MONTHYEARML24204A2162024-07-22022 July 2024 Withdrawal of Fee Exemption Request for Endorsement of NEI White Paper, “Selection of a Seismic Scenario for an EPZ Boundary Determination” ML24204A2082024-07-22022 July 2024 07-22-24_NRC_NEI Withdrawal of Fee Exemption Request for Wp Selection of Seismic Scenario for EPZ Determination ML24187A0552024-07-0303 July 2024 Fee Exemption Request for NEI White Paper Selection of Seismic Scenario for EPZ Determination ML24173A2712024-06-14014 June 2024 NEI - Proposed Changes to Inspection Procedure (IP) 71130.10, Cybersecurity ML24165A0862024-06-13013 June 2024 NEI White Paper - Proposed Control Room Dose Acceptance Criteria Supporting RG 1.183 R2 ML24165A0852024-06-13013 June 2024 NEI White Paper - Impact of Higher Source Term Fractions on EQ Doses ML24165A0872024-06-12012 June 2024 NEI White Papers Supporting NRC Workshop Discussions Regarding Nuclear Regulatory Commissions (NRC) Potential Changes to Regulatory Guide 1.183 ML24152A3242024-05-31031 May 2024 NEI Concept Paper: Regulation of Rapid High-Volume Deployable Reactors in Remote Locations ML24159A7312024-05-23023 May 2024 05-23-24 Nuclear Energy Institute Letter to the U.S. Nuclear Regulatory Commission Re Industry Comments on Buildings as Items Relied on for Safety ML24135A1982024-04-23023 April 2024 SFAQ No 2022-02, SAE Program Requirements - NEI Withdrawal Letter ML24078A2212024-03-15015 March 2024 3-15-24 NEI Letter Aveil from Juhle on Pur ML24061A0572024-02-29029 February 2024 Endorsement of NEI 08-09, Revision 7, Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML24120A2702023-04-0404 April 2023 Melody Rodridguez NEI Comment on Controlled Unclassified Information ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations ML22195A1662022-07-14014 July 2022 NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML22195A0202022-07-13013 July 2022 07-13-22 NRC Fee Exemption Request for NEI 21-05 Review ML22195A0672022-07-13013 July 2022 Fee Exemption Request for Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 21-05, Reporting Guidance for Licensees with Risk-Informed Licensing Bases ML22159A2772022-06-28028 June 2022 Response Letter to Richard Mogavero for Fee Exemption for the Nuclear Regulatory Commission Review Ad Endorsement of NEI 15-09, Revision 1 ML22153A2782022-06-0202 June 2022 Nie, Fee Exemption Request for Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated May 2022 ML22154A2962022-06-0202 June 2022 LTR from R. Mogavero to M. Sampson Dated Jun 2 2022 Endorsement of NEI 15-09 Cyber Security Event Notifications Rev 1 Dated May 2022 ML22152A2712022-06-0101 June 2022 Digital Instrumentation and Control Common Cause Failure Policy Considerations, Revision 1 2024-07-03
[Table view] |
Text
May 9, 2006 Mr. Alexander Marion, Senior Director Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (ELECTRIC POWER RESEARCH INSTITUTE)
Dear Mr. Marion:
By letter dated January 12, 2006, you submitted an affidavit dated December 8, 2005, executed by Mr. David J. Modeen of Electric Power Research Institute (EPRI), requesting that the EPRI documentation, "Materials Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guideline (MRP-139)" be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. A nonproprietary version of MRP-139 was provided.
By letter dated April 20, 2006, the NRC informed you of its determination following review of the affidavit. The NRC stated that it did not believe the affidavit contained sufficient basis to justify that Sections 1.2, 5, and 6 of MRP-139 should be withheld from the public as proprietary. Our letter also indicated that, in accordance with 10 CFR 2.390(c), the information sought to be withheld will be placed in the NRC's Public Document Room 30 days after receipt of the NRC letter unless an amended affidavit was provided or the information requested to be withheld was withdrawn.
As noted in the April 20, 2006, letter, the NRC staff believes that MRP-139 has contributed to the basis for the NRC's regulatory approach to address primary water stress corrosion cracking in primary system piping butt welds, which will be publicly available. Subsequent to issuing the April 20, 2006, letter, the NRC staff began to consider information that can be provided to supplement the publicly available information in MRP-139 and the NRC's regulatory approach.
Based on this consideration, the NRC staff has determined that continued review of your January 12, 2006, request is warranted. As a result, you are not required to respond to our
April 20, 2006, letter at this time. The NRC will inform you of its determination regarding your request for withholding certain sections of MRP-139 from public disclosure within approximately two months.
If you have any questions regarding this matter, I may be reached at 301-415-1774.
Sincerely,
/RA/
Michelle C. Honcharik, Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page
April 20, 2006, letter at this time. The NRC will inform you of its determination regarding your request for withholding certain sections of MRP-139 from public disclosure within approximately two months.
If you have any questions regarding this matter, I may be reached at 301-415-1774.
Sincerely,
/RA/
Michelle C. Honcharik, Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrDprPspb RidsNrrLADBaxley RidsNrrPMMHoncharik RidsOgcMailRoom RidsNrrDciCpnb RidsAcrsAcnwMailCenter RidsNrrDprPfpb JGolla ADAMS ACCESSION NO.: ML061290357 NRR-084 OFFICE PSPB/PM PSPB/LA CPNB/BC OGC PSPB/BC(A)
NAME MHoncharik DBaxley TChan TRothschild JPeralta DATE 5/9/06 5/9/06 5/9/06 5/9/06 5/9/06 E:\Filenet\ML061290357.wpd OFFICIAL RECORD COPY
Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:
Mr. Anthony Pietrangelo, Senior Director Ms. Barbara Lewis Risk Regulation Assistant Editor Nuclear Energy Institute Platts, Principal Editorial Office 1776 I Street, NW, Suite 400 1200 G St., N.W., Suite 1100 Washington, DC 20006-3708 Washington, DC 20005 Mr. H. A. Sepp, Manager Mr. Gary Welsh Regulatory and Licensing Engineering Institute of Westinghouse Electric Company Nuclear Power Operations P. O. Box 355 Suite 100 Pittsburgh, PA 15230-0355 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. James Davis, Director Operations Mr. David J. Modeen Nuclear Energy Institute Vice President and Chief Nuclear Officer 1776 I Street, NW, Suite 400 EPRI Washington, DC 20006-3708 1300 W. T. Harris Boulevard Charlotte, NC 28262 Mr. Charles B. Brinkman Washington Operations Mr. James Lang, Director ABB-Combustion Engineering, Inc. EPRI 12300 Twinbrook Parkway, Suite 330 1300 W.T. Harris Boulevard Rockville, MD 20852 Charlotte, NC 28262 Mr. Pedro Salas Mr. Warren Bilanin, Director Regulatory Assurance Manager - Dresden EPRI Exelon Generation Company, LLC 3412 Hillview Avenue 6500 N. Dresden Road Palo Alto, CA 94304 Morris, IL 60450-9765 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036