Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20207E0052 March 1999Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation EnclMissed surveillance
Fire Protection Program
ML20236H93830 June 1998Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation EnclSafe Shutdown
Half scram
Foreign Material Exclusion
ML20198P3004 November 1997Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & ViewgraphsSafe Shutdown
Temporary Modification
ML20059C23517 December 1993Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication
ML20247R48122 September 1989Petition for Rulemaking PRM-50-53 Providing Comments on Ocre Petition Requesting NRC to Reopen ATWS Rulemaking Proceeding.No Basis Found for Ocre Petition Since Stability Considered During ATWS Rulemaking
ML20247F1146 September 1989Petition for Rulemaking 50-53 Reopening ATWS Rulemaking Proceeding in Light of Power Oscillations Occurring at Facility Following Dual Recirculation Pump Trip on 880309. Listed Encl Repts Should Be Made Part of RecordAnticipated operational occurrence
Power change
ML20245J01914 April 1989Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants
ML20247N75328 July 1988Petition for Rulemaking PRM-50-53 Requesting NRC Action to Review Undue Risk Posed by BWR Thermal Hydraulic Instability.Nrr Should Issue Order Requiring All GE BWRs to Be Placed in Cold Shutdown for Stated Reasons
ML20151A9095 March 1987Comment Opposing Proposed Rule 10CFR50 Re Licensing of Nuclear Power Plants Where State &/Or Local Govts Decline to Cooperate in Offsite Emergency Planning
ML20151C48826 February 1987Comment Opposing Proposed Rule 10CFR50 Re Licensing of Nuclear Power Plants Where State &/Or Local Govts Decline to Cooperate in Offsite Emergency Planning
ML20087K92321 March 1984Executed Signature Page of Affidavit of M Kaku in Support of 840320 Renewal of Application for Stay
ML20083G0536 January 1984Addendum to Petition for Emergency Relief Per 10CFR2.206 Re Integrated Leak Rate Testing.All Documentation Re Integrated Leak Rate Tests Must Be Made Public
ML20083C27429 November 1983Petition for Emergency Relief Concerning Unsafe Conditions Re Integrated Leak Rate Testing for Us Nuclear Power Reactor Containments.Severe Errors,Defects & Loopholes Exist in Current Methodology
ML20083C27729 November 1983Petition for Emergency Relief Re Primary Containment Leak Rate at Facilities.Unsafe Condition Exists Re Ability of Primary Containment to Fulfill Design Function
ML20082M67129 November 1983Petition for Emergency Relief Concerning Unsafe Conditions Re Integrated Leak Rate Testing of Us Nuclear Power Reactor Containments.Severe Errors,Defects & Loopholes Exist in Current Methodology
ML20023D21411 March 1983P Donahue Show Transcript 08302 Re Nuclear Power Safety. Info Re Facilities & Zack Co Encl
ML20062H41113 August 1982Order Extending Until 820820 Time for Commission to Decide Whether to Review NRR Director Partial Denial of State of Il & B Rorem 820324 Request for Action Under 10CFR2.206
ML20027E14628 July 1982Requests Show Cause Proceeding to Suspend & Revoke Any License Allowing Unit 1 Reactor Operation at or Above Criticality,To Halt All OL Proceedings & Hold Open Public Hearings Re QC Problems & Const Flaws
ML20062B87027 July 1982Transcript of Commission 820727 Public Meeting in Washington,Dc Re Discussion & Possible Vote on Full Power OL for Plant.Pp 1-89
ML20023D03426 July 1982Affidavit of SL Marello Re QC Breakdown & Criminal Falsification at Zack Co,Hvac Contractor at FacilitiesNondestructive Examination
ML20023D03526 July 1982Affidavit of at Howard Re QC Breakdown & Criminal Falsification at Zack Co,Hvac Contractor at Facilities
