ML061290357

From kanterella
Jump to navigation Jump to search
Letter to Mr. Alexander Marion of (NEI) from Michelle C. Honcharik of NRC, Withholding Information from Public Disclosure (Electric Power Research Institute)
ML061290357
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 05/09/2006
From: Michelle Honcharik
NRC/NRR/ADRA/DPR/PSPB
To: Marion A
Nuclear Energy Institute
Honcharik M, NRR/DPR/PSPBPM, 415-1774
Shared Package
ML061290407 List:
References
Download: ML061290357 (4)


Text

May 9, 2006 Mr. Alexander Marion, Senior Director Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (ELECTRIC POWER RESEARCH INSTITUTE)

Dear Mr. Marion:

By letter dated January 12, 2006, you submitted an affidavit dated December 8, 2005, executed by Mr. David J. Modeen of Electric Power Research Institute (EPRI), requesting that the EPRI documentation, "Materials Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guideline (MRP-139)" be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. A nonproprietary version of MRP-139 was provided.

By letter dated April 20, 2006, the NRC informed you of its determination following review of the affidavit. The NRC stated that it did not believe the affidavit contained sufficient basis to justify that Sections 1.2, 5, and 6 of MRP-139 should be withheld from the public as proprietary. Our letter also indicated that, in accordance with 10 CFR 2.390(c), the information sought to be withheld will be placed in the NRC's Public Document Room 30 days after receipt of the NRC letter unless an amended affidavit was provided or the information requested to be withheld was withdrawn.

As noted in the April 20, 2006, letter, the NRC staff believes that MRP-139 has contributed to the basis for the NRC's regulatory approach to address primary water stress corrosion cracking in primary system piping butt welds, which will be publicly available. Subsequent to issuing the April 20, 2006, letter, the NRC staff began to consider information that can be provided to supplement the publicly available information in MRP-139 and the NRC's regulatory approach.

Based on this consideration, the NRC staff has determined that continued review of your January 12, 2006, request is warranted. As a result, you are not required to respond to our April 20, 2006, letter at this time. The NRC will inform you of its determination regarding your request for withholding certain sections of MRP-139 from public disclosure within approximately two months.

If you have any questions regarding this matter, I may be reached at 301-415-1774.

Sincerely,

/RA/

Michelle C. Honcharik, Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page April 20, 2006, letter at this time. The NRC will inform you of its determination regarding your request for withholding certain sections of MRP-139 from public disclosure within approximately two months.

If you have any questions regarding this matter, I may be reached at 301-415-1774.

Sincerely,

/RA/

Michelle C. Honcharik, Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 cc: See next page DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrDprPspb RidsNrrLADBaxley RidsNrrPMMHoncharik RidsOgcMailRoom RidsNrrDciCpnb RidsAcrsAcnwMailCenter RidsNrrDprPfpb JGolla ADAMS ACCESSION NO.: ML061290357 NRR-084 OFFICE PSPB/PM PSPB/LA CPNB/BC OGC PSPB/BC(A)

NAME MHoncharik DBaxley TChan TRothschild JPeralta DATE 5/9/06 5/9/06 5/9/06 5/9/06 5/9/06 E:\\Filenet\\ML061290357.wpd OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Senior Director Risk Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Company P. O. Box 355 Pittsburgh, PA 15230-0355 Mr. James Davis, Director Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Mr. Pedro Salas Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Mr. Gary Welsh Institute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. David J. Modeen Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262 Mr. James Lang, Director EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262 Mr. Warren Bilanin, Director EPRI 3412 Hillview Avenue Palo Alto, CA 94304