ML20087K923

From kanterella
Jump to navigation Jump to search
Executed Signature Page of Affidavit of M Kaku in Support of 840320 Renewal of Application for Stay
ML20087K923
Person / Time
Site: Diablo Canyon, LaSalle  
Issue date: 03/21/1984
From: Kaku M
JOINT INTERVENORS - DIABLO CANYON
To:
Shared Package
ML20087K921 List:
References
NUDOCS 8403260369
Download: ML20087K923 (1)


Text

t III.

CONCLUSION i

l 16.

The transition from zero to 5% power is a qualitative one.

Certain of the major accidents that are postulated for a reactor operating at 100% full power can also occur within a longer timeframe in a reactor operating at low power.

This is because the radioactive inventory stored in a reactor operating at 5% is roughly half a billion curies, which is similar to the radiation inventory studied in WASH-740 and is 10,000 times the radiation released at Windscale in 1957.

The probability calculations done in WASH-1400 have been largely undermined by other scientists.

Quite frankly, no one knows how to calculate the probability of Class IX accidents correctly.

Consequently, I conclude that even the routine operation of the Diablo Canyon reactor at up to 5% power presents a significant safety hazard to the surrounding environment and to plant workers and poses a risk of the irreversible contamination of the reactor.

Executed this 81 day of March, 1984, at New York City, New York.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

DEV5E SMIDI Comm::sionercf Decd Cey of f.evi York @. 3 3427 Cer:itca:e Fded m f;ew York Coun>f Cxnsson Expires Januaryf.19% DR. MICHIO KAKU J.,

l

\\

i 8403260369 840322 PDR ADOCK 05000275 O PDR 9

--