RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | 5 February 2024 | Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | 8 January 2024 | Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | Packing leak Offsite Dose Calculation Manual Operating Basis Earthquake Exemption Request Earthquake Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation | 14 December 2023 | Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation | Finite Element Analysis Aging Management Stress corrosion cracking Affidavit |
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 4 December 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Exemption Request |
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 November 2023 | RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | 1 November 2023 | Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | Exemption Request Siren |
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | 5 October 2023 | License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | High Radiation Area Fuel cladding |
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | 20 September 2023 | Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | Met Tower Exemption Request |
RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 175 | 14 September 2023 | Registration for Use of General License Spent Fuel Cask Number 175 | |
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | 30 August 2023 | License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | Safe Shutdown Earthquake Stress corrosion cracking License Renewal Fuel cladding Pressure Boundary Leakage Pressure boundary leak Unidentified leakage Affidavit Operational leakage |
RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 | 23 August 2023 | Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 | |
RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks | 22 August 2023 | Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks | |
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination |
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination Weld Overlay Finite Element Analysis |
RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | 12 July 2023 | Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | License Renewal Subsequent License Renewal |
RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 | 10 July 2023 | Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 | |
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | 7 July 2023 | Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | 7 June 2023 | Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | |
RA-23-0139, Registration for Use of General License Spent Fuel Casks | 6 June 2023 | Registration for Use of General License Spent Fuel Casks | |
RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 | 31 May 2023 | Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 | |
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 30 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 2022 | 26 April 2023 | Duke Energy Annual Radiological Environmental Operating Report - 2022 | Time of Discovery Grab sample Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl |
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | 26 April 2023 | Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-23-0046, Annual Radioactive Effluent Release Report - 2022 | 24 April 2023 | Annual Radioactive Effluent Release Report - 2022 | Annual Radioactive Effluent Release Report |
RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval | 24 April 2023 | Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval | Safe Shutdown Boric Acid Mission time Stroke time Nondestructive Examination Incorporated by reference FLEX Large early release frequency Operability Determination Cold shutdown justification Maintenance Rule Program Power Operated Valves Grace period Manual Operator Action |
RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube | 5 April 2023 | Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube | Nondestructive Examination |
RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) | 30 March 2023 | Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) | Decommissioning Funding Plan Authorized possession limits |
RA-23-0036, Biennial Decommissioning Financial Assurance Reports | 30 March 2023 | Biennial Decommissioning Financial Assurance Reports | |
RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations | 30 March 2023 | Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations | Boric Acid Affidavit |
RA-23-0040, Onsite Property Insurance Coverage | 30 March 2023 | Onsite Property Insurance Coverage | |
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 30 March 2023 | 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2 | 24 March 2023 | Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2 | License Renewal Subsequent License Renewal |
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Weld Overlay Hydrostatic Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Unidentified leakage Operational leakage |
RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 | 9 February 2023 | Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 | Boric Acid Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Surveillance Frequency Control Program Operability Determination Earthquake Grace period Backfit GOTHIC |
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | 1 February 2023 | License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-23-0027, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2022 | 30 January 2023 | Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2022 | Annual Radioactive Effluent Release Report |
RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | 30 January 2023 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | Post Accident Monitoring |
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | |
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | 5 December 2022 | Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | |
RA-22-0347, Transmittal of Core Operating Limits Report | 2 December 2022 | Transmittal of Core Operating Limits Report | Shutdown Margin |
RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | 1 November 2022 | Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) | Post Accident Monitoring |
RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 4 October 2022 | Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination Operational leakage |
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | 21 September 2022 | License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. | Surveillance Frequency Control Program Fuel cladding |
RA-22-0261, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks | 15 September 2022 | Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks | |
RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 | 8 September 2022 | Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 | |
RA-22-0252, Registration for Use of General License Spent Fuel Casks | 25 August 2022 | Registration for Use of General License Spent Fuel Casks | |
RA-22-0225, Registration for Use of General License Spent Fuel Cask Numbers 169 and 170 | 11 August 2022 | Registration for Use of General License Spent Fuel Cask Numbers 169 and 170 | |
RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) | 9 August 2022 | Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) | Post Accident Monitoring |