ML063130183

From kanterella
Jump to navigation Jump to search
Project Manager Change Letter for EPRI and NEI
ML063130183
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 11/09/2006
From: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
To: Jeffrey Riley, Vine G
Electric Power Research Institute, Nuclear Energy Institute
Mensah T
References
Download: ML063130183 (3)


Text

November 9, 2006 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector Electric Power Research Institute 2000 L Street, N.W., Suite 805 Washington, DC 20036 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

CHANGE OF U.S. NUCLEAR REGULATORY COMMISSION (NRC) PROJECT MANAGER (PM) FOR THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI) AND THE NUCLEAR ENERGY INSTITUTE ACTIVITIES AND TOPICS OF INTEREST

Dear Sirs:

Effective immediately Mrs. Tanya M. Mensah will assume the responsibilities as the PM for the EPRI and the NEI. Mrs. Mensah may be reached by telephone at 301 415-3610 or electronic mail to tme@nrc.gov. Her NRC mail stop is O-7E1A.

To ensure that all documents are properly captured and profiled in the NRCs Agencywide Documents and Access Management System, we request that all documents submitted to the NRC be addressed as follows:

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 If you require assistance, please contact Mrs. Mensah.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689

Enclosure:

As stated cc w/encl: See next page

November 9, 2006 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector Electric Power Research Institute 2000 L Street, N.W., Suite 805 Washington, DC 20036 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

CHANGE OF U.S. NUCLEAR REGULATORY COMMISSION (NRC) PROJECT MANAGER (PM) FOR THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI) AND THE NUCLEAR ENERGY INSTITUTE ACTIVITIES AND TOPICS OF INTEREST

Dear Sirs:

Effective immediately Mrs. Tanya M. Mensah will assume the responsibilities as the PM for the EPRI and the NEI. Mrs. Mensah may be reached by telephone at 301 415-3610 or electronic mail to tme@nrc.gov. Her NRC mail stop is O-7E1A.

To ensure that all documents are properly captured and profiled in the NRCs Agencywide Documents and Access Management System, we request that all documents submitted to the NRC be addressed as follows:

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 If you require assistance, please contact Mrs. Mensah.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDprPspb PSPB Reading File RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrPMTMensah RidsOgcMailCenter ADAMS ACCESSION NO.: ML063130183 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME TMensah DBaxley SRosenberg DATE 11/9/06 11/09 11/09/06 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Senior Director Ms. Barbara Lewis Risk Regulation Assistant Editor Nuclear Energy Institute Platts, Principal Editorial Office 1776 I Street, NW, Suite 400 1200 G St., N.W., Suite 1100 Washington, DC 20006-3708 Washington, DC 20005 Mr. H. A. Sepp, Manager Mr. Gary Welsh Regulatory and Licensing Engineering Institute of Westinghouse Electric Company Nuclear Power Operations P. O. Box 355 Suite 100 Pittsburgh, PA 15230-0355 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. Jack Roe Nuclear Energy Institute Mr. David J. Modeen 1776 I Street, NW, Suite 400 Vice President and Chief Nuclear Officer Washington, DC 20006-3708 EPRI 1300 W. T. Harris Boulevard Mr. Charles B. Brinkman Charlotte, NC 28262 Washington Operations ABB-Combustion Engineering, Inc. Mr. John Gaertner 12300 Twinbrook Parkway, Suite 330 EPRI Rockville, MD 20852 1300 W.T. Harris Boulevard Charlotte, NC 28262 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Ms. Rosa Yang Sector EPRI EPRI 3412 Hillview Avenue 2000 L Street, NW, Suite 805 Palo Alto, CA 94304 Washington, DC 20036 Mr. Chuck Welty Mr. Pedro Salas EPRI Regulatory Assurance Manager - Dresden 3412 Hillview Avenue Exelon Generation Company, LLC Palo Alto, CA 94304 6500 N. Dresden Road Morris, IL 60450-9765