Letter Sequence RAI |
---|
|
|
MONTHYEARML0807806002008-03-25025 March 2008 Acceptance for Review of Nuclear Energy Institute Topical Report Material Reliability Program Project stage: Acceptance Review ML0809402802008-04-0707 April 2008 Request for Additional Information, Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) Project stage: RAI ML0912105492009-05-13013 May 2009 Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report Material Reliability Program (MRP) Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) Project stage: RAI ML0923700952009-08-28028 August 2009 Request for Additional Information Nuclear Energy Institute Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), (MRP-169) (TAC Project stage: RAI ML1007404662010-03-25025 March 2010 Cover Letter: Draft Safety Evaluation for Nuclear Energy Institutes Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)- Project stage: Draft Approval ML1016604682010-08-0909 August 2010 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pwrs (MRP-169). Project stage: Approval ML1016200102010-08-0909 August 2010 Final Safety Evaluation for Nuclear Energy Institute Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) Project stage: Approval 2009-05-13
[Table View] |
|
---|
Category:Letter
MONTHYEARML24310A0552024-11-0404 November 2024 Comment (001) - Request for Extension of Comment Period from the Nuclear Energy Institute on Part 53 Rulemaking - Risk-Informed Technology-Inclusive Regulatory Framework for Advanced Reactors ML24307A0012024-10-31031 October 2024 Fee Exemption Extension Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems ML24304A3482024-10-29029 October 2024 10-29-24 NEI Letter to NRC Status and Way Forward on NEI 99-04 Revision 1 ML24302A3112024-10-28028 October 2024 NEI Input on Improvements to Licensing and Oversight Programs ML24274A3112024-09-30030 September 2024 Request for NRC Review and Endorsement of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML24255A0702024-09-0909 September 2024 09-09-24_NRC_Industry Timeliness Request Regarding Items Relied Upon for Safety ML24204A2082024-07-22022 July 2024 07-22-24_NRC_NEI Withdrawal of Fee Exemption Request for Wp Selection of Seismic Scenario for EPZ Determination ML24204A2162024-07-22022 July 2024 Withdrawal of Fee Exemption Request for Endorsement of NEI White Paper, Selection of a Seismic Scenario for an EPZ Boundary Determination ML24187A0552024-07-0303 July 2024 Fee Exemption Request for NEI White Paper Selection of Seismic Scenario for EPZ Determination ML24184C1212024-07-0202 July 2024 NEI - Request for NRC Endorsement of NEI 24-05 Revision 0, an Approach for Risk-Informed Performance-Based Emergency Planning ML24173A2712024-06-14014 June 2024 NEI - Proposed Changes to Inspection Procedure (IP) 71130.10, Cybersecurity ML24165A0862024-06-13013 June 2024 NEI White Paper - Proposed Control Room Dose Acceptance Criteria Supporting RG 1.183 R2 ML24165A0852024-06-13013 June 2024 NEI White Paper - Impact of Higher Source Term Fractions on EQ Doses ML24165A0872024-06-12012 June 2024 NEI White Papers Supporting NRC Workshop Discussions Regarding Nuclear Regulatory Commissions (NRC) Potential Changes to Regulatory Guide 1.183 ML24152A3242024-05-31031 May 2024 NEI Concept Paper: Regulation of Rapid High-Volume Deployable Reactors in Remote Locations ML24159A7312024-05-23023 May 2024 05-23-24 Nuclear Energy Institute Letter to the U.S. Nuclear Regulatory Commission Re Industry Comments on Buildings as Items Relied on for Safety ML24135A1982024-04-23023 April 2024 SFAQ No 2022-02, SAE Program Requirements - NEI Withdrawal Letter ML24078A2212024-03-15015 March 2024 3-15-24 NEI Letter Aveil from Juhle on Pur ML24061A0572024-02-29029 February 2024 Endorsement of NEI 08-09, Revision 7, Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23285A3102023-09-27027 September 2023 Request for Withholding of the Following Proprietary Document: 3002018337, Use of Data Validation and Reconciliation Methods for Measurement - Uncertainty Recapture Topical Report, Revision 0-A ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML24120A2702023-04-0404 April 2023 Melody Rodridguez NEI Comment on Controlled Unclassified Information ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML16007A0342016-02-0404 February 2016 Request for Additional Information Related to Benchmarks for Quantifying Fuel Reactivity Depletion Uncertainty and Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation. ML14238A5172014-09-22022 September 2014 RAIs for EPRI Reports 1022909 and 1025203 Referenced in NEI 12-16 Rev 2 ML14197A1712014-07-22022 July 2014 Request for Additional Information Regarding the Review of Nuclear Energy Institute 14-05, Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services, Revision 0 ML1207306592012-03-19019 March 2012 Request for Additional Information #2 for Nuclear Energy Institute TR 09-10, Rev 1, Gas Management ML1203702022012-02-0808 February 2012 Request for Additional Information Regarding the Review of NEI 11-04, Nuclear Generation Quality Assurance Program Description, Draft Revision 0 ML1121406172011-08-0404 August 2011 Request for Additional Information on Topical Report 09-10, Revision 1, Guidelines for Effective Prevention and