NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation | 1 February 2024 | Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation | |
NMP1L3569, CFR 50.46 Annual Report | 26 January 2024 | CFR 50.46 Annual Report | |
NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station | 14 December 2023 | Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station | Safe Shutdown Health Physics Network Grab sample Offsite Dose Calculation Manual Emergency Lighting Severe Accident Management Guideline Minimum staff Scaffolding Siren Overexposure |
NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements | 7 December 2023 | Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 4 December 2023 | Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 22 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases | 6 October 2023 | Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C | Aging Management |
NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations | 25 August 2023 | Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations | Dissimilar Metal Weld |
NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation | 18 August 2023 | License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation | |
NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . | 4 August 2023 | Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . | Safe Shutdown High winds Reactor Vessel Water Level Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Operator Manual Action FLEX Tornado Missile Protection Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Tornado Missile Risk Evaluator Flooding Focused Evaluation Maintenance Rule Program Offsite Circuit Continuous fire watch Scaffolding |
NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations | 14 July 2023 | Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations | Weld Overlay Moisture barrier Through-Wall Leak |
NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications | 5 July 2023 | Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications | |
NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 9 June 2023 | Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Nondestructive Examination Liquid penetrant Dissimilar Metal Weld DM weld |
NMP1L3523, Annual Radioactive Environmental Operating Report | 12 May 2023 | Annual Radioactive Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Chernobyl |
NMP1L3522, Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report | 30 April 2023 | Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
NMP1L3525, Core Operating Limits Report | 19 April 2023 | Core Operating Limits Report | Safety Limit Minimum Critical Power Ratio |
NMP1L3526, Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication | 13 April 2023 | Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication | Weld Overlay Nondestructive Examination Dissimilar Metal Weld DM weld |
NMP1L3520, Supplemental Information for License Amendment Request Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2 | 4 April 2023 | Supplemental Information for License Amendment Request Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2 | |
NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 30 March 2023 | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 29 March 2023 | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus | 29 March 2023 | Proposed Alternative Associated with a Weld Overlay Repair to the Torus | Weld Overlay |
NMP1L3518, Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 1 | 29 March 2023 | Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 1 | Dissimilar Metal Weld DM weld |
NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 27 March 2023 | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Dissimilar Metal Weld |
NMP1L3513, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 24 March 2023 | Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Coatings Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
NMP1L3499, CFR 50.46 Annual Report | 27 January 2023 | CFR 50.46 Annual Report | |
NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 15 December 2022 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Hot Short Safe Shutdown High winds Reactor Vessel Water Level Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Zebra Mussel Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Excess Flow Check Valve Flooding Focused Evaluation Earthquake Turbine Missile Offsite Circuit Seismic Walkdown Report |
NMP1L3486, Radiological Emergency Plan Document Revision | 15 December 2022 | Radiological Emergency Plan Document Revision | Safe Shutdown Health Physics Network Grab sample Offsite Dose Calculation Manual Emergency Lighting Severe Accident Management Guideline Minimum staff Scaffolding |
NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors | 15 December 2022 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors | Hot Short Safe Shutdown High winds Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi Large early release frequency Flooding Focused Evaluation Turbine Missile Seismic Walkdown Report |
NMP1L3485, Proposed Alternative Associated with a Weld Overlay Repair to the Torus | 8 December 2022 | Proposed Alternative Associated with a Weld Overlay Repair to the Torus | Weld Overlay Liquid penetrant |
NMP2L2823, Supplemental Information for License Amendment Request Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators | 28 October 2022 | Supplemental Information for License Amendment Request Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators | Surveillance Frequency Control Program |
NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates | 15 September 2022 | Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates | Pandemic Coronavirus |
NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. | 12 August 2022 | License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. | Surveillance Frequency Control Program |
NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps | 5 August 2022 | Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps | |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage | 29 June 2022 | License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage | |
NMP1L3465, Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications | 17 June 2022 | Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications | |
NMP1L3462, Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications | 9 June 2022 | Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications | |
NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators | 24 May 2022 | License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators | Safe Shutdown Reserve Station Service Transformer Surveillance Frequency Control Program Offsite Circuit |
NMP2L2811, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations | 13 May 2022 | Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations | |
NMP1L3459, 2021 Annual Radiological Environmental Operating Report | 8 May 2022 | 2021 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Chernobyl |
NMP1L3457, 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 | 30 April 2022 | 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 | Grab sample Offsite Dose Calculation Manual Process Control Program Annual Radiological Effluent Release Report COVID-19 Tritium |
NMP2L2805, Annual Environmental Operating Report | 23 April 2022 | Annual Environmental Operating Report | |
NMP2L2807, Core Operating Limits Report | 7 April 2022 | Core Operating Limits Report | MELLLA |
NMP1L3458, Constellation Energy Generation, LLC, Annual Property Insurance Status Report | 1 April 2022 | Constellation Energy Generation, LLC, Annual Property Insurance Status Report | |
NMP1L3454, Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps | 2 March 2022 | Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps | |
NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | 2 February 2022 | Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Nondestructive Examination VT-2 Foreign Material Exclusion Through-Wall Leakage |
NMP1L3444, CFR 50.46 Annual Report | 27 January 2022 | CFR 50.46 Annual Report | |
NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 | 11 January 2022 | Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 | Stroke time Water Inventory Control |
NMP2L2793, Supplemental Information - Relief Request Associated with Excess Flow Check Valves | 17 December 2021 | Supplemental Information - Relief Request Associated with Excess Flow Check Valves | |
NMP2L2789, Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 | 16 December 2021 | Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 | Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Reserve Station Service Transformer Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Power Operated Valves Fuel cladding Offsite Circuit Scaffolding |