L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | 26 January 2024 | Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | |
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-MT-23-054, Subsequent License Renewal Application Supplement 8 | 11 January 2024 | Subsequent License Renewal Application Supplement 8 | Non-Destructive Examination Coatings Aging Management License Renewal |
L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | 2 January 2024 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | |
L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | 29 December 2023 | License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | Safe Shutdown Shutdown Margin Fire Barrier Anticipated operational occurrence Hydrostatic Coatings Emergency Lighting Pressure and Temperature Limits Report License Renewal Subsequent License Renewal Fire Protection Program |
L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | 20 December 2023 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report |
L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 | 18 December 2023 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 | Offsite Dose Calculation Manual |
L-23-019, Proof of Financial Protection 10 CFR 140.15 | 18 December 2023 | Proof of Financial Protection 10 CFR 140.15 | |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-174, Subsequent License Renewal Application - Third Annual Update | 13 December 2023 | Subsequent License Renewal Application - Third Annual Update | Boric Acid Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal |
L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 11 December 2023 | 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | Power Uprate |
L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 5 December 2023 | Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
L-MT-23-052, Subsequent License Renewal Application Supplement 7 | 30 November 2023 | Subsequent License Renewal Application Supplement 7 | Aging Management License Renewal |
L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-MT-23-051, Update to the Technical Specification Bases | 28 November 2023 | Update to the Technical Specification Bases | |
L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 | 21 November 2023 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 | |
L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | 16 November 2023 | Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | Exemption Request |
L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 | 13 November 2023 | 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 | Grace period |
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | 13 November 2023 | Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | |
L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | 10 November 2023 | License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | Safe Shutdown Surveillance Frequency Control Program |
L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 | 9 November 2023 | Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 | Coatings VT-2 Aging Management Through Wall Leak |
L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 | 3 October 2023 | Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 | Aging Management License Renewal Subsequent License Renewal |
L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 28 September 2023 | License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 3 | 22 September 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 3 | Coatings Aging Management License Renewal Subsequent License Renewal |
L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | 19 September 2023 | License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | Incorporated by reference |
L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy | 11 September 2023 | Baffle Former Bolts Alternate Aging Management Strategy | Aging Management |
L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 | 5 September 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 | Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal Fire Protection Program |
L-MT-23-035, Subsequent License Renewal Application Supplement 5 | 28 August 2023 | Subsequent License Renewal Application Supplement 5 | Finite Element Analysis Aging Management Scram Discharge Volume License Renewal Pressure Boundary Leakage |
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | 17 August 2023 | Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | |
L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 1 | 15 August 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 1 | Hydrostatic Operating Basis Earthquake Incorporated by reference Aging Management License Renewal Dissimilar Metal Weld |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 | 31 July 2023 | 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 | Locked High Radiation Area Test box Scaffolding |
L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 31 July 2023 | 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | Through-Wall Leakage |
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | 24 July 2023 | Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | |
L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | 18 July 2023 | Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | Fire Barrier Hydrostatic Coatings Operating Basis Earthquake Aging Management License Renewal Subsequent License Renewal Power Uprate |
L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT | 14 July 2023 | License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT | Non-Destructive Examination Hydrostatic Liquid penetrant |
L-MT-23-030, Subsequent License Renewal Application Supplement 3 | 4 July 2023 | Subsequent License Renewal Application Supplement 3 | Hydrostatic Fire Protection Program |
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | 29 June 2023 | Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | |
L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | 27 June 2023 | 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | |
L-MT-23-025, Subsequent License Renewal Application Supplement 2 | 26 June 2023 | Subsequent License Renewal Application Supplement 2 | High Radiation Area Fire Barrier Coatings Nondestructive Examination Aging Management Moisture barrier License Renewal Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld |
L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions | 22 June 2023 | License Amendment Request to Revise Technical Specification 3.7.8 Required Actions | Safe Shutdown Probabilistic Risk Assessment |
L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report | 14 June 2023 | 2022 10 CFR 50.46 LOCA Annual Report | |
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | 9 June 2023 | Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | Boric Acid Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Coatings Functionality Assessment Condition Adverse to Quality Aging Management Exemption Request Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Grace period |
L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response | 1 June 2023 | Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response | Aging Management |
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | 22 May 2023 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report | 10 May 2023 | Submittal of 2022 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Earthquake Chernobyl |
L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report | 10 May 2023 | Submittal of 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 | 2 May 2023 | Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 | MELLLA |
L-PI-23-010, Annual Report of Individual Monitoring | 27 April 2023 | Annual Report of Individual Monitoring | |