Management of System Gas Accumulation ML1030101152011-02-0303 February 2011 Request for Additional Information, Related to NEI 10 01, Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit, Revision 0 (Project No. 689; TAC Q00341) ML0933405412009-12-0303 December 2009 Request for Additional Information Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A Supplement 1, Industry Guideline for Implementing the Performance-Based Option of 10 CFR Part 50, Appendix J. ML0923700952009-08-28028 August 2009 Request for Additional Information Nuclear Energy Institute Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), (MRP-169) (TAC ML0912105492009-05-13013 May 2009 Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report Material Reliability Program (MRP) Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) ML0911404832009-04-30030 April 2009 Supplemental Request for Additional Information Regarding Nuclear Energy Institute Technical Report 06-14A, Quality Assurance Program Description, Revision 6 (Project No. 689; TAC Q00014) ML0827403822008-10-23023 October 2008 Request for Additional Information, Topical Report WCAP-16294-NP, Revision 0, Risk-Informed Evaluation of Changes to Technical Specification Required Endstates for Westinghouse NSSS PWRs ML0824607832008-09-17017 September 2008 Enclosure - Request for Additional Information Regarding the Nuclear Energy Institute Quality Assurance Program Description Topical Report No. NEI-06-14A, Revision 5 ML0811301332008-06-0303 June 2008 Request for Additional Information Nuclear Energy Institute (NEI) Topical Report (TR) - 103237, EPRI (EPRI Power Research Institute) MOV (Motor-operated Valve) Performance Prediction Program - Topical Report ML0814002052008-05-19019 May 2008 Request for Additional Information Regarding Nuclear Energy Institute Topical Report 07-03, Generic Final Safety Analysis Report Template Guidance for Radiation Protection Program Description, Revision 5 (Project No. 689; TAC MD5248) ML0809402502008-05-0606 May 2008 Request for Additional Information Regarding Nuclear Energy Institute Topical Report 07-10, Generic Final Safety Analysis Report Template Guidance for Process Control Program, Revision 2 (Project No. 689; TAC MD6860) ML0808701172008-04-28028 April 2008 Request for Additional Information Regarding Nuclear Energy Institute Topical Report Number 07-09, Generic Final Safety Analysis Report Template Guidance for Offsite Dose Calculation Manual Program Description, Revision 1 (Project No. 689; ML0809402802008-04-0707 April 2008 Request for Additional Information, Topical Report Material Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169) ML0725505052007-09-21021 September 2007 NEI, Second Request for Additional Information Regarding Topical Report NEI 07-02, Generic FSAR Template Guidance for Maintenance Rule Program Description Guidance for Plants Licensed Under 10 CFR Part 52, Revision 1 ML0722201292007-08-27027 August 2007 Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report (TR) WCAP-16308-NP, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. ML0721504172007-08-23023 August 2007 Request for Additional Information Regarding Transmittal of NEI 07-02, Generic FSAR Template Guidance for Maintenance Rule Program Description for Plants Licensed Under 10CFR Part 52, Revision 1 ML0714504142007-07-0909 July 2007 Request for Additional Information (RAI) Regarding Topical Report No. NEI 07-03, Generic FSAR Template Guidance for Radiation Protection Program Description, Revision 0 (Project No. 689; TAC MD5248) ML0715501162007-06-13013 June 2007 Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report (TR) WCAP-16294-NP, Rev. 0, Risk-Informed Evaluation of Changes to Technical Specification Required Action Endstates for Westinghouse NSSS PWRs.(MD51 ML0714504802007-05-25025 May 2007 Electronic Mail - Starefos, J L to Andersen R; 05/25/2007; RAI - NEI 07-03, Radiation Protection Program ML0710703702007-04-23023 April 2007 Request for Additional Information (RAI) Regarding Topical Report (TR) -103237, Electric Power Research Institute Motor-Operated Valve Performance Prediction Methodology Software ML0629102582007-02-21021 February 2007 Request for Additional Information (RAI) Regarding Nuclear Energy Institute (NEI) 94-01, Revision 1J, Industry Guideline for Implementing Performance-Based Option of 10 Code of Federal Regulations (CFR) Part 50, Appendix J & Electric Power ML0620503372006-08-0303 August 2006 Request for Additional Information Regarding Materials Reliability Program - 169 Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pwrs. ML0203100562002-01-31031 January 2002 Request for Additional Information on Sequal Topical Report Basis for Adoption of the Experience Based Seismic Equipment Qualification (Ebseq) Methodology by Non A-46 Nuclear Power Plants. 2016-02-04
[Table view] |
Text
August 28, 2009 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RE: NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIAL RELIABILITY PROGRAM (MRP):
TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169)
(TAC NO. MD 8005)
Dear Mr. Riley:
By letter dated September 7, 2005 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML052520325), the Nuclear Energy Institute (NEI) submitted for U.S.
Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) Material Reliability Program (MRP): Technical Basis For Preemptive Weld Overlays For Alloy 82/182 Butt Welds In Pressurized Water Reactors (MRP-169). By letter dated August 3, 2006, the NRC issued a request for additional information (RAI) (ADAMS Accession No. ML062050337). By letter dated January 9, 2008, the NEI provided its response to the RAI (ADAMS Accession Nos.
ML080780299 and ML080780301). By letter dated April 7, 2008, the NRC staff issued a RAI (ADAMS Accession No. ML080940280). By letter dated May 2, 2008, the NEI provided its response to the RAI (ADAMS Accession No. ML082610254).
In addition, by letter dated March 2, 2009 (ADAMS Accession No. ML090690630), the NEI provided an Appendix to TR MRP-169 which provides a set of design and analysis alternatives that can be used for cases in which non-destructive examination procedures can be qualified for the extended optimized weld overlay examination volume for circumferential flaws, but not for axial flaws. Upon review of the information provided, the NRC staff has determined that additional information is needed to complete the review.
J. Riley The purpose of this letter is to formally transmit and request the NEIs written response to the enclosed RAI questions. On August 24, 2009, you and I agreed that the NRC staff will receive your response to the enclosed RAI questions within 45 days of issuance of this letter. If you have any questions regarding the enclosed RAI questions, please contact me at 301-415-3610.
Sincerely,
/RA/
Tanya M. Mensah, Senior Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689
Enclosure:
RAI questions cc w/encl: See next page
J. Riley The purpose of this letter is to formally transmit and request the NEIs written response to the enclosed RAI questions. On August 24, 2009, you and I agreed that the NRC staff will receive your response to the enclosed RAI questions within 45 days of issuance of this letter. If you have any questions regarding the enclosed RAI questions, please contact me at 301-415-3610.
Sincerely,
/RA/
Tanya M. Mensah, Senior Project Manager Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689
Enclosure:
RAI questions cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDpr RidsNrrDprPspb SRosenberg (Hardcopy)
PSPB Reading File RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrTMensah RHardies RidsOgcMailCenter RidsNrrDci RidsNrrDciCpnb ESullivan JTsao EXTERNAL DISTRIBUTION: ewillis@epri.com ADAMS ACCESSION NO.: ML092370095 OFFICE PSPB/PM PSPB/LA CPNB/BC PSPB/BC NAME TMensah DBaxley (CHawes for) TChan SRosenberg (EBowman for) 08/27/09 08/27/09 08/27/09 08/28/09 DATE OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION TOPICAL REPORT (TR) MATERIAL RELIABILITY PROGRAM (MRP):
TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169)
NUCLEAR ENERGY INSTITUTE (NEI)
PROJECT NO. 689 The U.S. Nuclear regulatory Commission (NRC) staff generated the following comments and questions after its review of TR MRP-169, and supplemental provided as discussed in the NEI letters dated May 2, 2008 (ADAMS Accession No. ML082610254), and March 2, 2009 (ADAMS Accession No. ML090690630).
All section, page, table, or figure numbers cited in the questions below refer to items in TR MRP-169, unless specified otherwise.
Questions from NRC Staff
- 1. Section 4.1 of TR MRP-169 specifies the design of the optimized weld overlays (OWOL),
which have less thickness than the full structural weld overlays (FSWOL). Section 4.5 of TR MRP-169 discusses the implication of the weld overlay on leak before break analysis. As implied in Section 4.1, the OWOL is unable, by itself, to satisfy structural integrity design requirements. Instead, the OWOL design requires a portion of the underlying Alloy 82/182 dissimilar metal (DM) weld material to remain intact and carry a portion of the loads. This original weld material is susceptible to cracking. In order to understand potential limitations of OWOLs, the NRC staff has considered the possibility that either the OWOL design or installation process or the associated nondestructive examination (NDE) does not perform as expected and a crack grows in the original weld after the OWOL is applied. During the initial phases of crack growth, bending and residual stress variations and metallurgical inhomogeneity would lead to uneven growth. However, once a portion of a surface crack grew deep enough to encounter the crack resistant overlay material, it would stop growing in the depth direction at that azimuthal location. Other segments of the crack could continue to grow deeper until they also reach the overlay interface. This could continue until the remaining uncracked ligament of original weld material is insufficient to adequately reinforce the OWOL material, at which point the mitigated weld may fail without prior leakage during a design basis event.
