Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0816501696 June 2008New England Coalition, Inc'S Motion to Late-File Rebuttal Testimony of Ulrich WitteFinite Element Analysis
Condition Adverse to Quality
Aging Management
License Renewal
Power Uprate
Affidavit
ML0816304472 June 2008Entergy'S Supplemental Statement of Position on New England Coalition Contentions 2A/2B of David R. Lewis
ML0816202542 June 2008Filing Discussing a Proprietary Document, in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, IncHydrostatic
Aging Management
ML0816105782 June 2008Transmittal Letter in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc., Filing Discussing a Proprietary Document
ML08128029329 April 2008Corrected Certificate of Service for New England Coalition Inc.'S Initial Statement of Position and Direct Testimony in the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations Inc
ML08240175928 April 2008New England Coalition, Inc. - Contentions 2A and 2B, Volume 1, Prefiled Exhibit NEC-JH_15 (Redacted Version)
ML08240175128 April 2008New England Coalition, Inc. - Contentions 4, Prefiled Exhibits NEC-UW_12 - NEC-UW_22, Volume 3Safe Shutdown
Boric Acid
Non-Destructive Examination
Mission time
Fire Barrier
Weld Overlay
Coatings
Nondestructive Examination
Temporary Modification
Zebra Mussel
Incorporated by reference
Finite Element Analysis
Aging Management
Moisture barrier
Biofouling
Liquid penetrant
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Scaffolding
Flow Induced Vibration
ML08240175028 April 2008New England Coalition, Inc. - Contentions 4, Prefiled Exhibits NEC-JH_53, NEC-RH_03, NEC-UW_03 - NEW-UW_11, Volume 2Safe Shutdown
Boric Acid
Fitness for Duty
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Aging Management
Significance Determination Process
Foreign Material Exclusion
MELLLA
Operability Determination
License Renewal
Control of Heavy Loads
Biofouling
Fire Protection Program
Power Uprate
ML08224037328 April 2008New England Coalition, Inc. - Contentions 2A and 2B, Prefiled Exhibits NEC-JH_03 - NEC-JH_24, Volume 1, (Excluding Prefiled Exhibit NEC-JH_15)Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Dissimilar Metal Weld
ML08224037128 April 2008New England Coalition, Inc. - Contentions 2A and 2B, Prefiled Exhibits NEC-JH_26 - NEC-JH_35, NEC-JH_62, Volume 3Boric Acid
Hydrostatic
Anchor Darling
Finite Element Analysis
Aging Management
Backfit
ML08157060828 April 2008New England Coalition, Inc. Contention 4, Prefiled Exhibits, NEC-JH_36 - NEC-JH_53, NEC_RH_03, NEC-UW_03 - NEC-UW_13, Volume 1Safe Shutdown
Boric Acid
Time of Discovery
Fitness for Duty
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Commercial Grade Dedication
Weld Overlay
Hydrostatic
Past operability
Coatings
Nondestructive Examination
Temporary Modification
Incorporated by reference
Finite Element Analysis
Condition Adverse to Quality
Aging Management
Significance Determination Process
MELLLA
License Renewal
Control of Heavy Loads
Fuel cladding
Biofouling
Liquid penetrant
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Scaffolding
Downpower
Power Uprate
ML08157060728 April 2008New England Coalition, Inc., Contentions 4 Prefiled Exhibits NEC-UW_14 - NEC-UW_22, Volume 2Boric Acid
Weld Overlay
Hydrostatic
Anchor Darling
Temporary Modification
Finite Element Analysis
Aging Management
Through Wall Leak
Scaffolding
Backfit
Flow Induced Vibration
ML08157060628 April 2008New England Coalition, Inc., Contentions 2A and 2B Prefiled Exhibits, NEC-JH_03 - NEC-JH_24, Volume 1Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Aging Management
Dissimilar Metal Weld
ML08157060528 April 2008in the Matter of Entergy Nuclear Vermont Yankee and Entergy Nuclear Operations, Inc., Filing Attaching and Discussing Proprietary DocumentsReactor Vessel Water Level
Non-Destructive Examination
Incorporated by reference
Finite Element Analysis
Aging Management
Operability Determination
License Renewal
Fire Protection Program
Power Uprate
ML08128029421 April 2008Corrected Version, Review of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. Analyses of the Effects of Reactor Water Environment on Fatigue Life of Risk-Significant Components During the Period of Extended OperatioIncorporated by reference
Finite Element Analysis
ML08128023521 April 2008Review of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. Analyses of the Effects of Reactor Water Environment on Fatigue Life of Risk-Significant Components During the Period of Extended Operation (Corrected VersioIncorporated by reference
Finite Element Analysis
ML06192052319 June 2006Entergy'S Supplement to Direct Testimony on NEC Contentions 3 and 4, with Accompanying Compact Disc Containing Supplemental Documents
ML06188045819 June 2006Supplemental Safety Evaluation for the General Electric Topical Report Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, NEDO-24154 and NEDE-24154-P
ML06171009819 June 2006NRC Staff'S Supplement to Its Initial Testimony Concerning NEC Contentions 3 and 4Temporary Modification
Power Uprate
ML06172012614 June 2006Entergy'S Notice of Intent Not to Submit a Rebuttal Statement of Position on New England Coalition Restated Contention 4
ML06142046017 May 2006NRC Staff Testimony of Richard B. Ennis, Steven R. Jones, Robert L. Pettis, Jr., George Thomas, and Zeynab Abdullahi Concerning NEC Contention 3Anticipated operational occurrence
Probabilistic Risk Assessment
Aging Management
Significance Determination Process
Feedwater Controller Failure
ML06142034417 May 2006NRC Staff Testimony of David C. Jeng, Steven R. Jones and Richard B. Ennis Concerning NEC Contention 4Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Temporary Modification
Finite Element Analysis
Aging Management
Significance Determination Process
Design basis earthquake
Operability Determination
License Renewal
Earthquake
Power Uprate
Affidavit
ML0618804502 March 2006Safety Evaluation by the Office of (NRR) Re Amendment No. 191 to Facility Operating License No. DPR-19, and Amendment No. 185 to Facility Operating License No. DPR-25, Exelon Generation Company, LLC, Dresden Nuclear Power Station.Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Power-Operated Valves
Fire Protection Program
ML06188045722 March 1986Letter from Gus C. Lainas (NRC) to J. S. Charnley (General Electric Co.), Dated March 22, 1986, Acceptance for Referencing of Licensing Topical Report NEDE-24011-P-A, GE Generic Licensing Reload Report, Supplement to Amendment 11Fuel cladding
ML0618804615 November 1985Letter from Cecil O. Thomas (NRC) to J. S. Charnley (General Electric Co.), Dated November 5, 1985 (Acceptance for Referencing of Licensing Topical Report NEDE-24011-P-A, Rev. 6, Amendment 11, General Electric Standard Application...
ML0618804714 February 1981Letter from Robert L. Tedesco (NRC) to Dr. G. G. Sherwood (General Electric Co.), Dated February 4, 1981, Subject: Acceptance for Referencing General Electric Licensing Topical Report NEDO-24154/NEDE-24154P
ML06188048231 August 1978NRC Regulatory Guide 1.68, Initial Test Programs for Water-Cooled Nuclear Power Plants, Revision 2 (August 1978)Shutdown Margin
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Internal Flooding
Hydrostatic
ML06188041231 May 1978Newmark, N.M. and W.J. Hall, Development of Criteria for Seismic Review of Selected Nuclear Power Plants, NUREG/CR-0098 (May 1978)Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake