 and the NRC's regulatory approach.

Based on this consideration, the NRC staff has determined that continued review of your January 12, 2006, request is warranted. As a result, you are not required to respond to our

April 20, 2006, letter at this time. The NRC will inform you of its determination regarding your request for withholding certain sections of MRP-139 from public disclosure within approximately two months.

If you have any questions regarding this matter, I may be reached at 301-415-1774.

Sincerely,

/RA/

Michelle C. Honcharik, Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page

April 20, 2006, letter at this time. The NRC will inform you of its determination regarding your request for withholding certain sections of MRP-139 from public disclosure within approximately two months.

If you have any questions regarding this matter, I may be reached at 301-415-1774.

Sincerely,

/RA/

Michelle C. Honcharik, Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrDprPspb RidsNrrLADBaxley RidsNrrPMMHoncharik RidsOgcMailRoom RidsNrrDciCpnb RidsAcrsAcnwMailCenter RidsNrrDprPfpb JGolla ADAMS ACCESSION NO.: ML061290357 NRR-084 OFFICE PSPB/PM PSPB/LA CPNB/BC OGC PSPB/BC(A)

NAME MHoncharik DBaxley TChan TRothschild JPeralta DATE 5/9/06 5/9/06 5/9/06 5/9/06 5/9/06 E:\Filenet\ML061290357.wpd OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Senior Director Ms. Barbara Lewis Risk Regulation Assistant Editor Nuclear Energy Institute Platts, Principal Editorial Office 1776 I Street, NW, Suite 400 1200 G St., N.W., Suite 1100 Washington, DC 20006-3708 Washington, DC 20005 Mr. H. A. Sepp, Manager Mr. Gary Welsh Regulatory and Licensing Engineering Institute of Westinghouse Electric Company Nuclear Power Operations P. O. Box 355 Suite 100 Pittsburgh, PA 15230-0355 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. James Davis, Director Operations Mr. David J. Modeen Nuclear Energy Institute Vice President and Chief Nuclear Officer 1776 I Street, NW, Suite 400 EPRI Washington, DC 20006-3708 1300 W. T. Harris Boulevard Charlotte, NC 28262 Mr. Charles B. Brinkman Washington Operations Mr. James Lang, Director ABB-Combustion Engineering, Inc. EPRI 12300 Twinbrook Parkway, Suite 330 1300 W.T. Harris Boulevard Rockville, MD 20852 Charlotte, NC 28262 Mr. Pedro Salas Mr. Warren Bilanin, Director Regulatory Assurance Manager - Dresden EPRI Exelon Generation Company, LLC 3412 Hillview Avenue 6500 N. Dresden Road Palo Alto, CA 94304 Morris, IL 60450-9765 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036