In a FSWOL the corrosion and primary water stress-corrosion cracking (PWSCC) resistance of the overlay material can be credited to prevent crack growth into the overlay in the event that a large pre-existing crack was missed by NDE, or in the event that design deficiencies or
misapplication of the FSWOL resulted in unanticipated tensile residual stress fields. If large cracks occur in the original DM weld material under a FSWOL, the FSWOL can withstand full design loading without failing; and the PWSCC resistant material preserves the FSWOL load carrying ability and minimizes the likelihood of pipe rupture. In contrast, if the same deficiency in design or application affects the OWOL, the OWOL material, precisely because it is resistant to PWSCC, can cause small circumferential cracks in the original dissimilar metal weld to grow deep around the entire circumference, in which case the OWOL may become unable to withstand its design loading. In light of this possibility, please explain why application of an OWOL to a DM weld is an appropriate mitigation method and why its application will not invalidate previously approved leak-before- break analyses.
- 2. By letter dated May 2, 2008, the NEI responded to the NRC staffs request for additional information. Under Stress Analysis Question 1, the NRC staff asked the NEI to justify a target stress at the inside surface of 10 ksi. NEI responded that the 10 ksi maximum tensile stress criterion provides protection against primary water stress corrosion cracking (PWSCC).
American Society of Mechanical Engineers (ASME) Code,Section XI, Code Case N-7701 has established that as part of an effective stress improvement mitigation technique, a compressive stress state was required on the wetted surface of all susceptible material for DM weld application. This is consistent with the NRC staff position and was developed, in part, due to the uncertainties in precise finite element stress modeling of the wetted surface of DM welds.
Furthermore, the NRC staff position was not established to define a stress level at which crack initiation could not occur, rather to provide a conservative stress value that along with calculated stress levels throughout the volume of the weld provide a basis for reasonable assurance of structural integrity for a stress improved DM weld.
The NEIs response does not provide sufficient basis to demonstrate that increasing the wetted surface stress limit to 10 ksi would be equivalent to the NRC staff position. The NEI statement that stress corrosion cracking will not initiate on a surface that is below yield stress is not a sufficient basis for this conclusion due to large uncertainties in attempting to precisely model the wetted surface condition of in-service DM welds. Please provide additional basis, including supporting data, analyses and operational experience, to support allowing a wetted surface stress threshold of 10 ksi.
1 ASME Code,Section XI, Code Case N-770, Alternative Examination Requirements and Acceptance Standards for Class 1 PWER Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation ActivitiesSection XI, Division 1, Appendix I.
Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:
Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Mr. John Butler, Director Nuclear Generation Operations Support Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org jcb@nei.org Mr. Jack Roe, Director Mr. James H. Riley, Director Security Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jhr@nei.org Mr. Charles B. Brinkman Mr. Chris Larsen Washington Operations Vice President and Chief Nuclear Officer ABB-Combustion Engineering, Inc. EPRI 12300 Twinbrook Parkway, Suite 330 3412 Hillview Avenue Rockville, MD 20852 Palo Alto, CA 94304-1338 brinkmcb@westinghouse.com cblarsen@epri.com Mr. James Gresham, Manager Mr. David J. Modeen Regulatory Compliance and Plant Licensing Director, External Affairs Westinghouse Electric Company EPRI P.O. Box 355 1300 W. T. Harris Boulevard Pittsburgh, PA 15230-0355 Charlotte, NC 28262-8550 greshaja@westinghouse.com dmodeen@epri.com Ms. Barbara Lewis Dr. Sean Bushart Assistant Editor EPRI Platts, Principal Editorial Office 3412 Hillview Avenue 1200 G St., N.W., Suite 1100 Palo Alto, CA 94304-1338 Washington, DC 20005 sbushart@epri.com Barbara_lewis@platts.com Mr. Kurt Edsinger Mr. Alexander Marion, Vice President EPRI Nuclear Operations 3412 Hillview Avenue Nuclear Energy Institute Palo Alto, CA 94304-1338 1776 I Street, NW, Suite 400 kedsinge@epri.com Washington, DC 20006-3708 am@nei.org Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard
Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com 3/19/08