ML20062B53019 July 1982Decision DD-82-9 Denying Petition for Show Cause Proceeding Against Util for Operation of Unit 1.Decision Re Unit 2 Will Be Made Upon Completion of Evaluation
ML20063E91424 June 1982Affidavit Re Results of Sloppy Concrete Pours,Holes & Honeycombs in Concrete.Accumulated Debris Not Disposed of Prior to Pour & Too Much Concrete Poured at One Time.Worker Health Not Main Concern of Supervisors
ML20054J03322 June 1982Transcript of 820622 Discussion in Washington,Dc Re Full Power Ol.Pp 1-97.Viewgraphs EnclHydrostatic
Affidavit
ML20054F54714 June 1982Order Extending Time Until 820623 for Commission to Decide Whether to Review Director of NRR Partial Denial of Il Friends of the Earth & B Rorem 820428 10CFR2.206 Request for Action
ML20027A7903 May 1982Amend to 820324 Request for Show Cause Proceeding.Nrc Should Expand Investigation of Alleged Potentially Hazardous Condition at Facilities
ML20027A81728 April 1982Request to Institute Show Cause Proceeding to Suspend License Granted on 820417,allowing Fuel Load.Request Due to Holes Bored in Reactor Pedestal,Core Drilling of Concrete Containing Rebar & Voids in Concrete Structures
ML20063E91922 April 1982Affidavit Re safety-related Const Flaws in Installation of Pipes & Supports.Pipes & Hanger Supports Not Placed as Specified
ML20063E92321 April 1982Affidavit Re Damage to Fire Protection Equipment Such as Sprinklers Throughout Plant During Const.Concerns Raised Over Core Drillings of Concrete Reinforcement Bars in Containment Walls & Pedestal.Hangers Not as Specified
ML20063E92421 April 1982Affidavit Re Sloppy Workmanship Leading to Const Damage. Const Crews Core Drilled Through Reinforcement Bars, Containment Wall & Reactor Vessel Pedestal Around 694 Foot Elevation of Unit 1
ML20027E10913 April 1982Comments of State of Il on Util 820331 Presentation to Nrc. Detailed Analysis of All Existing Rebar Damage Repts Incomplete.Extent of Damage Cannot Be Estimated
ML20027E1028 April 1982Excerpt of Transcript from 820408 Hearing in Chicago,Il Re Proposed General Increase in Electric Rates.Certificate of Reporters Encl
ML20027E09031 March 1982Responds to Petition by State of Il Re Reinforcement of Steel Damage During Installation of Cored Holes & Concrete Extension Anchors.Exhibits Encl
ML20053D74224 March 1982Request to Institute Show Cause Proceeding & for Other Relief to Immediately Suspend Consideration of Util Request for Fuel Loading & Low Power Testing in Light of Newly Discovered Safety IssuesSafe Shutdown
ML20027A81617 March 1982Affidavit of D Bridenbaugh Re Adequacy & Quality of Const of Certain Structures at Facilities in Response to Previous Testimony That Steel Reinforcements in Concrete Walls Were Severed During Mod to Safety SysSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Abnormal operational transient
Scram Discharge Volume
Earthquake
Liquid penetrant
Fire Protection Program
Affidavit
ML19208B01713 September 1979Affidavit of Distribution of Fsar,Amend 46
ML19260C43321 August 1979Petition to Institute Proceedings to Suspend or Revoke Cp. Util Did Not Consider Hydrodynamic Loads That Result from Dynamic Effects of Drywell Air & Stream Forced Into Suppression Pool During LOCAEarthquake
ML19276G88721 August 1979Petition by Citizens Against Nuclear Power,Il Valley Citizens Against Nuclear Power,Citizens United for Responsible Energy & Appleseed to Institute Proceeding to Suspend &/Or Revoke LicenseEarthquake
ML19209A82221 August 1979Requests That NRC Suspend or Revoke License of Util to Const Nuclear Power Plant Using Mark II Containment Design.Major Design Changes in Essential Safety Sys Are Under Review. Certificate of Svc EnclEarthquake
ML17266A35427 March 1979Endorsement 99 to Maelu Policy MF-22
ML20062A89325 September 1978Indemnity Agreement B-84